January 9, 2007 VIA FAX a MAIL:
�,� �,.,y.Ott^„ I'
Planning Board REC RECEIVED
Town of Wappinger I ��
20 Middlebush Road
Wappingers Falls, New York 12590 TOWN CLERK TOWN CLERK
Reference: Getty Gas Station #169 Site Plan
NYS Route 9
Dear Board Members:
On December 27th, 2006 this office received Site Plans Sheets 1-9, and Sewage Disposal
Sheets 1-3 for the Getty Gas Station #169 Site Plan. All Plans were prepared by High Point
Engineering and are stated last revised December 40i, 2006, as prepared by
All outstanding engineering related concerns from our October 24" 2005 review letter have
been addressed.
We have also reviewed the November 21St, 2005 Resolution of Site Development Plan
Approval and would note the following:
• 2.b.1):The Zoning Administrator should verify that the Resolution has been signed.
• 2.b.2): Satisfied The Town Tax Collector has verified that the taxes have been paid.
• 2.b.3): Satisfied. The Applicant obtained DCHD approval on June 20"', 2006. We would
note that this approval is just for a septic tank/ holding tank setup. No subsurface sewge
disposal system is proposed_
• 2.b.4): Satisfied In his July 26h, 2006 Compliance letter, the Town Planner indicated
that the traffic signage is satisfactory.
• 2.b.5): Sadsfied. In his July 26"', 2006 Compliance letter, the Town Planner indicated
that the onsite truck turning movements are satisfactory.
• 2.b.6): Satisfied. In his July 26"', 2006 Compliance letter, the Town Planner indicated
that the landscape plans are satisfactory.
• 2.b.7): Satisfied. All outstanding engineering related concerns from our October 24"',
2005 review letter have been satisfied.
• 3.a: Satisfied.As per his.December 80', 2006 Compliance letter, the.Town Planner
indicated that the location of the wetlands on the Plans is satisfactory.
• 3.b: Satisfied The covers on the two existing drywelis in front of the gas island canopy
have been revised to indicate solid covers as requested.
• 3.c: SatfsNed.As per his December 80', 2006 Compliance letter, the Town Planner
indicated that the note regarding pesticides has been satisfied.
Joseph E.Paggi,Jr.,P.R. Ernst Martin,Jr.,P.E.,L.S, Charles R.Del Bene,Jr,,P.E.
1962-2006
Planning Board -2- January 9, 2007
RE: Getty Gas Station #169 Site Plan
• 3.d: Satisfied The sidewalk has been constructed along Route 9, therefore no bond or
escrow account is required.
Please feel free to contact this office if you have any questions regarding this matter.
Thank you.
Very truly yours,(bi11
eph E. Paggi, Jr., P.E.
JEPIPJP
cc: Hon. Joseph Ruggiero
Han. Chris Masterson
Town Board: File
Hon. Graham Foster
Albert P. Roberts, Esq.
Chris Holme
Tatiana Lukianoff
John V. Catapano, P.E.
Lawrence Kuo, P.E.- High Point Engineering
TOWN OF WAPPINGER
ZONING ADMINISTRATOR SUPERVISOR
TATIANA LUKIANOFF JOSEPH RUGGIFERO
TOWN COUNCIL
VINCENT BETTINA
MAUREEN McCARTHY
JOSEPH P. PAOLONI
ZONING DEPARTMENT ROBERT L.VALDATI
20 MIDDLESUSH ROAD
WAPPINGERS FALLS, NY 12590
(845)297-5257 .
September 8, 2006 FAX:(845)297-0579
RF-CEIVEC
Hon. Joseph Ruggiero, Supervisor CLERK
Town Board TOWN
Re: Getty Gas Station—Security for Installation of Sidewalk
North Fork Bank Account No: 3021117480
Site Location: Route 9
Tax Grid # 6157-02-578955 HB zone 9.6 acres
Applicant: Catapano Engineering
Dear Supervisor Ruggiero,
This office had received an Acknowledgement of Assignment from Forth Bork Bank, 210
Mineola Boulevard, Mineola, New York, that an account had been established by
Montgomery Distributors LLC in the amount of$18,000.00 to be held as security for the
construction of a sidewalk at the above referenced location. (see attached copy) The
construction of said sidewalk was required as part of the Site Plan& Special Use Permit
approvals.
The sidewalk has been installed. Mr. George Kolb, Director of Code Enforcement, has
inspected the work and has deemed it acceptable. The account can therefore be released
and I ask that the Town Board authorize this release in written form.
Very truly yours,
Tatiana Lukiano
Zoning Administrator
attachment
M. Mr. Chris Masterson, Town Clerk
Mr. Phil Dilonno, Planning Board Chairman
Mr. Al Roberts,Attorney to the Town
Mr. Jay Paggi, Engineer to the Town
file
North Fork Ba n k
To: .Town Board of the Town of Wappinger
20 Middlebush Road
Wappinger Falls, NY 12590
ACKNOWLEDGEMENT OF ASSIGNMENT
North Fork Bank located at 210 Mineola Boulevard, Mineola, New York hereby acknowledges
receipt of a copy of the Assignment of
Title of Account: Montgomery Distributors LLC
Account No.: 3021117480
Minimum Amount: $18,000
posted as security for the construction/installation of a 5' sidewalk as required by resolution of the
site plan approval granted on November 21, 2005 by the Town of Wappinger Planning Board for
parcel number 578955 on tax map number 6157 map 02 in the Town of Wappinger, Dutchess
County,New York.
The Bank acknowledges that the Town of Wappinger may withdraw any or all of the funds
upon resolution of the Town Board of the Town of Wappinger, without notice to the assignor.
Furthermore, the account shall not be reduced or released except upon written authorization by the
Town Board of the Town of Wappinger as evidenced by a release certified by the Town Clerk.
It is understood this assignment shall remain in full force and effect until so released by the
Town of Wappinger.
The Bank further represents that signer of this letter is an official authorized to bind the
Bank as to the contents of this letter.
North Fork Bank
7
By:E
Linda Doerrbecker, Branch Manager
STATE OF NEW YORK )
ss..
COUNTY OF NASSAU )
On the 22nd day of November, 2005 before me, the undersigned, a Notary Public in and for said state,
personally appeared Linda Doerrbecker,personally known to me or proved to me on the basis of satisfactory evidence
to be the individual(s) whose name(s) is (are) subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their signature(s)on the instrument,the
individual(s),or the person upon behalf of which the individuals)acted,executed the instrument.
DENISE C.FERTITTA.
NQTAIlY PUBLIC StateofNewYork ���
No.01F6959267
Qualified in Nassau County
Commission Expires November 27,4-
Notary Public
210 Mineola Blvd., Mineola NY 11501 —Phone 516 742-1500 Fax 516 742-0414
Montgomery Distributors LLC
90 MERRICK AVENUE,SUITE 500
EAST MEADOW,NEW YORK 11554
TELEPHONE: (516)683-0200
FACSDAUZ (516)683-0246
i
ASSIGNMENT
To: Town Board of the Town of Wappinger
20 Middlebush Road
Wappinger Falls,NY 12590 .
Please take notice that the below referenced account is hereby unconditionally assigned to the
Town of Wappinger as and for security in connection with the development of a site
plan/subdivision for tax map no. Section 6157, Map 02, Parcel 578955 entitled Getty Gas Station
number 169.
Approved by the planning board of the Town of Wappinger on November 21, 2005. The Town of
Wappinger may withdraw any or all of-the funds upon resolution of the Town Board of the Town
of Wappinger, without notice to the assignor. The account shall not be reduced or released except
upon written authorization by the Town Board of the Town of Wappinger as evidenced by a
release certified by the town cleric.
This assignment shall remain in full force and effect until so released by the Town of Wappinger.
Title of Account: Montgomery Distributors LLC
Account Number: 3021117480
Minimum Amount: $18,000
Montg ry Distri. tors LLC
By:
Robert Del Gadio, Manager
Assignor
STATE OF NEW YORK )
ss..
COUNTY OF NASSAU )
On the 22"' day of November, 2005 before me, the undersigned, a Notary Public in and for said state,
personally appeared Robert G. Dei Gadio, personally known to me or proved to me on the basis of satisfactory
evidence to be the individual(s) whose name(s) is(are) subscribed to the within instrument and acknowledged to me
that he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their signature(s) on the
instrument,the individual(s),or the person upon behalf of which the individual(s)acted,executed the instrument.
i
i -
1
Notary Public
DENISE G.FEATITTA
WTAFty PUBLIC State of New 1brk
No.O1Ft4958267
ousiified in Nassau County Z
Commission Expires November 27, �'
08/01/2006 12:29 8454710905 PAGG1 MARTIN DELBENE PAGE 01
PAGGL MAR"N&DELBENE LLP
Consulting Engineers f/ Land Surveyers
56 Main sbva
Poughkeepsie,New York 12601
845-471-7$98
845-471-0905(FAX) i
July 31, 200(1
_VIA FAX i UML.
Planning Board
Town of Wappinger
20 Middlebush Road
Wappingers Falls, RECEIVED
pp�ng a. New York 125.90. . . . ,. „ .,,„
Reference: Getty Gas Station#169 Site Plan AUG 0 1 20M
NYS Route 9
Dear Board Members, TOWN CLERK
On July r, 2006 this office received Sfte Plans Sheets 1-2,and Sewage Disposal$heat$
1-3 for the Getty pas Station#169 3fto Plan.All Plans were prepared by Catapano
Engineering, P.C. and are dated last revised May 31'x, 2006,as prepared by
All oUtdandigg enalneedna related concerns frpm our OCLOker 2006
ed. tier have
We have also reviewed the November 210, 2005 Resolution of Site Development Plan
Approval and would note the following;
• 2.b.1): The Zoning Administrator should verify that the Resolution has been signed.
• 2.b.2):The Town Tax Collector should verify that the taxes have been paid.
• 2.b.3): The Applicant obtained DCHD approval on,lune 20"', 2006, We would
note that this approval is Just for a septic tank/holding tank setup, No subsurface some
disposal system is proposed,
• 2-b-4). In his July 2$1h, 2006 Compliance letter, the Town Planner indicated
that the traffic signage Is satlsfactory,
• 2.b.51= In his July 261", 2006 Compliance letter, the Town Panner indicated
that the onsite truck turning movements are satisfactory.
• 2.b.6):AlUeftM In his July 26"', 2006 Compliance letter, the Town Planner indicated
that the landscape plans are satisfactory,
• 2.b-T); Sao~ All outstanding engineering related concems from our October 24"',
2005 review letter have been satisfied.
• 3.a; In his July 260`, 2008 Compliance letter,the Town Planner indicated that the location
of the wetlands on the Plans is not satisfactory,
• 3.b: In his July 260, 2006 Compliance letter,the Town Planner indicated that the
requested NYSDEC correspondence has not been submhW.
+ 3.c: In his July 26", 2006 Compliance letter, the Town Planner Indicated that the note
regarding pesticides must be placed on the Site Plan(Sheet 2).
JOseph E R'*,)r.,P F- Fres MUdin,Jr.,P.B.,LS, Chacla R.Dd Bone,)r.,P.E.
88/91/2006 12:29 8454719995 PAGG1 MARTIN DELBENE PAGE 02
Planning Board -2- July 31,2006
RE; Getty Gas Station#169 Site Plan
• 3.d: in his July 26", 20D6 Compliance letter. the Towri Planner indicated that the Bond or
account for the sidewalk iristallation along NYS Route 9 must be approved by the Town
Attorney. The Applicant should also provide a copy of the NYSDOT Permit allowing for
said construction within their right-of-way.
Please feel free to contact this office If you have any questions regarding this matter.
Thank you.
Very truly yours,
9a4q0C
eph E. Paggl, Jr., P.E.
G /
JEP/PjP
cc: Hon. Joseph Rugg#ero
Hon, Chris Masterson
Town Board, File
Hon. Graham Foster
Albert P. Roberts, Esq.
Chris Holme
Tatiana Lukianoff
John V. Catapano, P.E,
PAGGI,MARTIN&DEL BENE LLP
Consulting Engineers & Land Surveyors
56 Main Street
Poughkeepsie,New York 12601
845-471-7898
845-471-0905(FAX)
July 31, 2006 VIA FAX&MAIL:
Planning Board
Town of Wappinger RECEIVED
20 Middlebush Road j
Wappingers Falls, New York 125_90__._._....__
Reference: Getty Gas Station #169 Site Plan
NYS Route 9 TOWN CLERK
Dear Board Members:
On July 7t', 2006 this office received Site Plans Sheets 1-2, and Sewage Disposal Sheets
1-3 for the Getty Gas Station #169 Site Plan. All Plans were prepared by Catapano
Engineering, P.C. and are dated last revised May 315, 2006, as prepared by
All outstanding engineerinq related concerns from our October 24`h 2005 review letter have
been addressed.
We have also reviewed the November 21 g`, 2005 Resolution of Site Development Plan
Approval and would note the following:
• 2.b.1): The Zoning Administrator should verify that the Resolution has been signed.
• 2.b.2): The Town Tax Collector should verify that the taxes have been paid.
• 2.b.3): Satisfied. The Applicant obtained DCHD approval on June 20'", 2006. We would
note that this approval is just for a septic tank/ holding tank setup. No subsurface sewge
disposal system is proposed.
• 2.b.4): Satisfied. In his July 26th, 2006 Compliance letter, the Town Planner indicated
that the traffic signage is satisfactory.
• 2.b.5): Satisfied. In his July 26t', 2006 Compliance letter, the Town Planner indicated
that the onsite truck turning movements are satisfactory.
• 2.b.6): Satisfied. In his July 26th, 2006 Compliance letter, the Town Planner indicated
that the landscape plans are satisfactory.
• 2.b.7): Satisfied All outstanding engineering related concerns from our October 241h
2005 review letter have been satisfied.
• 3:a: in his July 26th, 2006 Compliance letter, the Town Planner indicated that the location
of the wetlands on the Plans is not satisfactory.
• 3.b: In his July 26th, 2006 Compliance letter, the Town Planner indicated that the
requested NYSDEC correspondence has not been submitted.
• 3.c: In his July 26th, 2006 Compliance letter, the Town Planner indicated that the note
regarding pesticides must be placed on the Site Plan (Sheet 2).
Joseph E.Paggi,Jr.,P.E. Ernst Martin,Jr.,P.E.,L.5. Charles R.Del Bene,Jr.,P.E.
Planning Board -2- July 31, 2006
RE: Getty Gas Station #169 Site Plan
• 3.d: In his July 26"', 2006 Compliance letter, the Town Planner indicated that the Bond or
account for the sidewalk installation along NYS Route 9 must be approved by the Town
Attorney. The Applicant should also provide a copy of the NYSDOT Permit allowing for
said construction within their right-of-way.
Please feel free to contact this office if you have any questions regarding this matter.
Thank you. '
Very truly yours, j
I
&eph7pPaggi, Jr., P.E.
J EPIPJP
cc: Hon. Joseph Ruggiero
Hon. Chris Masterson
Town Board: File
Hon. Graham Foster
Albert P. Roberts, Esq.
Chris Holme
Tatiana Lukianoff
John V. Catapano, P.E.
PAGGI, MARTIN
CONSULTING , LAND
SURVEYORS 1
56 MAIN STREET
POUGHKEEPSIE, NEWYORK • 1
PHONE84 471-7898/FAX 8. 090
Memo
To: Hon. Joseph Ruggiero
Frwn: Joseph E. Paggi, Jr., P.E.
CC: Hon. Chris Masterson
Town Board: File Nmo-L
Hon. Graham Foster
Planning Board goon Q Z 130
Albert P. Roberts, Esq.
Tatiana Lukianoff
Chris Holme
Date: 10118/05
Re: Getty Gas Station # 169 (Lukoil)
Comments:
Our office is in receipt of the following information regarding the above referenced
Site. All information was prepared by C2G Environmental Consultants, LLC I
Catapano Engineering, P.C.
• Remedial Action Work Plan dated May 2005.
• Tank Closure and Remedial Action Report dated September 16th 2005.
• Potable Water Well Sampling Report dated June 18th, 2005.
The basic findings of these Reports are summarized as follows:
1. A spill of approximately 5000 gallons of regular gas occurred on April 28th, 2005.
The New York State Department of Environmental Conservation (DEC) was
noted, and Spill No. 05-01208 was assigned to the site.
•Page 1
2. A Closure Plan was prepared on May 16th, 2005, and accepted by the DEC on
June 22"d, 2005.
3. Tank Closure and Remediation activities were conducted from April through
June, 2005.
4. Remediation activities resulted in the recovery of 3200 gallons of free product,
33,000 gallons of gas contaminated groundwater, and 7,400 tons of gas
contaminated soil. All recovered materials were hauled offsite and disposed of
properly,
5. 49 soil samples were then taken. 46 of these samples came back clean. The
following samples exceeded the DEC Recommended Soil Objective Level: 1 for
acetone, and 2 for MTBE.
6. One (1) groundwater sample was taken. Said sample exceeded the DEC
Recommended Soil Objective Level for BTEX and MTBE.
7. One (1) potable water sample was taken. No contaminants were found above
NYS drinking water standards.
8. The Report concludes "Based upon the findings of the Tank Closure activities, it
appears that the impacted soil in the area of the former US Ts, pump islands and
dispensers has been successfully raemediated. As per the Remedial Action Work
Plan dated May 16, 2005, a series of groundwater monitoring wells will be
installed at the site in strategic locations in order to characterize the nature of the
groundwater quality. Based upon the analytic data obtained from the monitoring
wells a determination will be made as to the need for further remediation."
Please feel free to contact this office W you have any questions regarding this matter.
Thank you.
0 Page 2
TOWN OF WAPPINGER
P.O. Box 324 PLANNING BOARD
20 Middlebush Road +
Wappingers Falls, NY 12590-0324
PLANNING BOARD
TOWN OF WAPPINGER
RESOLUTION APPROVING SITE' -PLAN
GETTY PETROLEUM 3RD AMENDED SITE PLAN
Tax Map Designation : 19-6157-02-578955
RESOLUTION NUMBER: R-301 DATE: 4/19/93
At a regular meeting of the Planning Board of the Town of Wappinger, held at
the Town Hall , 20 Middlebush Road, Wappingers Falls , New York on the 19th day of
April 1993:
The meeting was called to .order by Chairman Donald Keller, and upon roll being
called the following were:
PRESENT: Donald Keller, Chairman
William Parsons, Vice Chairman
Philip Di Nonno, Member
Michael Franzese, Member
Hugo Musto, Member
John Perillo, Member
Cheri s Simonetty
ABSENT:
The following resolution was offered for adoption by
who moved this adoption, seconded by
to wit:
WHEREAS, in accordance-with the 'Town of Wappinger Zoning Law as last revised,
1/1/91, R. J. SNYDER & DECKER & COMPANY, as agents for Getty Petroleum, has
submitted to the Planning Board an application for the approval of a site plan
entitled Getty Petroleum - Building Renovation Site Plan, Route 9, Wappingers Falls,
New York located on sheet 6157-02, parcel 578955 of the Town of Wappinger Tax Map;
and the applicant has represented to this board that they have authorization to uses
this parcel and:
WHEREAS, an application of three hundred and ten dollars ($310.00) , covering a
9.7 acre site, and a proposed floor area of 578 sq, ft. has been received by this
board and;
WHEREAS, the Planning Board has identified this action as an unlisted action, and
adopted a Negative Declaration on March 16, 1993 and;
Page 2
Planning Board Draft Resolution
Getty Petroleum 3rd Amended Site Plan
dated 4/19:/93
WHEREAS'; the applicant has submitted, as part of his application, the following
additional map.; - Getty Petroleum Corp. - Elevation/Floor Plan - prepared by Decker
& Company ('Paul a Weiss , PE) , dated 1/18/93 and;
WHEREAS, the Planning Board has referred this application to the following boards
and/or agencies :
Engineer to the Town
Planning Consultant
Highway Superintendent
Zoning Administrator
Conservation'Ad� isory Council
Fire Prevention Bureau
New York State Department of Transportation and:
WHEREAS, the Dutchess County Department of Planning ,has reviewed the proposed
action within the framework of General Municipal Law (Article 12B, Sections 239-1
and 239-m) and has submitted a report on March 3, 1993 and;
WHEREAS, the requirements of the Town of Wappinger Zoning Law and this_Roar,ds '
regulations have been met except as noted below;
NOW, THEREFORE, BE IT RESOLVED that the application of Getty Petroleum Corp. for the
approval of a site plan entitled Building Renovation Site Plan, prepared by Decker & Co.
(Paul A. Weiss , PE) , dated 1/18/A93 and last revised 2/23/93 be approved subject to the
conditions listed below, and that the chairman of this board be, and hereby is ,
authorized to endorse this boards ' approval of said plan upon compliance by the appli-
cant with the terms herein;
This approval is contingent upon the applicant modifying the appropriate site plan
sheets to show;
1. Site Plan title should be "THIRD AMENDED"
2.
3.
4.
x. date of modification
BE IT FURTHER RESOLVED;that unless a building permit has been issued within 360 days of
the date of this resolution, this approval -will be null and void and,
BE IT FURTHER RESOLVED; that this approval is contingent upon;
1 . Submission of fees as per town requirements in the form of separate checks , made
payable to the Town of .Wappinger; Downstream Drainage, others.
2. Approval of the Dutchess County Dept. of Health on water supply and sewage
disposal shall be obtained prior to endorsement of the site plan.
Page 5
Planning Board Draft Resolution
Getty Petroleum 3rd Amended Site Plan
dated 4/19/93
3. Downstream drainage fee of $.15 a square foot for newly constructed roofed areas
and areas covered with impervious material shall be paid prior to the issuance of a
Certificate of Occupancy.
i
4. A copy of the building plans shall be supplied to the Fire Prevention Bureau for
their review prior to the issuance of a Building Permit.
5. The Fire Prevention Bureau shall inspect the premises prior to the issuance of a
Certificate of Occupancy.
6. Any signs to be located on the premises and/or bdilding shall comply with the
requirements of the Town of Wappinger Zoning Law.
7. Adequate screening shall be required for the refuse enclosure as determined by
the Planning Board.
8. Site lighting shall be submitted and reviewed by the Zoning Administrator prior
to final approval to insure that there will be no glare on to roadways and/or
adjacent residential areas .
9. Landscaping shall be required as determined by the Planning Board.
10. A certifed "as built" plan shall be submitted and approved by the .Planning Board
prior to the issuance of a Certificate of Occupancy.
THEREFORE, upon completion of all requirements set forth in the action approving the
site plan , six (6) copies of the site plan shall be submitted for the Planning Board
Chairmans" signature.
The question of the adoption of the foregoing resolution was duly put to a vote on
roll call which resulted as follows :
Donald Keller, Chairman AYE
William Parsons , Vice Chairman AYE
Philip Di Nonno, Member ABSENT
Michael Franzese, Member AYE
Hugo Musto, Member AYE
John Perillo, Member _RYE_
Chris Simonetty, Member AYE
THE RESOLUTION WAS THEREUPON DECLARED DULY ADOPTED:
DATED !k/
WAPPINGE S ALLS NEW YORK
HERBERT ENSON, ZONING ADMINISTRATOR
TOWN OF PPINGER
LANNING BOARD TCWN OF WAPPINGER, NY GETYGS08,neg
RESOLUTION ADOPTING NEGATIVE D13CLARATION
��01'11G'ETTY PETROLEUM - Building Renovation -- Site Plan
�O Tax Map # 19-61.5'702 578955
RESOLUTION NUMBER DATE: March 16, 1.993
At a. regtilar mea.T.,,ting of the planning Bocard of the Town of
Wappinger, held at'. the Town Hall, 20 Middlebush Road,
Wztppingers Falls NY on the 16th day of March 1993,4
The 'meeting was -to order 1)y A(:;�ting Chairii,ian Parsons, and upon roll beirag
called the following were-
PRESENT: Acting Chairman, William Parsons; Phil DiN0nno; Michael Franzese;
Hugo MUStO; Chris Simonc,,,tty
ABSENT: Chairman Donald Keller; John Perillo
The following resolution was offered for cadoption by Mr. DiNonno who moved ttiis
adoption, seconded by Mr. Musto, to wit;
WHEREAS, in accordance witl-i the Trm,m of Wappinge.r Zoning Law as last reviE�,'ed,
GETTY PETROLEUM Corp.
has submitted to the Planning Board an application for the approval. of a site
plan titled BUILDING RENOVATION SITE PLAN,
located on Sheet 61.5702, parcel 578955, of the town tax maps, and
WHEREAS, pursuant. to SEQRA (6 NYC RR Part 617) , and LL #6-1.992,, Town r,"af Wappinger,
1) The PLANNING BOARD has identified this action as, an UNLISTED action; and
h.as determined that a COORDINATED REVIEW i,,.,; not required
2) The Planning Board, based upon reports fx%-_)m it's professional staff, has
completed a review of a Short Form EAF and has deternined that as Long Form LAT"
for, the proposed action is unnecessary
NOW THEREFORE, BE IT RESOLVED,, that, based upon the review arid acceptance, of the
Short Form EAF, the attached NEGATIVE DECLARATION for the application of
GETTY PETROLEUM Corp.,
for the approval of as
site plan titled BUILDING RENOVATION SITE PLAN
prepared by Pai.fl. A. Weiss, RE; dated 1/18/93, and last revised 2/23/93, be
adopted and filed in accordance with the requirements of 6 NY. CRR Part 617,
The c.luestion of thc,-� adoption of the foregoing resolution was (hily put to as vote.,
on roll (.",all, which result-led as follows,
Donald Keller
William Parsons voting aye Hugo must:o voting aye
Phil DiNonno voting aye John Perillo
Michael Franzese voting aye Chris Simonetty voting aye
The resolution was thereupon declaro duly a )ted.
DATED: March 1, 1.993
Wappingers Falls New York. 11_J2 ..ff 1. "0 Zordng Adi,id.rd-strator
State ES"8v7.roC"l'fl'dental Quality Review
NEGATIVE", DECLARATION
Notice of. Determination of Non Signifi .anct.,�
Project: GETTY PTe;""1'ROLT:U Corp. .. Site Plan Date: March 1G, 199:
This notice is issued pursuant to Part 617 of the implementing regulations
pertaining to Article 8 (State Environmentaal. Quality Review, Act) of the
Environmental Conservation Law, and TSI., # 6-1992 Town of W appinCer:° NY.
The Planning Board of the Town of Wappinger, as Lead Agency, has determined that,
the proposed action described below will not have a significant effect, on the
environment and a Draft, Environmental Statement will not be prepared.
NAME til:'' ACTION: Site Plan Approval - Building Renovation/Walk In Cooler
SEQR1 STATUS: Type 1 ( ) Unlisted, ( wryX(
CONDITIONAL NEGATIVE DECLARATION ( J STs (xxx) no
DESCRIPTION OF ACTION:
Proposed construction action of a 8' by :16 ' building addition to house a;a
door walk-in cooler. Existing building of 450 sf. was recently
converted from a Baas station into a gay, station/snack mart.
T,l CATT ON
"The property is designated as 19-6157-02-578955 on the Town Tax
Assessment map, The property is located on the west ,side of
Route 9, north of Middl.arlaa.rsh Road. The existing development
is on lands zone NB (Neighborhood od Business District) .
ct.
REASONS SUPPORTING THIS DETERMINATION:
K The Board has considered the Shor.t-. Form EAF together with
comments submitted by the Board's Planning Consultant nt aYand
Engineering Consultant.
2. The installation of the addition is i.=a minor change Can the site
and is not: anticipated to significantly increase traffic
generation..
3. The installation of snaar;lt shop/mart's (which the cooler-,
supports) in other s7.m1,.1.c"a.r situations 1"av been instrumental ment'.al 1 n
providing additional consumer services without measurable adverse
effects
FOR FURTHER INFORMATION:
contact person; Mrs`. Herbert Levenson, Zoning Administrator,
Wappin e:r Town Hall, 20 Mi.ddl.ebush Road
Wappingers Falls NY 10590
phone- (9:1.1.) 297-6256