Addendum 2ADDENDUM NO.2 TO CONTRACT NO 13-006
CONSTRUCTION BID AND CONTRACT FOR
WATER MAIN EXTENSION TO CHELSEA HAMLET
TOWN OF WAPPINGER
March 25, 2014
NOTE: This Addendum farms a part of tine contract documents. Acknowledge
receipt of this addendum in the appropriate location on the bid.
GENERAL
The following addendum including changes, additions and/or deletions are hereby made
a part of this contract.
Some people may have inadvertently received plans associated with the Route 9 loop
as part of the attachments to Addendum No. 1. This contract is only for the Chelsea
Hamlet extension and a separate contract is being bid for the Route 9 loop. Delete any
Rou#e 9 plans, including any plans on NYSDOT revisions.
Addendum No. 1 deleted the horizontal directional drilling specifcation section for the
water main installation. All requirements for installation of service lines shall remain,
including the installation of services by altema#ive methods such as boring, pulling or
vibratory mole where open cutting is not permitted.
Page 1 of 1
E:ldocumentslT Wappingerla W2012\W21215 NYCDEP Extension1W21215.1 Chelsea Hamlet EMensionlSubmissions &
ApprovafslContracil3-OOS ADD2_032514_doc