Loading...
Addendum 2ADDENDUM NO.2 TO CONTRACT NO 13-006 CONSTRUCTION BID AND CONTRACT FOR WATER MAIN EXTENSION TO CHELSEA HAMLET TOWN OF WAPPINGER March 25, 2014 NOTE: This Addendum farms a part of tine contract documents. Acknowledge receipt of this addendum in the appropriate location on the bid. GENERAL The following addendum including changes, additions and/or deletions are hereby made a part of this contract. Some people may have inadvertently received plans associated with the Route 9 loop as part of the attachments to Addendum No. 1. This contract is only for the Chelsea Hamlet extension and a separate contract is being bid for the Route 9 loop. Delete any Rou#e 9 plans, including any plans on NYSDOT revisions. Addendum No. 1 deleted the horizontal directional drilling specifcation section for the water main installation. All requirements for installation of service lines shall remain, including the installation of services by altema#ive methods such as boring, pulling or vibratory mole where open cutting is not permitted. Page 1 of 1 E:ldocumentslT Wappingerla W2012\W21215 NYCDEP Extension1W21215.1 Chelsea Hamlet EMensionlSubmissions & ApprovafslContracil3-OOS ADD2_032514_doc