Frank Piccone Site PlanTEL. 297-6257
Report To: Hans R. Gunderud, Bldg. Inspector/Zoning Admin.
From: Town of Wappinger Planning Board
Date: April 8th, 1982
Subject: Frank Piccone - Application for Site Plan Approval
to convert an existing dwelling into a restaurant
on property located on Old Route 9, in the Town of
Wappinger.
At the April 5th, 1982 meeting of the Planning Board, a
motion was made by Mr. Mills, seconded by Mr. Keller, to adopt
the following resolution:
BE IT RESOLVED THAT THE PLANNING BOARD OF THE OF li"APP11-,C-Erl
HEREBY GRANTS FINAL SITE PLAN APPROVAL to Frank Picconc for site
plan entitled "Frank �icconb, Town of Wappinger, Dut. Co., N.Y. -
Proposed Restaurant Site", prepared by Richard G. Barger, P.E. & L.S.,
dated 3/6/82 and subject to the following conditions:
1. Approval of the Dutchess County Department of Health
shall be obtained prior to the issuance of a Certificate
of Occupancy and/or a building permit.
2. Use of the existing cottage on the property shall be
designated. Residential use of the cottage would have to '-be
abandoned upon use of the main house as a restaurant.
3. Fire Prevention Bureau shall review the site -olan and t --he
premises and structure shall be inspected prior to the issuance
of a Certificate of Occupancy in accordance with the provisions
of the Town of Wappinger Fire Prevention Law.
4. Signs shall conform with the requirements of the To�,m of
Wappinger Zoning ordinance unless a variance is first obta--i ned.
PLANNING BOARD
To WN OF WAPPINGER
TOWN HALL
WAPPINGERS FALLS. NEW YORK 12,590
TEL. 297-6257
Page Two
April 8th, 1982
5. Grading and drainage plan shall be reviewed and approved
by the Engineer to the Town and the Acting Highway Superintendent
prior to the issuance of a building permit and/or a certificate
of occupancy.
6. Downstream drainage fee of $ .15 a square foot for any
newly covered roofed areas or areas covered by impervious
material shall be paid prior to the issuance of a building
permit and/or a Certificate of Occupancy. If parking lot
is to be paved in the future, downstream drainage fee would
have to be paid at that time.
7. Erosion control plan shall be reviewed by the Conservation
Advisory Council and approved by the Engineer to the Town prior
to the issuance of a building permit and/or a Certificate of
Occupancy.
Vote:
Mr. Fanuele aye
Mr. Lawrence aye
Mr. Mills - aye
Mr. Rubenstein - absent
The motion was carried.
Mr. Keller - aye
Mr. May - aye
Mr. Parsons - aye
br
cc: Richard G. Barger, P.E. & L.S.
Kenneth T. Croshier, Acting Highway Superintendent
Fire Prevention Bureau
Edward Hawksley, Conservation Advisory Council
Rudolph E. Lapar, Engineer to the Town
James Napoli, P.E. - Dutchess, Co. pt. of Health
Frank Piccone, Applicant
Elaine H. Snowden, Town clerk