2014-0482014-48 Resolution Confirming Appointment of Engineer and Authorizing Preparation of Design Plans & Specifications for Electrical Repairs for the Wappinger Challenger Field At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on January 13, 2014. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers Barbara Gutzler William H. Beale Vincent F. Bettina (Arrived at 7:33PM) Ismay Czarniecki Michael Kuzmicz ABSENT: The following Resolution was introduced by Councilman Kuzmicz and seconded by Councilman Beale. WHEREAS, the Town of Wappinger was previously granted a $50,000.00 Community Development Block Grant (CDBG) for the construction and installation of various handicapped accessible improvements at the Challenger Fields at the Robinson Lane Sports Complex; and WHEREAS, one of the improvements included the installation of a Mobile ADA Restroom at the Challenger Field; and WHEREAS, the Town caused the construction and installation of the handicapped accessible Mobile ADA Restroom, including high efficiency air conditioning and forced air heat at an approximate cost of $25,400.00, leaving a balance remaining in the CDBG of approximately $24,600.00 for additional improvements to the Challenger Field; and WHEREAS, Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals, was the design engineer who prepared the plans and specifications and oversaw the construction and installation of the various improvements; and WHEREAS, by Resolution adopted by the Town Board on Apri122, 2013, the said Greg W. Bolner, P.E. was given approval to change the scope of his work in connection with the 2013 CDBG; and WHEREAS, because there remains approximately $24,600.00 of the CDBG of $50,000.00 granted to the Town in 2013, the Town wishes to utilize said funds for required electrical installation and improvements at the Challenger Field; and WHEREAS, by letter dated December 16, 2013 to Greg W. Bolner, P.E., the Town Supervisor confirmed that Clark Patterson Lee has been authorized by the Town of Wappinger to continue to provide engineering services to the Town in connection with the bidding and installation of electrical connections required at the Challenger Field with the cost of said design, construction and installation of the electrical services to be paid from the balance of the 2013 CDBG previously granted to the Town. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board expressly confirms that the Town of Wappinger has authorized Greg W. Bolner, P.E. to prepare all engineering design plans and specifications for the construction and installation of electrical services to the ADA Mobile Restroom 3. .The Town Board expressly authorizes Greg W. Bolner, P.E. to advertise for bids for such electrical installations with the understanding that the project will be completed no later than April 18, 2014, in time for the 2014 sports season, in accordance with the projected schedule of milestones attached hereto as Exhibit «1,~ The foregoing was put to a vote which resulted as follows: BARBARA GUTZLER, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE MICHAEL KUZMICZ, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 1/13/2014 The Res i n ' hereby SEPH P. PA ONI, ~ declared adopted. CLERK