2013-2542013-254
Resolution Authorizing Change Orders Nos. 1&2 For UWWD Water Main Extension To
NYC DEP Shaft 6 Site Contract #12-007
At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County,
New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on
November 12, 2013.
The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being
called, the following were present:
PRESENT: Supervisor
Councilmembers
_ Barbara Gutzler
_ William H. Beale
Vincent F. Bettina
Ismay Czarniecki(Arrived at 7:32 PM)
Michael Kuzmicz
ABSENT:
The following Resolution was introduced by Councilman Bettina and seconded by
Councilwoman Czarniecki.
WHEREAS, by Resolution adopted by the Town Board on February 25, 2013, the Town
Board awarded a bid to W. M. Shultz Construction, Inc. in the amount of $4,229,530.00 for the
installation and construction of a 12 inch water main from a point of connection with United
Wappinger Water District (UWWD) to the New York City Department of Environmental
Protection (NYC DEP) Shaft 6 site; and
WHEREAS, the Engineers to the Town, Morris Associates Engineering Consultants,
PLLC, have approved two Change Orders as hereinafter set forth, which two Change Orders will
result in a new contract price of $4,197,562.25.
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. The recitations above set forth are incorporated in this Resolution as if fully set
forth and adopted herein.
2. The Town Board hereby approves Change Order No. 1 which decreases the
contract price by the amount of $39,308.70, resulting in a new contract price of
$4,190,221.30, a copy of which Change Order is attached hereto and made a part
hereof as Exhibit "1 ".
3. The Town Board further approves Change Order No. 2 which increases the
contract price by the amount of $7,340.95, resulting in a new contract price of
$4,197,562.25, a copy of which Change Order is attached hereto and made a part
hereof as Exhibit " 2".
The foregoing was put to a vote which resulted as follows:
BARBARA GUTZLER, SUPERVISOR Voting: AYE
WILLIAM H. BEALE, COUNCILMAN Voting: AYE
VINCENT F. BETTINA, COUNCILMAN Voting: AYE
ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE
MICHAEL KUZMICZ, COUNCILMAN Voting: AYE
Dated: Wappingers Falls, New York
11/12/2013
The Resolution is hereby duly de~el~red adopted.
MICH J. LEON OWN CLERK
.,_I
CC I ))
~xh;b~-~- , ,
i
CHANGE
ORDER
PROJECT: CHANGE ORDER NUMBER: 1
TOWN OF WAPPINGER ~ DATE: September 9, 2013
UNITED WAPPINGER WATER DISTRICT
WATER MAIN EXTENSION 70 NYCDEP '
Contract # 12-D07 ,
TO CONTRACTOR: ENGINEERS PROJECT NO.: W21215.060
SCHULTZ CONSTRUCTION
M
W
.
.
PO BOX 2fi20 CONTRACT DATE: FEBRUARY 2013
BALLSTON SPA, NEW YORK 12020 CONTRACT FOR:
WATER MAIN AND APPURTENANCES
The Contract Es changed as follows:
Actual, installed quantifies varied from the estimated quantities included in the contract. A summary
of actual versus estimated quantities is attached. Payment for various items of miscellaneous extra
work, as shown on the attached summary is included. Credits for various items, as shown on the
attached summary are also included. The final contract sum is considered full and final payment for
all labor, equipment, materials and services required by the work_
NOT VALID UNTIL SIGNED BY THE OWNER, ENGINEER AND CONTRACTOR.
The original Contract Sum was .......................................................................................... $ 4,229,530.00
Net change by previously authorized Change Orders ..................................................... $ 0.00
The Contract Sum prior to this Change Order was ............................................:.............. $ 4,229,530.00
The Contract Sum will be decreased by this Change Order in the amount of .... .........::...: $ 39,3D8.70
The new Contract Sum including this Change Order will be ....................... $ 4,190,221.30
The Contract Time will be decreased tsy .:............................................. 13 days
The da#e of Substantial Completion as of the date of this Change Order therefore is.....August 28,2013
ENGINEER CONTRACTOR OWNER
Morris Associates W.M. Schultz Construction Town of Wa in er
ADDRESS ADDRESS ADDRESS
9 Elks Lane PO Box 2620 Town Hall
Poughkeepsie, NY 12501 Ballston Spa, NY 12020 20 Middle Bush Road
Wa in ers Falls NY 12590
BY: BY: BY:
DATE: DATE: DATE:
E:ldocuments\T Wappingerla W20121W21215 NYCDEP Extension\V~1212i5.06 CONS7RUC170N\CIiANGE ORDERS\43 09 09
REV C01.doc ~
~`
I
i
NYCDEP EXTENSION CO 1 SUMMARY
91812018
8 C G N
A
flan Caedplion OfWak E J16ruEad U n6 UNIT SehOdu0ld AGwI ToW ddteronce
O twntlq' Price Vd08 ~wnUH ACWelS
No.
Y tbn
01tl 1 t o 90000 S m tm 790,000,00 SOm
OOU
B 7a
o
onds 1 L S 31000 6 94&00.00 1.00 571,000.00 fOm
001E
M e
c 2L 6 8000 S 1000.00 2m 518000m SOm
OO1C
l wt
n
e
Ymib 11. a 10000 S 10mDm TAO 5'10,000&0 SOm
0010 b
Ad Ib D 10 Y O 730 S 7,SOOm 10&0 A m SOm
001E P
OD1F S eoanwn
ebtnBfek t ! B 15000 S 1S .00 1A0 515 AO a0m
OOtG to Constructlwt Serrlou 10 A 10 1600 a ta000m 10&0 a15 00 SOm
Oo1H 0 u WconsOUNen n< 1l 6 '
E nt 1 L 6 17000 7 1 o9Dm tm 2&00.00 boAO
wma
WmMe 1 L 6 8000 S 6,000&0 1A0 SO 90m
fJeasout Oooumentelbn 11 6 SoD s SOOm 1m S5D0.00 50&0
bem0Y9atlon 1 L E tiooo s aoaom 1.oD ss a6m
oorA 1 r wabr Y-in b roam aesd ID3D L P
M.bn lrvdebv ID7D LP 120 s 487&00.00 7,7e9m a1o178aoD n9am
0029 it Wsbmtakt afl Rwd 8060 LP 7 10.00
kwaB WMer Min 80W i f 71 S 571550m 7,539.00 S71i709m 781
Ratbn6en 6060 LP 1 32700m T AO 570.166.00 A44
OO2C 1r Wdar W in ofl ROW 46~ ~ 5 ~'~
BuWItr VIWer 1510 LP 161 7S09IOm ]A2im ae77181.00 i106741m
RasYeaSOn 1510 LF 8 10880&0 S,82im 782,788.00 1162Bm
0020 Ir Wabr Vain Wl K4Xale 410 LP 186 67J50.00 Om SOm ASOm
002E SWebrYsln hTown Read 70 LP 130 7 9,100m i71m
S 517 00
St1 S7y30m
A
ooSF YWalrYein ON Rwd 90 LF 2A0 18,000m S
m
0021 11'Bond Waler Msbt 1100 LF 700 5 120.OODm 1 4m 7574,200m 134700m
001N 11"Fond Waler Yab Rook SID 80 S 45700m Om SDm 700m
008 14'HDPEWaIr Ydn CHG iEAtne 620 LF 115 5 71 m 72Sm i6:1 78&0 51 TSm
W7A 12'Oab YaMS S9 8a 2000 118000.00 S6m S118AOOm fS2 00
DOSE i' Dab Vaiws B Ea 1000 a BAOOm 10m 710 .DD .W
OOIA H n1s IB 6 5500 a 289 AO Sim S7A0500.0D 511 .00
OHO
001E
006& 81a11on
7k• c don 81 Ctn- eenasad Ceu a s 1
it Es
6 2SOD
t400 i M tm
7Dm 00
S98 m
05
00 S
1
ODOE 7/4'Co rP In Pelyd Arw 710 LF S 1.350.00 301m .
515
OOOC 7!1'Co P bUn dAnas 585 1F 17 5 B,91Sm 178J7 53,010.11
OD6D 1' Co sn 6b Cwb Blo a, Bons and Ce 90 6 1900 5 80100m 36m 766AOOm a0m
005E 1"C P b la Paved Anms ZIO LP B S 5,410.00 751.00 52.108.00 aQ6e.00
006E 1"CO rPi b In Un Ama 280 LF 14 S 3 .00 298&2 i] 7A8 1621
0066 2" entba 8b Onb 8etces aedCw 1 Ea 1100 1AOOm 1m atAODm SOm
006R 2'CO P 10 1P 70 ' 1&60.00 Bm m 9DA
00H t' NDPE P In U ead Antr 200 LP 6 S 1,000.00 89.00 S18Dm 0
OOBaA Tastl Srvicae 1 L6 0 S OAO 50.00 SOAO
Pwwia Teri6tlYdedWabrMekr 1 LB 28000 5 2a000m 1m a26 00 SOm
Com T b ~ 2000 S 10000m SAO S70 .DO SOm
007Ak Rwd [7alep and Ytco 1 L6 5
Realare0an 2D Ea 1760 5 75000,00 20.00 5 m 60.00
a+al RotOTmroh 4030 LF 62 5 209580.00 IA90m 5209 m a0.00
To On WheNer FlE Road 1 L9 113665 5 113 SAD tm S113ABSm a0.00
F6E1 Rea1on5en R'war Road i LB 35000 S DDm im S35 m SOm
Gs bemolGOn 1 LS 20000 i 20 00.00 1.00 S20AOOm SOm
PJwldn setWnfor Ka 1 LS 7600 a 7500m tm aT500.00 S0m
Reebn Fancy VvMSand MYlhotpq 1 LS 95000 ffiOOOm 1m S75 m 50.00
D06AR Roek Removal 1400 CY 1 a 1 m 159m 0159.00 1 1.
00lAAY Reneval efTmes tr b1!"blameler /0 6a 880 000,00 B9m 54B .DO 520,950.00
o09E/1k Removal efTntes 24'DlemeMand Aasve 10 Fa 700 28&00.00 Mm m S2 ODD
OseC Proteclbn dTrvc 180 ES W a 1 m 18&0 S7 m 11,520.
0010AR CMa d Tyre and BneM M efl ReW AMS 1 LS 120000 S 1 Dm 1.00 5120 m SO.OD
OD11A0 Eaeera8ort 10 Ea 110 0 5 ti m ltAO 572100m %,100.00
ootA Albweaw Bella F9l CrtsMrAnn 1700 CY S OS S1 WOm 189.00 74770m
- .0
OOTBABowansa P51 coa1nlMd Detu Poi 10 0 CV 6 5 5 m Om SOm SB,SOOA
DDtc a5vwenae seket Fl9 Rm at sank Gnvd eg o CY 7 D s zr DDOm O.OD fOm c2+roo.
D01D ABorano le4 PM 6abe1 Graded Onad ag o CT 3 D a 24 DOOM Om tom 0.
002AIkrwrrce YlxAdd6tonai Wart 1 L8 16000 0 a 150000m 0.4d 384 .49 5,599.61
Auelerabdined 1 t8 1B2F7.3 B
MIOCMO B0 EleAic9ervlce 1 LB 87157 8
Relocab WPZukWCb7 1lb 4
Rabe d N Oan Place 1 LS 8793 7
ewltauwFPoMn / L8 8287 4
urdwdren elCvawalh 1 La 2127& 8
CBeBevrdoin 1 La 6984.1 9
Pavement WhMIN NE Road 11.5 7226J S
Ssgy PavaneM Whealeriil RoW 1 LS 11,163& 7
E7dtavrork el9D duet Wapigns vaW 1 L] 78&7&0 1
Caaek brC : Pda }Orl aee{ 1 LS JD7.7 6
4RW Ia
OnAI for Ir1111eed R09
0
L8
35000
S
1
SA00.
Sm0
CmdB for PVC
CnoS ley Dab6on dls-BuY 0
O L6
L$ -707a1e
•10000
S 1
1 57,07&1
tOmO. &78.1
S10A00.
Torsi Base Gert8racl S t2! OJD 190 .7D 598700.70
i
C~ 1 ~~
~xh-b~-~ <<Z>>
CHANGE
ORDER
PROJECT: CHANGE ORDER NUMBER: a
F WAPPINGER
TOWN O 2013
DATE: October 29
UNITED WAPPINGER WATER DISTRICT ,
WATER'MAIt~F'I=X~TEN810N~T0-N'YCDEP__........._ .---._._...._._.._._.____..._...._.._......_ .........................-•----.-.--..........
Contrast # 12-007
TO CONTRACTOR: ENGINEERS PROJECT NO.: W21215.060
W.M. SCHULTZ CONSTRUCTION
PO BOX 2620 CONTRACT DATE: FEBRUARY 2013
BALLSTON SPA, NEW YORK 12020 CONTRACT FOR:
WATER MAIN AND APPURTENANCES
The Contract is changed as follows:
Compensation to various land owners was provided for free replacement A berm was constructed
at #125 New Hamburg Road to address the concerns of the landowner, and additisnal milling,
beyond contract limits was performed to provide for smooth transitions between new and existing
pavement The revised contract sum is considered full and final payment for ap labor, equipment
materials and services required by the work.
NOT VALID UNTIL SIGNED BY THE OWNER, ENGINEER AND CONTRACTOR.
The original Contract Sum was .......................................................................................... $ 4,229,530.00
Net change by previously authorized Change Orders ...............:..................................... $ (39,308.70)
The Contract Sum prior to this Change Order was ........................................................... $ 4,190,221.30
The Contract Sum will be increased by this Change Order in the amount of ...................... $ 7,340.95
The new Contract Sum including this Change Order will be ................................................ $ 4,197,562.25
The Contract Time will be decreased by ............................................... 0 days
The date of Substantial Completion as of the date of this Change Order therefore is.....August 28,2013
ENGINEER CONTRACTOR OWNER
Morris Associates W.M. Schultz Construction Town of Wa in er
ADDRESS ADDRESS ADDRESS
9 Elks Lane PO Box 2620 Town Hall
Poughkeepsie, NY 12601 Ballston Spa, NY 12020 20 Middle Bush Road
Wa in ers Falls NY 12590
BY: PE BY: BY:
DATE ~ ~~ ~/~~ DATE: DATE:
`~ ~