2005-11308/29/2005.RGM
The following Resolution was introduced by Councilwoman McCarthy and
seconded by Councilman Valdati.
WHEREAS, John Goetze deposited a total of Twelve Thousand Five Hundred
dollars and 00/100 ($12,500.00) dollars on various dates in escrow money
with the Town of Wappinger for properties on Keenan Acres and
WHEREAS, George Kolb, Building Inspector in a letter Dated June 25, 2005
has approved that the following unused escrows he refunded for properties on
Keenan Acres Subdivision;
Address Description Amount
42 Hillcrest Ct.
Seeding
$1,500.00
25 Hillcrest Ct.
Seeding
$1,500.00
32 Hillcrest Ct.
Seeding
$1,500.00
19 Hillcrest Ct
Seeding/Driveway
$1,500.00/$1,000.00
29 Hillcrest Ct
Seeding
$1,500.00
45 Hillcrest Ct.
Seeding/Driveway
$1,500.00/$1,000.00
36 Hillcrest Ct.
Seeding
$1,500.00
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. The recitations above set forth are incorporated in this Resolution as if
fully set forth and adopted herein.
2. Payment is approved in the amount of Twelve Thousand Five Hundred
and 00/100 dollars ($12,500.00) made payable to John Goetz, for the
refunds of the unused escrows for properties in Keenan Acres
Subdivision.
The foregoing was put to a vote which resulted as follows:
Joseph Ruggiero, Supervisor
Voting
Aye
Robert Valdati, Councilman
Voting
Aye
Vincent Bettina, Councilman
Voting
Aye
Maureen McCarthy, Councilwoman
Voting
Aye
Joseph Paoloni, Councilman
Voting
Aye
The Resolution is hereby duly declared adopted.
RESOLUTION NO. 2005-113
RESOLUTION ACCEPTING THE MAP, PLAN & REPORT FOR TH
FLEETWOOD WATER DISTRICT —EXTENSION I
The following Resolution was introduced by Councilman Bettina and
seconded by Councilwoman McCarthy.
WHEREAS, as the Engineers to the Town of Wappinger, Paggi, Martin &
DelBene, have made a second amendment to the original Map, Plan & Report
for the Fleetwood Water District -Extension I to increase the maximum
amount to be expended on the project from $88,500 to $146,500 to reflect the
current local bidding climb in industry wide construction cost increases since
the initial construction cost estimate and the additional engineering cost to
put the project out to bid.
08/29/2005.
NOW, THERFORE, BE IT RESOLVED, that the Town Board hereby acc
the Second Amended Map, Plan & Report for the Fleetwood Water Distri
Extension I dated August 8, 2005 as prepared by the Engineers to the To
of Wappinger, Paggi, Martin & DelBene and directs same to be placed on
in the Town Clerk's Office.
The foregoing was put to a vote which resulted as follows:
Joseph Ruggiero, Supervisor
Voting
Aye
Robert Valdati, Councilman
Voting
Aye
Vincent Bettina, Councilman
Voting
Aye
Maureen McCarthy, Councilwoman
Voting
Aye
Joseph Paoloni, Councilman
Voting
Aye
The Resolution is hereby duly declared adopted.
RESOLUTION NO.2005-114
IN THE MATTER OF A PROPOSED INCREASE (PURSUANT TO
SECTION 209-h OF THE TOWN LAW) IN THE MAXIMUM AMOUNT
AUTHORIZED TO BE EXPENDED IN CONNECTION WITH THE
ESTABLISHMENT OF AN EXTENSION TO THE FLEETWOOD WATER
DISTRICT IN THE TOWN OF WAPPINGER, DUTCHESS COUNTY, NEW
YORK, KNOW AS EXTENSION NO. 1 TO THE FLEETWOOD WATER
DISTRICT
The following Resolution was introduced by Councilman Bettina and
seconded by Councilwoman McCarthy
WHEREAS, after all necessary proceedings were duly had and taken in accordance
with the provisions of Article 12-A of the Town Law, the Town Board of the Town of
Wappinger, Dutchess County, New York, has heretofore duly established Extension No.
1 to the Fleetwood Water District, at a maximum estimated cost of $88,500 and
authorized improvements therefore, consisting of wet tapping the existing main,
installing a corporation stop, fittings, and three quarter inch "K' copper water service
piping terminating at a curb valve in the road right-of-way in front of each lot, boring to
cross Osborne Hill Road and the purchase (but not the installation) of water meters,
and incidental improvements and expenses in connection therewith; and
WHEREAS, it now appears that such maximum estimated cost must be
increased by $58,000 to a new maximum estimated cost of $146,500, pursuant
to Section 209-h of the Town Law; and
WHEREAS, there are no hook-up fees proposed to the typical property in
Extension No. 1; and
WHEREAS, the estimated cost of Extension No. 1 to the typical property
(single family home) therein for such capital cost, assuming the proposed
amortization of twenty years, is $306 and the cost to the typical property
therein for operation and maintenance is $220, each in the first year in which
debt service , operation and maintenance and other charges and expenses are to
be paid; and
7