Loading...
Getty Gas Station- Lukoil PAGGI,MARTIN&DEL BENE LLP Consulting Engineers & Land Surveyors 56 Main Street Poughkeepsie,New York 12601 845-471-7898 845-471.-0905 (FAX) January 9, 2007 VIA FAX a MAIL: �,� �,.,y.Ott^„ I' Planning Board REC RECEIVED Town of Wappinger I �� 20 Middlebush Road Wappingers Falls, New York 12590 TOWN CLERK TOWN CLERK Reference: Getty Gas Station #169 Site Plan NYS Route 9 Dear Board Members: On December 27th, 2006 this office received Site Plans Sheets 1-9, and Sewage Disposal Sheets 1-3 for the Getty Gas Station #169 Site Plan. All Plans were prepared by High Point Engineering and are stated last revised December 40i, 2006, as prepared by All outstanding engineering related concerns from our October 24" 2005 review letter have been addressed. We have also reviewed the November 21St, 2005 Resolution of Site Development Plan Approval and would note the following: • 2.b.1):The Zoning Administrator should verify that the Resolution has been signed. • 2.b.2): Satisfied The Town Tax Collector has verified that the taxes have been paid. • 2.b.3): Satisfied. The Applicant obtained DCHD approval on June 20"', 2006. We would note that this approval is just for a septic tank/ holding tank setup. No subsurface sewge disposal system is proposed_ • 2.b.4): Satisfied In his July 26h, 2006 Compliance letter, the Town Planner indicated that the traffic signage is satisfactory. • 2.b.5): Sadsfied. In his July 26"', 2006 Compliance letter, the Town Planner indicated that the onsite truck turning movements are satisfactory. • 2.b.6): Satisfied. In his July 26"', 2006 Compliance letter, the Town Planner indicated that the landscape plans are satisfactory. • 2.b.7): Satisfied. All outstanding engineering related concerns from our October 24"', 2005 review letter have been satisfied. • 3.a: Satisfied.As per his.December 80', 2006 Compliance letter, the.Town Planner indicated that the location of the wetlands on the Plans is satisfactory. • 3.b: Satisfied The covers on the two existing drywelis in front of the gas island canopy have been revised to indicate solid covers as requested. • 3.c: SatfsNed.As per his December 80', 2006 Compliance letter, the Town Planner indicated that the note regarding pesticides has been satisfied. Joseph E.Paggi,Jr.,P.R. Ernst Martin,Jr.,P.E.,L.S, Charles R.Del Bene,Jr,,P.E. 1962-2006 Planning Board -2- January 9, 2007 RE: Getty Gas Station #169 Site Plan • 3.d: Satisfied The sidewalk has been constructed along Route 9, therefore no bond or escrow account is required. Please feel free to contact this office if you have any questions regarding this matter. Thank you. Very truly yours,(bi11 eph E. Paggi, Jr., P.E. JEPIPJP cc: Hon. Joseph Ruggiero Han. Chris Masterson Town Board: File Hon. Graham Foster Albert P. Roberts, Esq. Chris Holme Tatiana Lukianoff John V. Catapano, P.E. Lawrence Kuo, P.E.- High Point Engineering TOWN OF WAPPINGER ZONING ADMINISTRATOR SUPERVISOR TATIANA LUKIANOFF JOSEPH RUGGIFERO TOWN COUNCIL VINCENT BETTINA MAUREEN McCARTHY JOSEPH P. PAOLONI ZONING DEPARTMENT ROBERT L.VALDATI 20 MIDDLESUSH ROAD WAPPINGERS FALLS, NY 12590 (845)297-5257 . September 8, 2006 FAX:(845)297-0579 RF-CEIVEC Hon. Joseph Ruggiero, Supervisor CLERK Town Board TOWN Re: Getty Gas Station—Security for Installation of Sidewalk North Fork Bank Account No: 3021117480 Site Location: Route 9 Tax Grid # 6157-02-578955 HB zone 9.6 acres Applicant: Catapano Engineering Dear Supervisor Ruggiero, This office had received an Acknowledgement of Assignment from Forth Bork Bank, 210 Mineola Boulevard, Mineola, New York, that an account had been established by Montgomery Distributors LLC in the amount of$18,000.00 to be held as security for the construction of a sidewalk at the above referenced location. (see attached copy) The construction of said sidewalk was required as part of the Site Plan& Special Use Permit approvals. The sidewalk has been installed. Mr. George Kolb, Director of Code Enforcement, has inspected the work and has deemed it acceptable. The account can therefore be released and I ask that the Town Board authorize this release in written form. Very truly yours, Tatiana Lukiano Zoning Administrator attachment M. Mr. Chris Masterson, Town Clerk Mr. Phil Dilonno, Planning Board Chairman Mr. Al Roberts,Attorney to the Town Mr. Jay Paggi, Engineer to the Town file North Fork Ba n k To: .Town Board of the Town of Wappinger 20 Middlebush Road Wappinger Falls, NY 12590 ACKNOWLEDGEMENT OF ASSIGNMENT North Fork Bank located at 210 Mineola Boulevard, Mineola, New York hereby acknowledges receipt of a copy of the Assignment of Title of Account: Montgomery Distributors LLC Account No.: 3021117480 Minimum Amount: $18,000 posted as security for the construction/installation of a 5' sidewalk as required by resolution of the site plan approval granted on November 21, 2005 by the Town of Wappinger Planning Board for parcel number 578955 on tax map number 6157 map 02 in the Town of Wappinger, Dutchess County,New York. The Bank acknowledges that the Town of Wappinger may withdraw any or all of the funds upon resolution of the Town Board of the Town of Wappinger, without notice to the assignor. Furthermore, the account shall not be reduced or released except upon written authorization by the Town Board of the Town of Wappinger as evidenced by a release certified by the Town Clerk. It is understood this assignment shall remain in full force and effect until so released by the Town of Wappinger. The Bank further represents that signer of this letter is an official authorized to bind the Bank as to the contents of this letter. North Fork Bank 7 By:E Linda Doerrbecker, Branch Manager STATE OF NEW YORK ) ss.. COUNTY OF NASSAU ) On the 22nd day of November, 2005 before me, the undersigned, a Notary Public in and for said state, personally appeared Linda Doerrbecker,personally known to me or proved to me on the basis of satisfactory evidence to be the individual(s) whose name(s) is (are) subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their signature(s)on the instrument,the individual(s),or the person upon behalf of which the individuals)acted,executed the instrument. DENISE C.FERTITTA. NQTAIlY PUBLIC StateofNewYork ��� No.01F6959267 Qualified in Nassau County Commission Expires November 27,4- Notary Public 210 Mineola Blvd., Mineola NY 11501 —Phone 516 742-1500 Fax 516 742-0414 Montgomery Distributors LLC 90 MERRICK AVENUE,SUITE 500 EAST MEADOW,NEW YORK 11554 TELEPHONE: (516)683-0200 FACSDAUZ (516)683-0246 i ASSIGNMENT To: Town Board of the Town of Wappinger 20 Middlebush Road Wappinger Falls,NY 12590 . Please take notice that the below referenced account is hereby unconditionally assigned to the Town of Wappinger as and for security in connection with the development of a site plan/subdivision for tax map no. Section 6157, Map 02, Parcel 578955 entitled Getty Gas Station number 169. Approved by the planning board of the Town of Wappinger on November 21, 2005. The Town of Wappinger may withdraw any or all of-the funds upon resolution of the Town Board of the Town of Wappinger, without notice to the assignor. The account shall not be reduced or released except upon written authorization by the Town Board of the Town of Wappinger as evidenced by a release certified by the town cleric. This assignment shall remain in full force and effect until so released by the Town of Wappinger. Title of Account: Montgomery Distributors LLC Account Number: 3021117480 Minimum Amount: $18,000 Montg ry Distri. tors LLC By: Robert Del Gadio, Manager Assignor STATE OF NEW YORK ) ss.. COUNTY OF NASSAU ) On the 22"' day of November, 2005 before me, the undersigned, a Notary Public in and for said state, personally appeared Robert G. Dei Gadio, personally known to me or proved to me on the basis of satisfactory evidence to be the individual(s) whose name(s) is(are) subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their signature(s) on the instrument,the individual(s),or the person upon behalf of which the individual(s)acted,executed the instrument. i i - 1 Notary Public DENISE G.FEATITTA WTAFty PUBLIC State of New 1brk No.O1Ft4958267 ousiified in Nassau County Z Commission Expires November 27, �' 08/01/2006 12:29 8454710905 PAGG1 MARTIN DELBENE PAGE 01 PAGGL MAR"N&DELBENE LLP Consulting Engineers f/ Land Surveyers 56 Main sbva Poughkeepsie,New York 12601 845-471-7$98 845-471-0905(FAX) i July 31, 200(1 _VIA FAX i UML. Planning Board Town of Wappinger 20 Middlebush Road Wappingers Falls, RECEIVED pp�ng a. New York 125.90. . . . ,. „ .,,„ Reference: Getty Gas Station#169 Site Plan AUG 0 1 20M NYS Route 9 Dear Board Members, TOWN CLERK On July r, 2006 this office received Sfte Plans Sheets 1-2,and Sewage Disposal$heat$ 1-3 for the Getty pas Station#169 3fto Plan.All Plans were prepared by Catapano Engineering, P.C. and are dated last revised May 31'x, 2006,as prepared by All oUtdandigg enalneedna related concerns frpm our OCLOker 2006 ed. tier have We have also reviewed the November 210, 2005 Resolution of Site Development Plan Approval and would note the following; • 2.b.1): The Zoning Administrator should verify that the Resolution has been signed. • 2.b.2):The Town Tax Collector should verify that the taxes have been paid. • 2.b.3): The Applicant obtained DCHD approval on,lune 20"', 2006, We would note that this approval is Just for a septic tank/holding tank setup, No subsurface some disposal system is proposed, • 2-b-4). In his July 2$1h, 2006 Compliance letter, the Town Planner indicated that the traffic signage Is satlsfactory, • 2.b.51= In his July 261", 2006 Compliance letter, the Town Panner indicated that the onsite truck turning movements are satisfactory. • 2.b.6):AlUeftM In his July 26"', 2006 Compliance letter, the Town Planner indicated that the landscape plans are satisfactory, • 2.b-T); Sao~ All outstanding engineering related concems from our October 24"', 2005 review letter have been satisfied. • 3.a; In his July 260`, 2008 Compliance letter,the Town Planner indicated that the location of the wetlands on the Plans is not satisfactory, • 3.b: In his July 260, 2006 Compliance letter,the Town Planner indicated that the requested NYSDEC correspondence has not been submhW. + 3.c: In his July 26", 2006 Compliance letter, the Town Planner Indicated that the note regarding pesticides must be placed on the Site Plan(Sheet 2). JOseph E R'*,)r.,P F- Fres MUdin,Jr.,P.B.,LS, Chacla R.Dd Bone,)r.,P.E. 88/91/2006 12:29 8454719995 PAGG1 MARTIN DELBENE PAGE 02 Planning Board -2- July 31,2006 RE; Getty Gas Station#169 Site Plan • 3.d: in his July 26", 20D6 Compliance letter. the Towri Planner indicated that the Bond or account for the sidewalk iristallation along NYS Route 9 must be approved by the Town Attorney. The Applicant should also provide a copy of the NYSDOT Permit allowing for said construction within their right-of-way. Please feel free to contact this office If you have any questions regarding this matter. Thank you. Very truly yours, 9a4q0C eph E. Paggl, Jr., P.E. G / JEP/PjP cc: Hon. Joseph Rugg#ero Hon, Chris Masterson Town Board, File Hon. Graham Foster Albert P. Roberts, Esq. Chris Holme Tatiana Lukianoff John V. Catapano, P.E, PAGGI,MARTIN&DEL BENE LLP Consulting Engineers & Land Surveyors 56 Main Street Poughkeepsie,New York 12601 845-471-7898 845-471-0905(FAX) July 31, 2006 VIA FAX&MAIL: Planning Board Town of Wappinger RECEIVED 20 Middlebush Road j Wappingers Falls, New York 125_90__._._....__ Reference: Getty Gas Station #169 Site Plan NYS Route 9 TOWN CLERK Dear Board Members: On July 7t', 2006 this office received Site Plans Sheets 1-2, and Sewage Disposal Sheets 1-3 for the Getty Gas Station #169 Site Plan. All Plans were prepared by Catapano Engineering, P.C. and are dated last revised May 315, 2006, as prepared by All outstanding engineerinq related concerns from our October 24`h 2005 review letter have been addressed. We have also reviewed the November 21 g`, 2005 Resolution of Site Development Plan Approval and would note the following: • 2.b.1): The Zoning Administrator should verify that the Resolution has been signed. • 2.b.2): The Town Tax Collector should verify that the taxes have been paid. • 2.b.3): Satisfied. The Applicant obtained DCHD approval on June 20'", 2006. We would note that this approval is just for a septic tank/ holding tank setup. No subsurface sewge disposal system is proposed. • 2.b.4): Satisfied. In his July 26th, 2006 Compliance letter, the Town Planner indicated that the traffic signage is satisfactory. • 2.b.5): Satisfied. In his July 26t', 2006 Compliance letter, the Town Planner indicated that the onsite truck turning movements are satisfactory. • 2.b.6): Satisfied. In his July 26th, 2006 Compliance letter, the Town Planner indicated that the landscape plans are satisfactory. • 2.b.7): Satisfied All outstanding engineering related concerns from our October 241h 2005 review letter have been satisfied. • 3:a: in his July 26th, 2006 Compliance letter, the Town Planner indicated that the location of the wetlands on the Plans is not satisfactory. • 3.b: In his July 26th, 2006 Compliance letter, the Town Planner indicated that the requested NYSDEC correspondence has not been submitted. • 3.c: In his July 26th, 2006 Compliance letter, the Town Planner indicated that the note regarding pesticides must be placed on the Site Plan (Sheet 2). Joseph E.Paggi,Jr.,P.E. Ernst Martin,Jr.,P.E.,L.5. Charles R.Del Bene,Jr.,P.E. Planning Board -2- July 31, 2006 RE: Getty Gas Station #169 Site Plan • 3.d: In his July 26"', 2006 Compliance letter, the Town Planner indicated that the Bond or account for the sidewalk installation along NYS Route 9 must be approved by the Town Attorney. The Applicant should also provide a copy of the NYSDOT Permit allowing for said construction within their right-of-way. Please feel free to contact this office if you have any questions regarding this matter. Thank you. ' Very truly yours, j I &eph7pPaggi, Jr., P.E. J EPIPJP cc: Hon. Joseph Ruggiero Hon. Chris Masterson Town Board: File Hon. Graham Foster Albert P. Roberts, Esq. Chris Holme Tatiana Lukianoff John V. Catapano, P.E. PAGGI, MARTIN CONSULTING , LAND SURVEYORS 1 56 MAIN STREET POUGHKEEPSIE, NEWYORK • 1 PHONE84 471-7898/FAX 8. 090 Memo To: Hon. Joseph Ruggiero Frwn: Joseph E. Paggi, Jr., P.E. CC: Hon. Chris Masterson Town Board: File Nmo-L Hon. Graham Foster Planning Board goon Q Z 130 Albert P. Roberts, Esq. Tatiana Lukianoff Chris Holme Date: 10118/05 Re: Getty Gas Station # 169 (Lukoil) Comments: Our office is in receipt of the following information regarding the above referenced Site. All information was prepared by C2G Environmental Consultants, LLC I Catapano Engineering, P.C. • Remedial Action Work Plan dated May 2005. • Tank Closure and Remedial Action Report dated September 16th 2005. • Potable Water Well Sampling Report dated June 18th, 2005. The basic findings of these Reports are summarized as follows: 1. A spill of approximately 5000 gallons of regular gas occurred on April 28th, 2005. The New York State Department of Environmental Conservation (DEC) was noted, and Spill No. 05-01208 was assigned to the site. •Page 1 2. A Closure Plan was prepared on May 16th, 2005, and accepted by the DEC on June 22"d, 2005. 3. Tank Closure and Remediation activities were conducted from April through June, 2005. 4. Remediation activities resulted in the recovery of 3200 gallons of free product, 33,000 gallons of gas contaminated groundwater, and 7,400 tons of gas contaminated soil. All recovered materials were hauled offsite and disposed of properly, 5. 49 soil samples were then taken. 46 of these samples came back clean. The following samples exceeded the DEC Recommended Soil Objective Level: 1 for acetone, and 2 for MTBE. 6. One (1) groundwater sample was taken. Said sample exceeded the DEC Recommended Soil Objective Level for BTEX and MTBE. 7. One (1) potable water sample was taken. No contaminants were found above NYS drinking water standards. 8. The Report concludes "Based upon the findings of the Tank Closure activities, it appears that the impacted soil in the area of the former US Ts, pump islands and dispensers has been successfully raemediated. As per the Remedial Action Work Plan dated May 16, 2005, a series of groundwater monitoring wells will be installed at the site in strategic locations in order to characterize the nature of the groundwater quality. Based upon the analytic data obtained from the monitoring wells a determination will be made as to the need for further remediation." Please feel free to contact this office W you have any questions regarding this matter. Thank you. 0 Page 2 TOWN OF WAPPINGER P.O. Box 324 PLANNING BOARD 20 Middlebush Road + Wappingers Falls, NY 12590-0324 PLANNING BOARD TOWN OF WAPPINGER RESOLUTION APPROVING SITE' -PLAN GETTY PETROLEUM 3RD AMENDED SITE PLAN Tax Map Designation : 19-6157-02-578955 RESOLUTION NUMBER: R-301 DATE: 4/19/93 At a regular meeting of the Planning Board of the Town of Wappinger, held at the Town Hall , 20 Middlebush Road, Wappingers Falls , New York on the 19th day of April 1993: The meeting was called to .order by Chairman Donald Keller, and upon roll being called the following were: PRESENT: Donald Keller, Chairman William Parsons, Vice Chairman Philip Di Nonno, Member Michael Franzese, Member Hugo Musto, Member John Perillo, Member Cheri s Simonetty ABSENT: The following resolution was offered for adoption by who moved this adoption, seconded by to wit: WHEREAS, in accordance-with the 'Town of Wappinger Zoning Law as last revised, 1/1/91, R. J. SNYDER & DECKER & COMPANY, as agents for Getty Petroleum, has submitted to the Planning Board an application for the approval of a site plan entitled Getty Petroleum - Building Renovation Site Plan, Route 9, Wappingers Falls, New York located on sheet 6157-02, parcel 578955 of the Town of Wappinger Tax Map; and the applicant has represented to this board that they have authorization to uses this parcel and: WHEREAS, an application of three hundred and ten dollars ($310.00) , covering a 9.7 acre site, and a proposed floor area of 578 sq, ft. has been received by this board and; WHEREAS, the Planning Board has identified this action as an unlisted action, and adopted a Negative Declaration on March 16, 1993 and; Page 2 Planning Board Draft Resolution Getty Petroleum 3rd Amended Site Plan dated 4/19:/93 WHEREAS'; the applicant has submitted, as part of his application, the following additional map.; - Getty Petroleum Corp. - Elevation/Floor Plan - prepared by Decker & Company ('Paul a Weiss , PE) , dated 1/18/93 and; WHEREAS, the Planning Board has referred this application to the following boards and/or agencies : Engineer to the Town Planning Consultant Highway Superintendent Zoning Administrator Conservation'Ad� isory Council Fire Prevention Bureau New York State Department of Transportation and: WHEREAS, the Dutchess County Department of Planning ,has reviewed the proposed action within the framework of General Municipal Law (Article 12B, Sections 239-1 and 239-m) and has submitted a report on March 3, 1993 and; WHEREAS, the requirements of the Town of Wappinger Zoning Law and this_Roar,ds ' regulations have been met except as noted below; NOW, THEREFORE, BE IT RESOLVED that the application of Getty Petroleum Corp. for the approval of a site plan entitled Building Renovation Site Plan, prepared by Decker & Co. (Paul A. Weiss , PE) , dated 1/18/A93 and last revised 2/23/93 be approved subject to the conditions listed below, and that the chairman of this board be, and hereby is , authorized to endorse this boards ' approval of said plan upon compliance by the appli- cant with the terms herein; This approval is contingent upon the applicant modifying the appropriate site plan sheets to show; 1. Site Plan title should be "THIRD AMENDED" 2. 3. 4. x. date of modification BE IT FURTHER RESOLVED;that unless a building permit has been issued within 360 days of the date of this resolution, this approval -will be null and void and, BE IT FURTHER RESOLVED; that this approval is contingent upon; 1 . Submission of fees as per town requirements in the form of separate checks , made payable to the Town of .Wappinger; Downstream Drainage, others. 2. Approval of the Dutchess County Dept. of Health on water supply and sewage disposal shall be obtained prior to endorsement of the site plan. Page 5 Planning Board Draft Resolution Getty Petroleum 3rd Amended Site Plan dated 4/19/93 3. Downstream drainage fee of $.15 a square foot for newly constructed roofed areas and areas covered with impervious material shall be paid prior to the issuance of a Certificate of Occupancy. i 4. A copy of the building plans shall be supplied to the Fire Prevention Bureau for their review prior to the issuance of a Building Permit. 5. The Fire Prevention Bureau shall inspect the premises prior to the issuance of a Certificate of Occupancy. 6. Any signs to be located on the premises and/or bdilding shall comply with the requirements of the Town of Wappinger Zoning Law. 7. Adequate screening shall be required for the refuse enclosure as determined by the Planning Board. 8. Site lighting shall be submitted and reviewed by the Zoning Administrator prior to final approval to insure that there will be no glare on to roadways and/or adjacent residential areas . 9. Landscaping shall be required as determined by the Planning Board. 10. A certifed "as built" plan shall be submitted and approved by the .Planning Board prior to the issuance of a Certificate of Occupancy. THEREFORE, upon completion of all requirements set forth in the action approving the site plan , six (6) copies of the site plan shall be submitted for the Planning Board Chairmans" signature. The question of the adoption of the foregoing resolution was duly put to a vote on roll call which resulted as follows : Donald Keller, Chairman AYE William Parsons , Vice Chairman AYE Philip Di Nonno, Member ABSENT Michael Franzese, Member AYE Hugo Musto, Member AYE John Perillo, Member _RYE_ Chris Simonetty, Member AYE THE RESOLUTION WAS THEREUPON DECLARED DULY ADOPTED: DATED !k/ WAPPINGE S ALLS NEW YORK HERBERT ENSON, ZONING ADMINISTRATOR TOWN OF PPINGER LANNING BOARD TCWN OF WAPPINGER, NY GETYGS08,neg RESOLUTION ADOPTING NEGATIVE D13CLARATION ��01'11G'ETTY PETROLEUM - Building Renovation -- Site Plan �O Tax Map # 19-61.5'7­02 578955 RESOLUTION NUMBER DATE: March 16, 1.993 At a. regtilar mea.T.,,ting of the planning Bocard of the Town of Wappinger, held at'. the Town Hall, 20 Middlebush Road, Wztppingers Falls NY on the 16th day of March 1993,4 The 'meeting was -to order 1)y A(:;�ting Chairii,ian Parsons, and upon roll beirag called the following were- PRESENT: Acting Chairman, William Parsons; Phil DiN0nno; Michael Franzese; Hugo MUStO; Chris Simonc,,,tty ABSENT: Chairman Donald Keller; John Perillo The following resolution was offered for cadoption by Mr. DiNonno who moved ttiis adoption, seconded by Mr. Musto, to wit; WHEREAS, in accordance witl-i the Trm,m of Wappinge.r Zoning Law as last reviE�,'ed, GETTY PETROLEUM Corp. has submitted to the Planning Board an application for the approval. of a site plan titled BUILDING RENOVATION SITE PLAN, located on Sheet 61.57­02, parcel 578955, of the town tax maps, and WHEREAS, pursuant. to SEQRA (6 NYC RR Part 617) , and LL #6-1.992,, Town r,"af Wappinger, 1) The PLANNING BOARD has identified this action as, an UNLISTED action; and h.as determined that a COORDINATED REVIEW i,,.,; not required 2) The Planning Board, based upon reports fx%-_)m it's professional staff, has completed a review of a Short Form EAF and has deternined that as Long Form LAT" for, the proposed action is unnecessary NOW THEREFORE, BE IT RESOLVED,, that, based upon the review arid acceptance, of the Short Form EAF, the attached NEGATIVE DECLARATION for the application of GETTY PETROLEUM Corp., for the approval of as site plan titled BUILDING RENOVATION SITE PLAN prepared by Pai.fl. A. Weiss, RE; dated 1/18/93, and last revised 2/23/93, be adopted and filed in accordance with the requirements of 6 NY. CRR Part 617, The c.luestion of thc,-� adoption of the foregoing resolution was (hily put to as vote., on roll (.",all, which result-led as follows, Donald Keller William Parsons voting aye Hugo must:o voting aye Phil DiNonno voting aye John Perillo Michael Franzese voting aye Chris Simonetty voting aye The resolution was thereupon declaro duly a )ted. DATED: March 1, 1.993 Wappingers Falls New York. 11_J2 ..ff 1. "0 ­Zordng Adi,id.rd-strator State ES"8v7.roC"l'fl'dental Quality Review NEGATIVE", DECLARATION Notice of. Determination of Non Signifi .anct.,� Project: GETTY PTe;""1'ROLT:U Corp. .. Site Plan Date: March 1G, 199: This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State Environmentaal. Quality Review, Act) of the Environmental Conservation Law, and TSI., # 6-1992 Town of W appinCer:° NY. The Planning Board of the Town of Wappinger, as Lead Agency, has determined that, the proposed action described below will not have a significant effect, on the environment and a Draft, Environmental Statement will not be prepared. NAME til:'' ACTION: Site Plan Approval - Building Renovation/Walk In Cooler SEQR1 STATUS: Type 1 ( ) Unlisted, ( wryX( CONDITIONAL NEGATIVE DECLARATION ( J STs (xxx) no DESCRIPTION OF ACTION: Proposed construction action of a 8' by :16 ' building addition to house a;a door walk-in cooler. Existing building of 450 sf. was recently converted from a Baas station into a gay, station/snack mart. T,l CATT ON "The property is designated as 19-6157-02-578955 on the Town Tax Assessment map, The property is located on the west ,side of Route 9, north of Middl.arlaa.rsh Road. The existing development is on lands zone NB (Neighborhood od Business District) . ct. REASONS SUPPORTING THIS DETERMINATION: K The Board has considered the Shor.t-. Form EAF together with comments submitted by the Board's Planning Consultant nt aYand Engineering Consultant. 2. The installation of the addition is i.=a minor change Can the site and is not: anticipated to significantly increase traffic generation.. 3. The installation of snaar;lt shop/mart's (which the cooler-, supports) in other s7.m1,.1.c"a.r situations 1"av been instrumental ment'.al 1 n providing additional consumer services without measurable adverse effects FOR FURTHER INFORMATION: contact person; Mrs`. Herbert Levenson, Zoning Administrator, Wappin e:r Town Hall, 20 Mi.ddl.ebush Road Wappingers Falls NY 10590 phone- (9:1.1.) 297-6256