Greystone Bids General Construction 11-06-2002BID FORM
FOR
GENERAL CONSTRUCTION
GREYSTONE ESTATE/
CARNWATH MANSION EMERGENCY STABILIZATION
Town of Wappinger, New York
PROPOSAL FROM:
PLEASE PRINT Name: IDEMA GENERAL CONTRACTORS; INC.
Address: 91 COLLEGE AVENUE P.O. BOX 3361
POUGHKEEPSIE, NY
Zip: 12603
Phone: (845x454-1270 _ Fax: 84p— 454-5098
Gentlemen:
RECE1 = r
NOV
TOWN CLERK
Having examined in their entirety the Notice of Bid, Instructions to Bidders, the Bidding
Documents, and Specifications, and any Addenda thereto, and all other documents comprising
and hereafter collectively referred to as the Contract Documents, all as prepared by Cernigha &
Swartz Architects, Planners and Interior Designers, PC, 134 Academy Street, Poughkeepsie,
NY, and having examined the site of the Work and conditions affecting the Work, the
undersigned proposes and agrees to perform all labor and furnish all materials and equipment
required to complete all work depicted or specified, in strict accordance with the Contract
Documents and to your complete satisfaction and acceptance.
The undersigned further agrees that:
(A) This Proposal shall remain irrevocable for a period of forty-five (45) days from the date of
bid opening set forth in the Advertisement for Bids.
(B) The following listed addenda have been received and considered in the preparation of this
Proposal:
Addenda No. 1
Dated: November 5, 2002
Town of Wappinger - Greystone Estate/Carnwath Mansion Project No. 0201.023
BID FORM BF - 1
ALLOWANCES
Include within your Base Bid the amount of $6,500.00 for labor and materials in the
replacement of roof deck and temporary shoring as may be needed.
TIME OF COMPLETION
If awarded the Contract, the undersigned agrees to complete all work included in the Proposal
in accordance with the following project schedule:
PROJECT SCHEDULE'
START CONSTRUCTION WORK NOVEMBER 15, 2002
SUBSTANTIAL COMPLETION DECEMBER 15, 2002
"eIt is mandatory that substantial completion of this project occur on or before the date indicated
in the schedule above.
If the Contractor shall at any time fall behind in the performance of his work in contravention
of the requirements of the Project Schedule, the Contractor shall, at his own cost and expense,
accelerate the performance of the work and perform such overtime work as may be necessary to
conform to the Project Schedule.
BASE BID TOTAL
The amount of Fiftv'. three thousand seven hundred ninet-v four
dollars and no cents. 53 794.0
The quotation above is -based on erial5 cified.
Signed:
By: James B. Rh nders
Title: President
Date: November 5, 2002
Town of Wappinger - Greystone Estate/Carnwath Mansion Project No. 0201.023
BID FORM BF -2
11/01/02 11:56 FAX 4730284 CERNIGLIA & SWARTZ PC 0003/003
PROJECT T=: Wlralw
COUNW OF: STATE OF -
L 17,';S-'Xezq leg Y 9 of the City of A-ealz zrz'jtlli�.�
in the County of /) // and the State of -- - AK/o,,",
of full age, hwn been dulyswQrn a=xling to law, upon myoath dePose add sardat:
AzIl
am n
—06) (Nat= of Organization)
The Bidder maldng the Proposal for the above named Project and that I executed the said Proposal with full
authotity,to do so; that said Bidder his not, directly or indirectly, entered into any agmement, participated it,
any collusion, or od=vme take action in msumm cf free, competitive bidding in connection with the above
named Project; and that all staternem contained in said Proposal and iti this affidmit are true and correcT,
mid aWe with full knovAedge that the Town of Wappmger relies upon the troth cf the statements contained
in this affidavit in awartling the Contract for the said Project
I further warrant that no penon or selling agency has been employed or retained to solicit or secure such
Contract upon an agx-eeinent or understanding f or a r.Qnunission, percentage, brokerage or contingent f ee,
except bona fide employees or bone fide established commercial or selling agencies maintained by,
M rM
M
1010)CM90"s
(Name of (Don tor)
'D V I
D 88
Ny
SIG—NA —IfM— OF -NOTARY PUBLIC
Project No. 020L023
NC- I