Loading...
2015-209 2015-209 Resolution Authorizing Town's Professionals To Undertake All Work Necessary To Make Capital Repairs To The Mid-Point Park Sewer Plant On An Expedited Basis At a Regular Meeting of the Town Board of the Town of Wappinger,Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls,New York, on September 29, 2015. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called,the following was recorded: ✓Uote'Record-Resolution RES=2015-209 Q Adopted Yes/Aye No/Nay Abstain Absent, ................................. ❑ Adopted as Amended Barbara Gutzler Voter Q ❑ ❑ ❑ _ ❑ Defeated William Ciccarelli Voter Q ❑ ❑ ❑ ❑ Tabled William H.Beale ( Seconder Q ❑ ❑ ❑ .......................................................................... ❑ Withdrawn Ismay.Czarniecki Voter ❑ ❑ 11Q ..............................>.................................................e..............................................................................................;........................ Michael Kuzmicz (Mover I Q ❑ ❑ ❑ The following Resolution was introduced by Councilman Kuzmicz and seconded by Councilman Beale. WHEREAS,the Mid-Point Park Sewer Improvement Area(hereinafter"Mid-Point") was authorized by Resolution of the Town Board on June 10, 1974; and WHEREAS,Mid-Point was formed for the purposes of acquiring a sewer treatment plant,trunk lines, sewer laterals, pumping stations and associated facilities to serve the Mid- Point Park development,now known as Royal Ridge; and WHEREAS,the sewer plant was thereafter completed and constructed by the developer at no cost to the Town and was thereafter dedicated to the Town of Wappinger; and WHEREAS,the Town has continuously operated the sewer treatment plant; and WHEREAS,the New York State Department of Environmental Conservation(NYS DEC), by report dated March 2014, determined that there were exceedances of the permitted flow at the plant; and WHEREAS,negotiations ensued between NYS DEC and the Engineers to the Town to finalize a flow management plan to address infiltration and inflow(I &I), believed to be the source of the exceedances; and WHEREAS, an attorney for the NYS DEC has advised the Attorney to the Town, Albert P. Roberts,that NYS DEC intends to submit an Order on Consent(Consent Judgement) which will require the Town to undertake required repairs as soon as is practicable; and WHEREAS,the terms and conditions of the flow management report and schedule of construction has not been approved and decided upon by NYS DEC,however, it is anticipated that approvals will be forthcoming in the near future; and WHEREAS,the quarterly O &M charges for a typical residential user is $732 per year; and WHEREAS,the projected costs for the initial capital repairs are estimated to be $300,000; and WHEREAS,rules and regulations of the New York State Office of the Comptroller, Department of Audit and Control, requires Audit and Control approval whenever costs to a typical homeowner exceeds $709 per year for sewer services, including O &M and capital assessments; and WHEREAS, since the current O &M charges to a typical homeowner exceeds $709 per year, Audit and Control approval will be required for the issuance of any serial bonds to pay for these improvements. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. The Town Board acknowledges the importance of making the required capital improvements at the Mid-Point Park Sewer Plant on an expedited basis, and as quickly and expeditiously as possible, and hereby authorizes the Engineer to the Town,the Attorney to the Town and the Town's Bond Counsel to undertake all steps necessary for the Town to make any required capital repairs to the Mid-Point Sewer Plant, including, but not limited to,the preparation of a Map, Plan and Report, the simultaneous preparation of plans and specifications for the proposed work in anticipation of submitting same to competitive bidding, application to the NYS Comptroller's Office, Department of Audit and Control,negotiations with NYS DEC regarding the implementation of such improvements, causing the formation of another Improvement Area or, more preferably, the formation of a Sewer District serving the area previously served by the Mid- Point Sewer Plant, negotiating with NYS DEC as to the terms and conditions of any proposed Order on Consent(Consent Judgment) and such other legal, engineering and professional work as may be necessary to complete required repairs to the Mid-Point Park Sewer Plant as soon as circumstances allow and within the time frame mandated by NYS DEC. The foregoing was put to a vote which resulted as follows: RESULT: ADOPTED [UNANIMOUS] MOVER: Michael Kuzmicz, Councilman SECONDER: William H. Beale, Councilman AYES: Barbara Gutzler, William Ciccarelli, William H. Beale, Michael Kuzmicz ABSENT: Ismay Czarnecki Dated: Wappingers Falls,New York 9/29/2015 The Resolution is hereby duly declared Adopted. _ J EPH P. PAOLONI, TOWN CLERK