Castle Point Landfill Closure Bid ResultsrPVEE Sheffier
April 16, 2013
Sedore & Company, CPAs
2678 South Road, Suite 101
Poughkeepsie, New York 12601
Re: Town of Wappinger, Castle Point Landfill Post -closure Requirements and Costs;
Conrad Geoscience File #CW000100
To Whom It May Concern:
Civil Engineering
Surveying
Land Planning
Envia•onmental
Municipal Sen4ces
Conrad Geoscience Corp. is responsible for post -closure groundwater and landfill gas monitoring for the
Town of Wappinger at the Town's Castle Point Landfill.
In accordance with 6NYCRR Part 360, the State's regulations governing closed landfills, groundwater and
landfill -generated gasses must be monitored for a period of 30 years after closure (6NYCRR Part 360-2.15). This
work has been conducted in accordance with the December 2000, NYSDEC approved, Post -Closure Monitoring
and Maintenance (PCMM) Manual, prepared by Paggi, Martin & Del Bene, LLP. In July 2004, Conrad Geoscience
requested that the frequency of groundwater monitoring be reduced from quarterly to annually, and that
samples be analyzed in accordance with 6NYCRR Part 360 Baseline Parameters. This request was granted by
NYSDEC shortly thereafter. Landfill gasses are monitored quarterly. Results of field inspections and sampling are
reported to NYSDEC at the completion of services for that quarter,
Conrad Geoscience provides landfill gas monitoring at an annual cost of $1,923.00, and annual
groundwater monitoring at $2,500.00 per year. The total cost for 2013 services is $4,423.00. The cost to provide
post -closure monitoring services, as outlined above, for the remaining post -closure monitoring period (17 years),
at current rates, would be $75,191.00
If you have any questions, please do not hesitate to call.
Sincerely,
CONRAD GEOSCIENCE CORP.
Christopher B. Brown, CPG APR 1
Principal\Senior Hydrogeologist �
TO
did �` APPIN �
CBB/tla TOWN
CLERK
cc: Supervisor
Town Clerk
Robert J. Gray, Morris Associates
One Civic Center Plaza, Suite 501, Poughkeepsie, New York 12601
Phone: 845-454-2544 - Fax. 845-454-2655
PAGGI & MARTIN
Consulting Engineers £Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905(FAX)
c �December 23, 1997
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance 0. Smith, Supervis^r
Reference: Castlepoint Landfill Closure Project
Dear Supervisor Smith & Board Members:
Enclosed please find Change Order No. 1 for the above referenced project.
The purpose of this Change Order is to revise the project completion time as defined under the
Specifications in order to avoid construction during inclement winter months. Please note that this
revised Project Completion Schedule was previously approved by the New York State Department of
Environmental Conservation via correspondence to the Town dated December 2, 1997.
Please sign the enclosed form and return it to this office for distribution.
If you have any questions or comments, please feel free to contact me.
Thank you for your consideration in this matter.
Very truly yours,
POO
Peter J. Paggi
PJP:Iaw
Enclosure
cc: Hon. June Visconti, Councilperson
Hon. Vincent Bettina, Councilperson
Hon. Joseph Ruggerio, Councilperson
Hon. Robert Valdati, Councilperson
Elaine Snowden
Albert P. Roberts, Esq.
Joseph E. Paggi, Jr., PE. Ernst Martin, Jr., EE., L.S. � primed anracyded paper
CHANGE ORDER
NO.: 1
DATE: 12/02/97
ENGINEER'S PROJECT NO.: 86-003(14)
PROJECT: CASTLEPOINT LANDFILL PROJECT
NATURE OF CHANGES:
CHANGE IN CONTRACT TIME AS DEFINED UNDER "INFORMATION TO BIDDERS - #5" (PAGE ITB -1) OF THE
SPECIFICATIONS. CHANGE IS TO AVOID CONSTRUCTION DURING INCLEMENT WINTER MONTHS.
ENCLOSURE: NONE
ADJUSTMENT OF CONTRACT AMOUNT: N/A
ORIGINAL CONTRACT AMOUNT:
PRIOR CHANGE ORDER
THIS CHANGE ORDER (+,-):
REVISED CONTRACT AMOUNT:
ADJUSTMENT OF CONTRACT TIME:
CONTRACT TIME PRIOR TO THIS CHANGE ORDER:
SUBSTANTIAL COMPLETION BY SEPTEMBER 30, 1997.
$ 444,008-00
$ 0.00
$ 0.00
$ 444,008.00
NET (INCREASE) RESULTING FROM THIS CHANGE ORDER: 10+ MONTHS
CURRENT CONTRACT TIME INCLUDING THIS CHANGE ORDER:
SUBSTANTIAL COMPLETION BY JULY 31, 1998.
SUBMITTED BY:
APPROVED BY:
DATE is I
IS
I*—
DATE
(Owner's Signature)
ACCEPTED BY: 342/4� AV_DATE /4-1 _rAz
is i
(Contras gnature) �Rf 9
DISTRIBUTION: OWNER [ ] CONTRACTOR[ ] ENGINEER [ ] FIELD REPRESENTATIVE [ ]
OTHER
PAGGI &. MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAX)
December 2, 1997
Hudson Canyon Construction, Inc.
115 DeVries Avenue
North Tarrytown, New York 10591
Attention: Mitchell G. Berkey
Reference: Castlepoint Landfill Closure Project
Town of Wappinger
Dear Mitch:
Due to the delays in securing the required Material Pre -Qualification approvals, it is apparent that the
December 15, 1997 substantial completion deadline for the above referenced project is unattainable.
In response to your November 17, 1997 correspondence to this office requesting an extension of time,
enclosed please find Change Order No. 1. Said Change Order revises the Contract Time as defined
under "Information to Bidders - #5" (Page ITB -1) of the Specifications in order to avoid construction
during inclement winter months. The new date of substantial completion shall he July 31, 1998.
If this extension of contract time meets with your approval, please sign and return the enclosed
Change Order. Upon execution by the Town of Wappinger a completed copy will be provided to
your office.
Additionally, I am awaiting a response regarding previous correspondence to your office as outlined
below:
1. Correspondence dated September 3, 1997 regarding Pre -Construction
Information. The following three items from this correspondence are still
outstanding:
a. Minority and Women Business Enterprises Work Plan as outlined on
pages M/WBE-1 through MIWBE-7 of the Specifications.
b. Construction Quality Assurance/Construction Quality Control
(CQA/CQC) Plan as outlined on Page 10.01-2 of the Specifications.
Complete Construction Schedule. This item was previously submitted
by your office, but must be revised to reflect a new construction start
date of April 1, 1998 and a new substantial construction completion
date of July 31, 1998.
2, Correspondence dated November 21, 1997 regarding our review of your
material pre -qualification submittals.
Joseph E. Paggi, Jr., EE. Ernst Martin, Jr., P.E., L.S. printed on recycled paper
MItchell Berkey - 2 - December 2, 1997
RE: Castle Point Landfill
If you have any questions or comments, please feel free to contact this office.
Thank you for your consideration in this matter.
Very truly yours,
Peter J. Paggi
PJPAaw
Enclosure
cc: Hon. Constance O. Smith, Supervisor
Hon. June Visconti, Councilperson
Hon. Vincent Bettina, Councilperson
Hon. Joseph Ruggiero, Councilperson
Hon. Robert Valdati, Councilperson
Albert P. Roberts, Esq.
Elaine Snowden
CHANGE ORDER
NO.: 1
DATE: 12/02/97
ENGINEER'S PROJECT NO.: 86-003 14
PROJECT: CASTLEPOINT LANDFILL PROJECT
NATURE OF CHANGES:
CHANGE IN CONTRACT TIME AS DEFINED UNDER "INFORMATION TO BIDDERS - #5" (PAGE -ITB -11 OF THE
SPECIFICATIONS. CHANGE IS TO AVOID CONSTRUCTION DURING INCLEMENT WINTER MONTHS.
ENCLOSURE: NONE
ADJUSTMENT OF CONTRACT AMOU-NT: NIA
ORIGINAL CONTRACT AMOUNT:
$
444,008.00
PRIOR CHANGE ORDER (+,-):
$
0.00
THIS CHANGE ORDER (+,-):
$
0.00
REVISED CONTRACT AMOUNT:
$
444,008.00
AMSTMENT OF CONTRACT TIME:
CONTRACT TIME PRIOR TO THIS CHANGE ORDER:
SUBSTANTIAL COMPLETION BY SEPTEMBER 30-1997.
NET (INCREASE) RESULTING FROM THIS CHANGE ORDER: 10+ MONTHS
CURRENT CONTRACT TIME INCLUDING THIS CHANGE ORDER:
SUBSTANTIAL COMPLETION BY JULY 31, 1998.
OTHER CONTRACTS AFFECTED: NONE
SUBMITTED BY: DATE
(Engineer's Signature)
APPROVED BY: DATE
(Owner's Signature)
ACCEPTED BY: _ DATE
(Contractor's Signature)
DISTRIBUTION: OWNER [ } CONTRACTOR [ ] ENGINEER ( ] FIELD REPRESENTATIVE ( ]
OTHER
CO -1
PAGGI & MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905(FAX)
November 21, 1997
Hudson Canyon Construction, Inc.
115 Devries Avenue
North Tarrytown, New York 10591
Attention: Christopher T. Coyle
Reference: Castlepoint Landfill
Town of Wappinger
Dear Mr. Coyle:
RECEIVED
N 2 6 1997
E ° N� SN�W�
CL�k �N
This office has reviewed your Material Pre -qualification Submittals dated November 17, 1997, for the
above referenced project. Our comments are as follows:
A. Comments on the Clay Barrier Layer Pre -Qualification Test Results:
1. Natural moisture content vs. optimum moisture content test results indicate
that moisture conditioning of the clay (wetting/drying) may be required to
obtain the 2 % wet - 2 % dry (of optimum) in place moisture content. What
methods are proposed for field moisture conditioning of clay during
construction of the layer? How will this work be coordinated with lab
personnel?
2. Why do the direct shear tests note that "Test results do not comply with
specifications"? In what way don't they comply?
3. Please provide descriptive information regarding the borrow source and
quantity as per the specs (pg. 3.01-2).
4. Please note that the Atterberg Limits test results (liquid limits 20 - 28; plastic
limits 18 - 21; and plasticity index of 2 -7) are more indicative of a silt or fine
sand rather than a clay material. It should also be noted that the permeability
results, while pa�i g, were somewhat borderline, especially #97-1082C (i.e.
K20 = 8.4 x 10 cm/sec).
5. Please note the disclaimer on the lab permeability test results. Acceptance of
lab permeability test results in no way relieve the Contractor for his
responsibility to achieve final, in-place permeability results in conformance
with the specifications.
6. Please note that Contractor must construct and achieve satisfactory test results
for the Barrier Layer Test Pad prior to the start of construction of the Barrier
Layer (pg. 3.01-6, 7).
7. Please provide the Construction Quality Assurance/Quality Control Plan as
specified (pg. 10.01-2) prior to the start of construction.
Joseph F. Paggi, Jr., P.E. Ernst Martin, Jr., RE., L.S. � printed on recycled paper
Christopher Coyle - 2 - November 21, 1997
RE: Castlepoint Landfill
B. Comments on the Barrier Protection Layer Material Pre -Qualification Test Results:
1. Please provide descriptive information regarding the borrow source and
quantity as per the specifications (pg. 4.01-2).
2. Natural moisture content vs. optimum moisture content test results indicate
that moisture conditioning of the barrier protection layer material
(wetting/drying) may be required to obtain the 2 % wet - 2 % dry (of optimum)
in place moisture content. What methods are proposed for field moisture
conditioning of the material during construction of the layer? How will this
work be coordinated with lab personnel?
3. Please provide information indicating that the proposed material contains no
more than 200 rock and conforms to "fine to coarse GW" as defined under
the Unified Soil Classification System (pg. 4.01-2).
4. It appears as if your gradation analysis utilizes the "old" specification used for
the first bid of the project (i.e. March 97). The gradation analysis was revised
for the second bidding of the project (i.e. May 97). Please revise your
gradation analysis accordingly and resubmit this item.
5. Please provide the Construction Quality Assurance/Quality Control plan as
specified (pg. 10.01-2) prior to the start of construction.
6. The visual description is noted as "recycled soil". Please provide information
as to the source, processing and quality of said soil. Please note that the
Engineer shall have sole discretion for the suitability of any materials.
C. Comments on the Topsoil Laver Material Pre -Qualification Test Results:
1. Please provide descriptive information regarding the borrow source and
quantity.
2. As per the specifications, please certify that the topsoil meets either:
a. New York State Department of Transportation Specifications, or
b. That as per a soil scientist, the topsoil can adequately sustain vegetative
growth.
3. The pH test result (7.8) exceeds the specified range of 5.5 - 7.6.
4. Please note that all topsoil is subject to a visual test for foreign or deleterious
materials.
5. Please provide the minimum Soil Nutrient Analysis as detailed on page 5.01-5,
including description and classification of soils.
Christopher Coyle - 3 - November 21, 1997
RE: Castlepoint Landfill
D. Miscellaneous Comments:
1. As a clarification, please note that the New York State Department of
Environmental Conservation did not tell this office that starting the project
now was "inadvisable", as indicated in your cover letter. In our conversations
over the past few months, various N.Y.S.D.E.C, personnel have indicated to
our office that beginning such a large earth moving project during the winter
months could cause them concern especially with maintaining the integrity of
the job site, slopes, material, etc., during extended periods of inclement
weather. The ultimate decision of the suitability of the weather to perform the
work rests with the Town (Engineer).
2. Your submittals for all three materials shall be considered incomplete until
such time as all requested information and/or clarifications are submitted to
this office for review and approval.
3. This material pre -qualification review is limited to the specific information
submitted and does not relive the Contractor of any of his requirements under
the Contract Specifications. 'Field verification of all material acceptance
criteria shall be the sole responsibility of the Contractor.
4. By copy of this letter, I am transmitting all Pre -Qualification submittals to Mr.
Tom Miller of the N.Y.S.D.E.C. for his review. I will be contacting Mr.
Miller to schedule an onsite meeting in the near future.
If you have any questions or comments, please feel free to contact this office.
Thank you for your consideration in this matter.
Very truly yours,
Peter J. paggi
PJP:law
Q% -
cc: Hon. Constance O. Smith, Supervisor
Hon. June Visconti, Councilperson
Hon. Vincent Bettina, Councilperson
Hon. Joseph Ruggiero, Councilperson
Hon. Robert Valdati, Councilperson
Elaine Snowden
Mr. Tom Miller, N.Y.S.D.E.C.
11/16/1997 29:32 19146315652 HCC PAGE 02
H.C.C.
HUDSON CANYON CONSTRUCTION 1 113 "'VRIES AVENUE 6 N. TAIROR YTCWN. NY 10591
November 17, 1997, l9 11y 1 a_:1
Mr, Peter Paggi
Paggi & Martin i�g�
Consulting Engineers
54-56 Main Street 1
r13�1'�Er
Poughkeepsie, NY 1260.1 ��-
Re: Castlepoint Landfill
Wappingers, New York
HCC Project No, 1162
Material Pre -Qualification Submittals
* (Origi"al to follow "is U.S. Mail, under ScpW-4te cover)
Dear Mr. Paggi:
Please find enclosed Otte copy of the pre -qualification, submittals for your review and approval.
(As delivered by Advance Testing Personnel, accompanied by fax copy of this cover letter.) We
apologize for the delays in obtaining this information and have attempted to beep your office
apprised of the delays, as they occurred.
Based on our telephone conversations, we would agree with the NYSDEC that it is not advisable
to begin the project during the winter months, Therefore, Hudson Canyon Construction, Inc.
(H.C.C.) will await further direction and would appreciate being granted a time extension to the
contract. As a result of mutual cooperation between all parties involved, H,C_C. will endeavor to
complete the project as expeditiously as possible.
If you have any questions, or require any further information, please do not hesitate to contact
me.
Very truly yours,
HUDSON CANYON CONSTRICTION, DNC.
C,
Christopher T. Coyle
CTC
Enclosures (1)
ELA1
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1604
November 17, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
Attn.: Mitch Berkley
Dear Mr. Berkley,
Project: Castle Point Landfill
Project No.: 970210
Attached please find complete results for prequalification testing for the above mentioned project.
The following materials wre tested in accordance with the specification: clay barrier layer, barrier
protection layer and topsoil.
If you have any questions please do not hesitate to contact me.
Thank you.
ADVANCE TESTING CO., INC.
Christo h r M. Brower
T
C
October 16, 1997
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Hudson Canyon Construction
1 t5 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
W1062A
PROJECT: Castle Point Landfill
PROJECT NO.: 970210
NATURAL MOISTURE CONTENT
ITEM:
Clay Barrier
SOURCE:
Southern Dutchess Sand and Gravel
SAMPLED BY:
J. Maley on October 14, 1997
TESTED BY:
J. Lynch on October 15, 1997
LAB NO.: 97-1082A
NATURAL MOISTURE CONTENT: 25.5%
A
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
November 10, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
hu 1082b
PROJECT: Castle Point Landfill
PROJECT NO.: 970210
MOISTURE CONTENT
ITEM:
Clay Barrier
SOURCE:
Southern Dutchess Sand and Gravel
SAMPLED BY:
J. Maley on October 14, 1997
TESTED BY:
J. Lynch on November 10, 1997
LAB NO.: 97-1082B
NATURAL MOISTURE CONTENT: 12.6%
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Mall, NY 10916 • (914) 496-1600
November 10, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
e..ioezc
PROJECT: Castle Point Landfill
PROJECT NO.: 970210
MOISTURE CONTENT
ITEM:
Clay Barrier
SOURCE:
Southern Dutchess Sand and Gravel
SAMPLED BY:
J. Maley on -October 14, 1997
TESTED BY:
J. Lynch on November 10, 1997
LAB NO.: 97-1082C
NATURAL MOISTURE CONTENT: 16.8%
A
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 1-0916 • (914) 496-1600
Client:
Hudson Can on Construction
ATC Project No.:
970210
Date:
October 16, 1997
Project:
Castle Point Landfill
Source:
Southern Dutchess S & G
Lab No.:
97-1082A
Item:
1 Clay Barrier
Date Sam led:
10/14/97 by: J. Male
Date Tested:
10/16/97 by: R. Patton
Atterberg Limits
Test Method: ASTM D4318/AASHTO T89, T90
RPcinlfc
Lab No.
97-1082A Sec.
Liquid Limit
25
Plastic Limit
19
Plasticity Index
6
Notes:
Report Reviewed by: �414W_p
HMIMA
IV
IFt,
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbeli Hall, IVY 10916 • (914) 496-1600
Client:
Hudson Can on Const.
ATC Project No.:
970210
Date:
November 7, 1997
Project:
Castle Point Landfill
Source:
South Dutchess S & G
Lab No.:
97-1082B
Item:
Clay barrier layer
Date Sampled:
10/14/97 by: J. Male
Date Tested:
1117197 b : M. Manzo
Atterberg Limits
Test Method: ASTM D4318/AASHTO T89, T90
Results
Lab No.
97-1082B Spec.
Liquid Limit
20
Plastic Limit
18
Plasticity Index
2
Notes:
Report Reviewed by:
".6,Me
IVA
T
Advance Testing Company, Inc.
C 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Client:
Hudson Canyon Construction
ATC Project No.:
970210
Date:
October 30, 1997
Project:
Castle Point Landfill
Source:
Southern Dutchess S & G
Lab No.:
97-1082C
Item:
Clay barrier layer
Date Sampled:
10/14/97 by: J. Male
Date Tested:
10/30/97 by: C. Devlin
Atterberg Limits
Test Method: ASTM D4318/AASHTO T89, T90
Results
Lab No.
97-1082C Sec.
Liquid Limit
28
Plastic Limit
21
Plasticity Index
7
Notes:
�4�Report Reviewed by: —L -_
N"I�
IV
11
Advance Testing Company, Inc.
C I ■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATCLab #
97-1082A
Project
Castle Point Landfill
Project #
970210
Source
Southern Dutchess S & G
Sample Date
10/14/97
Sample Type
Clay Barrier
By
J. Maley
Sample Location
Stockpile
Tested Date
10/15/97
Specification
3.01.2A
By
M. Seidman
Lab No. 97-1082A
Sieve
0/.Ret
% Pass Spec.
1"
0.0
100.0 100.0
112"
0.0
100.0
1/4"
0.0
100.0
#4
0.1
99.9
#10
0.4
99.5
#20
0.7
98.8
#30
0.5
98.3
440
0.9
97.4
#80
7.1
90.3
#200
8.9
81.4
Pan
81.4
1 0.0
Code: SAG
hw'Mtl
UA
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail * Campbell Hall, NY 10916 * (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATC Lab #
97-1082B
Project
Castle Point Landfill
Project #
970210
Source
Southern Dutchess Sand & Gravel
Sample Date
10/14/97
Sample Type
Clay Barrier
By
.1. Maley
Sample Location
Stockpile
Tested Date
10/29/97
Specification I
3.01.2A
By
J. Mattia
Comments:
Code:
i. 1.2e
Lab No. 97-1082B
Sieve
0/.Ret
%Pass Spec.
1"
0.0
100.0 100.0
112"
0.0
100.0
114"
0.0
100.0
#4
0.4
99.6
#10
0.5
99.1
#20
0.9
98.2
#30
0.6
97.6
#140
0.9
96.7
#80
8.6
88.1
#200
12.0
76.1
Pan
76.1
0.0
Minus #200 By Wash
SAG
0
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATCLab #
97-1082C
Project
Castle Point Landfill
Project #
970210
Source
Southern Dutchess Sand & Gravel
Sample Date
10/14/97
Sample Type
Clay Barrier
By
J. Maley
Sample Location
Stockpile
Tested Date
10/29/97
Specification.—A
3.01.2A
I
J. Mattia
Comments:
Code:
Lab No. 97-1082C
Sieve
%Ret
% Pass Spec.
1"
0.0
100.0 100.0
1/2"
0.0
100.0
1/4-t
0.0
100.0
#4
0.2
99.8
410
0.6
99.2
#20
0.9
98.3
#30
0.6
97.7
#40
0.8
96.9
#80
3.3
93.6
4200 1
6.2
87.4
Pan 1
87.4
0.0
Minus #200 By Wash
SAG
A Advance Testis Company,In .
Tg c
C■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
CLIENT: Hudson Canyon Construction PROJECT: Castle Point Landfill
PROJECT NO.: 970210
SAMPLE ANALYSIS REPORT
ATC LAB NUMBER: 97-1082A
TEST PERFORMED: Traixial Permeability Test Using Backpressure
TEST METHOD: ASTM D5084
ITEM: Clay Barrier
SOURCE: Southern Dutchess Sand and Gravel
DATE SAMPLED: 10/14/97 SAMPLED BY: J. Malley
DATE TESTED: 10/23-24/97 TESTED BY: Kevin Patton
PROCTOR TEST DATA TEST METHOD: D698
MAXIMUM DRY DENSITY, PCF: 106.7
OPTIMUM MOISTURE CONTENT PERCENT OF DRY WEIGHT: 18.2
SAMPLE PREPARATION METHOD: SOIL CLODS BROKEN/CHOPPED TO PASS <112 -INCH SIEVE.
COMPACTED IN 1 cm LIFTS SCARIFIED BETWEEN LIFTS.
TEST SAMPLE DIMENSIONS
BEFORE TEST
AFTER TEST
HEIGHT, cm:
8.69
8.38
DIAMETER, cm:
7.35
7.42
MOISTURE CONTENT, %:
20,30
21.17
DRY DENSITY, PCF:
105.41
107.23
PERMEABILITY TEST CONDITIONS
TYPE OF WATER USED: Tap Water EFFECTIVE STRESS, PSI (MINIMAX): 4.7515.68
MAXIMUM BACK PRESSURE: 71.0 psi INITIAL DEGREE OF SATURATION: 91.5%
HYDRAULIC GRADIENT: 6.6 FINAL DEGREE OF SATURATION: 99.9%
Specific gravity 2,70 (EST.)
PERMEABILITY TEST RESULTS
COEFFICIENT OF PERMEABILITY AT 200C { GOOF)
k2o = 2.3 x 10-6 CM/SEC
SPECIFICATION: k. =1.0 x 10-5 CM/SEC
TEST RESULTS COMPLY WITH SPECIFICATION
THIS TEST WAS PERFORMED IN ACCORDANCE WITH THE METHOD REFERENCED. PERMEABILITY VALUES
ATTAINED UNDER FIELD CONDITIONS WILL BE INFLUENCED BY COMPACTION DENSITY, COMPACTION
MOISTURE CONTENT, COMPACTION EQUIPMENT USED, VARIATIONS IN M RIAL, P EPARATION
METHODS, SUBGRADE CONDITIONS, WEATHER, AND OTHER FACTORS. n /�
HWOM
REPORT REVIEWED BY: V��V
A Advance TestingCom
T Company, Inc.
C■ 22 Sarah Wells Trail * Campbell Hall, NY 10916 - (914) 496-1600
CLIENT: Hudson Canyon Construction PROJECT: Castle Point Landfill
PROJECT NO.: 970210
SAMPLE ANALYSIS REPORT
ATC LAB NUMBER: 97-1082B
TEST PERFORMED: Traixial Permeability Test Using Packpressure
TEST METHOD: ASTM D5084
ITEM: Clay Barrier
SOURCE: Southern Dutchess Sand & Gravel
DATE SAMPLED: 10/14/97 SAMPLED BY: .tames Malley
DATE TESTED: 1114-5497 TESTED BY: Mike Creeden
PROCTOR TEST DATA TEST METHOD. D698
MAXIMUM DRY DENSITY, PCF: 108.0
OPTIMUM MOISTURE CONTENT PERCENT OF DRY WEIGHT: 17.1
SAMPLE PREPARATION METHOD: SOIL CLODS BROKENICHOPPED TO PASS 112 -INCH SIEVE.
COMPACTED IN 1 cm LIFTS SCARIFIED BETWEEN LIFTS.
TEST SAMPLE DIMENSIONS
BEFORE TEST
AFTER TEST
HEIGHT, cm:
10.20
8.80
DIAMETER, cm:
7.30
7.70
MOISTURE CONTENT, %:
13.25
20.20
DRY DENSITY, PCF:
102.61
106.89
PERMEABILITY TEST CONDITIONS
TYPE OF WATER USED: Tap Water EFFECTIVE STRESS, PSI (MINIMAX): 3.2114.78
MAXIMUM BACK PRESSURE: 67.8 PSI INITIAL DEGREE OF SATURATION: 55.7%*
HYDRAULIC GRADIENT: 10.9 FINAL DEGREE OF SATURATION: 94.5%*
SpeCMC Gravity = 2.70 (EST.)
PERMEABILITY TEST RESULTS
COEFFICIENT OF PERMEABILITY AT 20OC ( 68°F }
k2o = 4.2 x 10'6 CM/SEC
SPECIFICATION: k2o = 1.0 x 10-5 CMISEC Maximum
TEST RESULTS COMPLY WITH SPECIFICATION
THIS TEST WAS PERFORMED IN ACCORDANCE WITH THE METHOD REFERENCED. PERMEABILITY VALUES
ATTAINED UNDER FIELD CONDITIONS WILL BE INFLUENCED BY COMPACTION DENSITY, COMPACTION
MOISTURE CONTENT, COMPACTION EQUIPMENT USED, VARIATIONS IN MATERIAL, PREPARATION
METHODS, SUBGRADE CONDITIONS, WEATHER, AND OTHER FACTORS.
*w� REPORT REVIEWED BY:
A Advance Testing J Com an p Y, Inc.
C■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
CLIENT: Hudson Canyon Construction PROJECT: Castle Point Landfill
PROJECT NO.: 970210
SAMPLE ANALYSIS REPORT
ATC LAB NUMBER: 97-1082C
TEST PERFORMED: Traixial Permeability Test Using Packpressure
TEST METHOD: ASTM D5084
ITEM: Clay Barrier
SOURCE: Southern Dutchess Sand & Gravel
DATE SAMPLED: 10/14/97 SAMPLED BY: James Malley
DATE TESTED: 1114-5-197 TESTED BY: Mike Creeden
PROCTOR TEST DATA TEST METHOD. D698
MAXIMUM DRY DENSITY, PCF: 106.8
OPTIMUM MOISTURE CONTENT, PERCENT OF DRY WEIGHT. 18.5
SAMPLE PREPARATION METHOD: SOIL CLODS BROKEN/CHOPPED TO PASS 112 -INCH SIEVE.
COMPACTED IN 1 cm LIFTS, SCARIFIED BETWEEN LIFTS.
TEST SAMPLE DIMENSIONS
BEFORE TEST
AFTER TEST
HEIGHT, cm:
9.97
9.72
DIAMETER, cm:
7.27
7.31
MOISTURE CONTENT, 96:
20.0
25.83
DRY DENSITY, PCF:
95.77
97.22
PERMEABILITY TEST CONDITIONS
TYPE OF WATER USED: Tap Water EFFECTIVE STRESS, PSI (MINIMAX): 5.3016.36
MAXIMUM BACK PRESSURE: 68.3 PSI INITIAL DEGREE OF SATURATION: 71.096"
HYDRAULIC GRADIENT: 7.3 FINAL DEGREE OF SATURATION: 95.096"
Specific Gravity = 2.70 (EST.)
PERMEABILITY TEST RESULTS
COEFFICIENT OF PERMEABILITY AT 20°C ( 68OF )
k2o = 8.4 x 10-6 CMISEC
SPECIFICATION: k2o = 1.0 x 10-5 CWSEC Maximum
TEST RESULTS COMPLY WITH SPECIFICATION
THIS TEST WAS PERFORMED IN ACCORDANCE WITH THE METHOD REFERENCED. PERMEABILITY VALUES
ATTAINED UNDER FIELD CONDITIONS WILL BE INFLUENCED BY COMPACTION DENSITY, COMPACTION
MOISTURE CONTENT, COMPACTION EQUIPMENT USED, VARIATIONS IN MATERIAL, PREPARATION
METHODS, SUBGRADE CONDITIONS, WEATHER, AND OTHER FACTORS.
H,�. REPORT REVIEWED BY:
Advance TestingCompany, Inc.
C 22 Sarah Wells Trail 0 Campbell Hall, NY 10916 0 (914) 496-1600 0 FAX 496-1398
CLIENT:gudson Canyon Construction ATC PROJECT NO.: 9`70 -7-/9
PROJECT -.97-1082A
ATC LAB NUMBER: 97--1082A
SOIL. ID NUMBER CL -5
TEST PERFORMED: MOISTURE -DENSITY RELATIONSHIP OF SOIL ( PROCTOR TEST )
TEST METHOD: ASTM D698, Method A
rrEM: Clay barrier --Layer
SOURCE: Southern Dutchess Sand ✓k Gravel
DATE SAMPLED 10114/97
SAMPLED BY. -T. Maley
DATE'IESTED 10/21/97 TESTEDBY:31 Percoski
107
1016
105
1,04
103
RESULTS OFPROCTOR MOISIZME-DENSITY TEST
Visual Description: Brown clayey sand silt
14 15 16 17 18 19 20 21 22
MOISTURE CONTENT, PERCENT OF DRY WEIGHT
xlsity : 106.7
e Content 18.2
les: N/A
asize:N/A
ry. Darsity.- N/A
re Content: N/A
.NCLLit
•/9
ib/c:t_JL
0
INDIVIDUAL TEST
POINTS
PERCENT
M0JSTURE
DHT
DE16=
14.4
103.1
17.9
106.6 €
19.2
106.1
21.2
103.9
Samples are prepared by the -dry- method and compacted using a mamwl razor. Wben the coated of"ovemim" particlts eztteds 3X. resuhs arc
corrected per AMU D4718. The specific gravity of the oversize maybe determined liem test ( see report) fimen euating dots, or may be cd mded %
Report Reviewed By: / {
r't
WE
Advance` Yes#g: Company, 'ln'c:.
T ~�
22 Sarah Wells Trall Campbell Hal{,
. , NY 10916:0 (914) 496x1600 0 FAX 496-1398
- 0
C
CLIENT; Hudson Canyon Construction ATC PROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER: 97-1082B
SOIL ID NUMBER:: CL -6r. a
TEST PERFORMED: MOIS'iURE-DENMTY RELATIONSHIP OF SOIL. ( PROCTOR TEST)
TF. UMIOD: ASTM.D698, Method A
fI'Rlirt: ` Clay barr. sayer
SOi1RCE, Sonthern butches " Sand' & Gravel
DATE.SAMPL;ED Octobe>c 14,�1g9T ` Maley
DA'fETESiED '.Qctober 27,; x;1997; " ' TES mu BY: ,0. Devlin
r ..s
r RESiILTSOFPROG`TIDR MOISTURE-,DF.NSFTP TEST
. {. ',:.i'F !•Y. .rye i'Y, -
VMW Desc1iption Brown clayey sandy silt.
Test Maxum Dry Den*: 108.0 TWCUfi.
Test OptiQuilm Moishve Content 17.1 %9
Percent CNamize Partidim- NIA
Spedfic Gmvity of Oversize N/A
ComcledUm�lmmDry Dauity....N/A gVcu.Jt.
C,orricled 4i. Adotslwm Coruent: N/A Ve'
•NIM
mm
•
105.0
P.
UNINN: MV
::::
18.0
::::::
21.0
..........
...........
UUMMUMMUM..r';e
:::.....•:::::::::::::9:'r.E:•e::cEE:::
I'
LQ
I ::9 .-
108
,W.
: .. Ee EE
0
107-1
Eu.. :�:::;::::::::•w.:::•:::::.;;;;
eE= ::::::. .:...................E.....:.....
:..:......................................
mm
106 m—::::::i.l....................=---...... MV
;:mw•:::::::..w:
: a:u...u��•••.•NU ••if
,i
.ow:
:.Y.•.::
a
p•�.
�
105 a.M .:i ..
••i•
N::Z::✓:
22 Sarah Wells Trail 0 Campbell Hall, NY 10916 0 (914) 496-1600 0 FAX 496-1398
CLIENT: Hudson Canyon Construction ATC PROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER: 97--1082C
SOI, ID NUMBER CL -7
TEST. PERFORMED: MOISTURE DENSITY RELATIONSHIP OF SOIL ( PROCTOR TEST )
TESTMETHOD:ASTM DM. Method A
ITEM: Clay barrier. layer
SOURLM Southern Dutchess-'Sand..;&%iGravel
DATE SAMPLED: October 14, ..199.7 : SAMPLEDiY.-' T. Maley
DATE7ESTED:October .27,, 199.7:, TESTED BY-' M': ' Cteeden
RESULTS OF. 'PROG'I1DR J10ZS7TfR&DF"TYTEST
107,
106
U
105
04
W
104
zA
0 103
a
102
Z
A 101
x
A 100
%stn1Descripti0n Brown clayey sandy silt.
Test Maxirnum Dry Density: 106.8 lWcu-ft.
Test Optimum Moishwe Content 18.5 %
Percent Oversize Particles: N/A %
Specific Gravity ofOversuc: N/A
CorrectedUkdmummDryDauity. N/A. LfVmJt
Corrected Dpi. Moiawm Content: N/A %
17 18 19 20 21 22 23
MOISTURE CONTENT, PERCENT OF DRY WEIGHT
INDIVIDUALTEST
POINTS
PERCW
M01STURE
DRT
DEAWTT
} 4:"
105.5
17.6
106.2
19.0
Advance TestEng
Company,
Unc.
22 Sarah Wells Trail 0 Campbell Hall, NY 10916 0 (914) 496-1600 0 FAX 496-1398
CLIENT: Hudson Canyon Construction ATC PROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER: 97--1082C
SOI, ID NUMBER CL -7
TEST. PERFORMED: MOISTURE DENSITY RELATIONSHIP OF SOIL ( PROCTOR TEST )
TESTMETHOD:ASTM DM. Method A
ITEM: Clay barrier. layer
SOURLM Southern Dutchess-'Sand..;&%iGravel
DATE SAMPLED: October 14, ..199.7 : SAMPLEDiY.-' T. Maley
DATE7ESTED:October .27,, 199.7:, TESTED BY-' M': ' Cteeden
RESULTS OF. 'PROG'I1DR J10ZS7TfR&DF"TYTEST
107,
106
U
105
04
W
104
zA
0 103
a
102
Z
A 101
x
A 100
%stn1Descripti0n Brown clayey sandy silt.
Test Maxirnum Dry Density: 106.8 lWcu-ft.
Test Optimum Moishwe Content 18.5 %
Percent Oversize Particles: N/A %
Specific Gravity ofOversuc: N/A
CorrectedUkdmummDryDauity. N/A. LfVmJt
Corrected Dpi. Moiawm Content: N/A %
17 18 19 20 21 22 23
MOISTURE CONTENT, PERCENT OF DRY WEIGHT
INDIVIDUALTEST
POINTS
PERCW
M01STURE
DRT
DEAWTT
17.0
105.5
17.6
106.2
19.0
106.6
22.3
101.8
Samptes are prepared by the "dry' method and compacted using t mamnl ram—er. Wbes rho coateot of "oversize" particles exceeds 5%. rtsuhs arc
corrected per ASW D4716. The specific gravity of the oversize may be determined from test ( see report,) from csisting datW. or maybe'Amled
rt Rt RAWviewed BY V I B
T
Advance Testing Company, Inc.
CLIENT
Hudson Canyon Construction
PROJECT
Castle Point Landfill
ATC LAB NO.
97 -IOM
TEST PERFORMED:
Direct Shear Test of Soils Under Consolidated Drained Conditions
TEST METHOD:
ASTM D3080, Using Boart-Longyear LG -1 l4 12"xl2" Appaaratus
ITEM:
Clay Barrier Layer
SOURCE:
Southern Dutchess Sand & Gravel. (CL -5)
DATE SAMPLED:
10/14/97 SAMPLED BY: James Malley
DATE TESTED:
ll / 7, 10 / 97 TESTED BY: Kevin Patton
3UMMARF of TEST DATA
Test results do not comply with specifications. Reviewed by:
TEST NUMBER:
1
2
3
NORMAL STRESS, psf
144
288
576
MAX. SHF'AR STRESS, psf
443
498
827
HORIZ, DISPLACEMENT AT MAX. SHEAR
0.150
0.238
0.539
PERCENT MOISTURE, INITIAL
13.78
13.78
13.78
PERCENT MOISTURE, FINAL
13.74
13.76
13.72
DRY DENSITY, PCF, INITIAL
96.03
96.03
96.03
DRY DENSITY, PCF, AT TEST
96,57
96.80
97.31
THICKNESS, INCHES, R TTIAL
5.031
5.031
5.031
THICKNESS, INCHES, AT TEST
5.003
4.991
4.965
DISPLACEMENT RATE in/min
0.01
0.01
0.01
Peak Shear vs. Normal Stress
Vertical vs. Horizontal Displacement
F
Q.
1000
0.12
800
0J
-
d
600
0.08
OF
-1 psi N
400-2
0.06
M 0.04
psi N
r
200
p 0.02—
4 psi N
as
0
m 0
0 100 200 300 400 500 600
-0.02
-0.04
Normal Stress, pst
Horiz. Displ., inches
Shear Stress vs. Displacement
1000
900
800
f
a
700
600
—1 N
y
500mom
psi
2 psi N
400
: -- 4 psi N
300
N
200
100
0
0 0.2 0.4 0.6 0.8 1
1.2 1.4 1.6
Horizontal Displacernent, Inches
Test results do not comply with specifications. Reviewed by:
11
Advance Testing Company, Inc.
■ 92 fiarnh Walls Trail • Camnhell Hall_ NY 10916 • !9141 496-1600
CLIENT
Hudson Canyon Construction
PROJECT
Castle Point Landfill
ATC LAB NO,
97-1082B
TEST PERFORMED:
Direct Shear Test of Soils Under Consolidated Drained Conditions
TEST METHOD:
ASTM D3080, Using Boart-Longyear LG -114 12"x12" Apparatus
]TEM:
Clay Barrier Layer
SOURCE:
Southern Dutchess Sand & Gravel (CL -6)
DATE SAMPLED:
10/14/97 SAMPLED BY: James Malley
DATE TESTED:
11/11-12/97 1 TESTED BY: Kevin Patton
SUMMARY OF DIRECT SHEAR TEST RESULTS
ANGLE OF INTERNAL FRICTION, o, DEGREES 36,10
TANGENT o (phi) 0.730
COHESION C Psf 359.0
SUMMARY OF TEST DATA
TEST NUMBER:
1
2
3
NORMAL STRESS, psf
144
288
576
MAX. SHEAR STRESS, psf
495
523
795
HORiZ. DISPLACEMENT AT MAX. SHEAR
0.118
0.353
0.385
PERCENT MOISTURE, DMTAL
18.37
18.37
18.37
PERCENT MOISTURE, FINAL
18.35
18,35
18.30
DRY DENSITY, PCF, INITIAL
97.20
97.20
97.20
DRY DENSITY, PCF, AT TEST
97.67
97.67
97,96
THICKNESS, INCHES, INTITAL
4.979
4.979
4.964
THICKNESS, INCHES, AT TEST
5.003
5.003
5.003
DISPLACEMENT RATE in/mm
0.01
0.01
0.01
Peak Shear vs. Normal Stress
Vertical vs. Horizontal Displacernent
.� 1000-
+n
0.07
a 800
a0i 0O6
600=
—� 1 psi N
0.04
400
M 0,03
'+ ' 2 psi N
200
p 0.02-
4 psi N
0
E 0.01
0 100 200 300 400 500 600
0
-0.01
Normal Stress, psf
Horiz. Dispi., Inches
Shear Stress vs. Displacement
900
800
700
..
w
CL 600-1
a
psi N
500-2
psi N
400
--- N— 4 psi N
r 300
N
200
100
O
0 0.2 0.4 0.6 0.8 1
1.2 1.4
1.6 1.8 2
Horizontal Displacement, Inches
Test results do not comply with specifications.
Reviewed by:%/
0
T
Advance Testing Company, Inc.
■ 5)P garnh WPIIS Trail e f:amnhPli Hall NY 1OQ1A • IQ1Al AQR-1ron
CLIENT
Hudson Canyon Construction
PROJECT
Castle Point Landfill
ATC LAB NO.
97-1082C
TEST PERFORMED:
Direct Shear Test of Soils Under Consolidated Drained Conditions
TEST METHOD:
ASTM D3080, Using Boart-Longyear LG 114 12"x12" Apparatus
TTFM:
Clay Barrier Layer
SOURCE:
Southern Dutchess Sand & Gravel (CL -7)
DATE SAMPLED:
10/14197 SAMPLED BY: James Malley
DATE TESTED:
11112-13197 TESTED BY: Kevin Patton
SUMMARY OF DIRECT SHEAR TEST RESULTS
ANGLE OF INTERNAL FRICTION, o, DEGREES 41.70
TANGENT o (phi) 0.891
COHESION C Psf 321.5
SUMMARY OF TEST DATA
Test results do not comply with specifications. Reviewed by: /�
PEST NUMBER:
1
2
3
NORMAL STRESS, psf
144
288
576
MAX. SHEAR STRESS, psf
448
581
834
HORIZ. DISPLACEMENT AT MAX. SHEAR
0.247
0.226
0.602
PERCENT MOISTURE, INITIAL
17.47
17.47
17.47
PERCENT MOISTURE, FINAL
17.43
17.39
17.39
DRY DENSITY, PCF, INITIAL.
96.12
96.12
96.12
DRY DENSITY, PCF, AT TEST
96.50
97.17
97.38
THICKNESS, INCHES, INITIAL
4.547
4.547
4.547
THICKNESS, INCHES, AT TEST
4.529
--0()1
4.498
4.488
DISPLACEMENT RATE in/min
0.01
0.01
Peak Shear vs. Normal Stress
Vertical vs. Horizontal Displacement
a
1000-
0.1
a
800 --
0.08-
6M
.08600 a 0.08-1
psi N
..
400
a 0.04
00��-
2 psi N
200
4 psi N
�
0
0,02-—
d
0 100 200 300 400 500 600
� 0
-0.02
Normal Stress, pst
Horiz, Displ., Inches
Shear Stress
vs. Displacement
1200
1000
w
a
IL 800
a
t 1 psi N
Epp
f 2 N
y
psi
4 psi N
m
400
61
r
N
200
0 1
1 1
0 0.5 1 1.5
2
2.5 3
Horizontal Displacement, Inches
Test results do not comply with specifications. Reviewed by: /�
M
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, IVY 10916 • (914) 496-1600
September 15, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
N�2U
PROJECT: Castle Point Landfill
PROJECT NO.: 970210
NATURAL MOISTURE CONTENT
ITEM:
Barrier Protection
SOURCE:
Karta Container
SAMPLED BY:
C. Devlin
TESTED BY:
M. Creeden
LAB NO.: 97-924A
NATURAL MOISTURE CONTENT: 22.1%
A�
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
September 15, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
Hi 4k
PROJECT: Castle Point Landfill
PROJECT NO.: 970210.
NATURAL MOISTURE CONTENT
ITEM:
Barrier Protection
SOURCE:
Karta Container
SAMPLED BY:
C. Devlin
TESTED BY:
M. Creeden
LAB NO.: 97-924B
NATURAL MOISTURE CONTENT: 21.8%
A
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
September 15, 1997
Hudson Canyon Construction
115 Devries Avenue
N. Tarrytown, NY 10591
ATTN: Mitch Berkey
1�.
PROJECT: Castle Point Landfill
PROJECT NO.: 970210
NATURAL MOISTURE CONTENT
ITEM:
Barrier Protection
SOURCE:
Karla Container
SAMPLED BY:
C. Devlin
TESTED BY:
M. Creeden
LAB NO.: 97-924C
NATURAL MOISTURE CONTENT: 23.3%
�Ik
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Client:
Hudson Canyon Construction
ATC Project No.:
970210
Date:
September 13, 1997
Project:
Castle Point Landfill
Source:
Karta Container
Lab No.:
97-924 A,C
Item:
Barrier Protection
Date Sampled:
9111197 by: C. Devlin
Date Tested:
9113197 by: C. Devlin
Atterberg Limits
Test Method: ASTM D4318/AASHTO T89, T90
Results
Lab No.
97-924A
97-924B
97-924C Sec.
Liquid Limit
32
32
32
Plastic Limit
NIA
NIA
NIA
Plasticity Index
N.P.
N.P.
N.P. Non -Plastic
Notes:
Report Reviewed by: 1A&.LXQ
HW924ac
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATC Lab #
97-924A
Project
Castle Point Landfill
Project #
970210
Source
Karta Container
Sample Date
9/10/97
Sample Type
Barrier Protection
By
C. Devlin
Sample Location
Stockpile
Tested Date
9119197
Specification
4.01.2-2.01A
By
J. Lynch
Lab No. 97-924A
Sieve
%Ret
%Pass
Spec.
4"
0,0
100.0
100.0
2"
0.0
100.0
1.5"
0.0
100.0
1 °
0.6
99.4
3/4"
1.7
97.7
1/2"
4.1
93.6
114"
8.2
85.4
#4
5.5
79.9
#10
15.4
64.5
#20
15.7
48.8
7.7
41.1
8.2
32.9
0-70
E
16.8
16.1
7.5
8.6
0-10
8.6
0.0
Comments: Minus #200 By Wash
Code: SAG
hud924A
A
T
C
Source
mple Type
ole Location
Advance Testing Company, Inc,
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
udson Canyon Construction
Castle Point Landfill
Karla Container
Barrier Protection
Stockpile
4.01.2-2.01 A
Lab No. 97-924B
Sieve
%Ret
% Pass
Spec,
4"
0.0
100.0
100.0
2}'
0.0
100.0
1.5"
0.0
100.0
1"
0.0
100.0
3/4"
7.0
93.0
1/2"
7.4
85.6
1/4"
13.9
71.7
#4
5.6
66.1
# 10
12.3
53.8
#20
12.0
41.8
#30
5.3
i 36.5
#40
5.9
30.6
0-70
#80
18.4
12.2
#200
7.2
5A
0-10
Pan
5.0
0.0
Code; SAG
h.024B
ATC Lab # 97-9Z4ts
Project #
970210
'ample Date
9/10/97
BY
C. Devlin
Tested Date
9/16/97
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATC L=Date
Spec.
Project
Castle Point Landfill
Proje
100.0
Source
Karta Container
Sample
mple Type
Barrier Protection
Byn
ole Location
Stockpile
Tested
eciftcation
4.01,2-2.01A
Byh
112"
Lah No. 97-924C
85.7
Sieve
%Ret
% Pass
Spec.
4"
0.0
100.0
100.0
2"
0.0
100.0
1.5"
0.0
100.0
1"
0.0
100.0
314"
5.1
94.9
112"
9.2
85.7
114"
12.8
72.9
#4
5.3
67.6
#10
12.2
55.4
#20
12.8
42.6
#30
5.6
37.0
#40
1 6.0
31..0
0-70
#80
19.4
11.6
#200
7.2
4.4
0-10
Pan
4.4
0.0
Code: SAG
! ud914C
A.
T
Advance Testing Company, Inc.
22 Sarah Wells Trail 0 Campbell Hall, NY 30916 0 (914) 496-1600 0 FAX 496-1
C I
3gg
CLIENT- Hudson Canyon Construction ATC PROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER:
97-924A
16.7
85.8
SOIL tD NUMBER
BP -1
23.6
92.4
TEST PERFORMED:. MOISTURE -DENSITY RELATIONSHIP OF SOIL (PROCTOR TEST)
85.4
TEST METHOD:
'. ASTM D698, Method B
[TEM:
Fill
SOURCE:
Karta Container
DATE SAMPLED.
September 10, 1997 SAMPLED BY:
C'. Devlin
DATE TESTED:
.September 20, 1997 TESTEDBY:
J. Lynch
RESULTS OFPROCT OR MOISTURE-DEANTY TEST'
visual Description: Recycled soil
Test Magnum DryDrxay : 92.9
Tabu&
Test Optimum Moist= Contmjt 2 2.2 ;.
•/,.:;; , ` .
Percent Oversize Particles: m. 10.0
%: _
Specific GravityofOversize_ :. N/A
Corrected Maximum Dry DuuijVN l A : .
WC34f L
Corrected Opt. Moisture Came Wt I /A
dl. ye ..
93
11 FFFFFFRH
H 11
92
91
U
90
e�
W
89
zA
0 88
a
87
z
Q 86
D 85
116 20 24 28
MOISTURE CONTENT, PERCENT OF DRY WEIGHT
INDIVIDUAL TEST'
POINTS
PERCENT
MOISTURE
DRY
DEWJTY
16.7
85.8
19.8
91.3
23.6
92.4
28.2
85.4
!
Samples am prspared by the "dry" method and compacted using a msoual rammer. When the coated of "oversize" particles e=cc s S%, reach are
romated per AVU D4 718. The specific gravity of the oversize may be determined from test ( see report,) from casting data, or may
be estimrted
Report Reviewed By: 1✓
Advance Testing Company, Inc.
C 22 Sarah Wells Trail 0 Campbell Hall, NY 10916 0 (914) 496-1600 0 FAX 496-1398
CLIENT: Hudson Canyon Construction ATC PROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER 97--924B
SOIL ID NUMBER BP -2
TEST PERFORMED: MOISTURE -DENSITY RELATIONSHIP OF SOIL ( PROCTOR TEST)
TESTMEMOD; ASTM D698, Method B
rrEM: Fill
SOURCE: Karta Container
DATE SAMPLED: September 10, 1997 SAMPLED BY: C. Devlin
DATE TESTED: September 20, 1997 TESTED By-. J. Percoski
RESULTS OF PROCTOR MOISTURE -DENSITY TEST
Visual Description: Recycled soil
93
92
8
O
w' 91
U_.
U
a
w
r0.n 90
A
O
a
89
z
m
Q
a 88
Test Maldmum Dry Density : 92.7
Ib/cuff
Test Optimum Moishun Content 17.0
88.9
Percent Oversize particles: .20.0
%
Specific Gravity of Over: N/A
90.5
CorreetedMaximumD,yDensity. N/A
LvcuJL
Corrected Opt. Moisture Content: N/A
`/o
ei�' d ;moi:•-�•^•.......... _ ..... 3:.-.��.,.
INDMDUALTEST
PERI�JVI
MOlBIURE
DRY.
DEAUFFT
11.7
88.9
15.9
92.6
20.5
90.5
21.6
89.0
8mples arc pmpamd by the "dryr me&od sod compacted using r mamd rumaer. VAm the eodeo of -oversize" pw6cles t=ecds 5%. rssda srx
corrected per ASTM D4718. The specific r v4 of the ovmize mw be de ermined firom test (a" rcport,) frvm c7ist6g &ft. or
m yy be es4mde4
Report Reviewed By:
Advance Testing Company, Inc.
22 Sarah Wells Trail 0 Campbell Hall, NY 10916 0 (914) 496-1600 o FAX 496-1398
CLIENT: Hudson Canyon Construction ATCPROJECTNO.: 970210
PROJECT: Castle Point Landfill
ATC LAB NUMBER: 97-9240
SOIL m NUMBER: BP -3
=PERFORMED, MOISTURE -DENSITY RELATIONSHIP OF SOIL ( PROCTOR TEST )
TESTMETHOD: ASTM D698, Method B
ITEM: Fill
SOURCE: Karta Container
DATE SAMPLED: September 10, 1997 SAMPLED BY: C. Devlin
DATEL ESIED: September 20, 1997 TESL DBY: J..Lynch
RESULTS OFPROCTOR MOISTURE -DENSITY TEST
VmW Description: Recycled soil
19 23 , 27 31
MOISTURE CONTENT, PERCENT OF DRY WEIGHT
15.6 .1 89.3
18.2 1 91.9
23.2 1 91.2
27.7 1 85.9
Sarwles am prepared by the "dry, method and compacted using a m=4 ramrner. Wbm the content of -oversize" p"cics cuct& 5%. results art
eon ecled per ASTM N 718. The specific gavity of the oversize may be determined fi-om test ( sec report.) frau agates* fd]attkk dor may be eAinmda
Report Reviewed By: VYvL
A Advance Testis Company,Inc.
.r 9
CL NT Hudson Canyon Canshuction
'PROJECT' Cask Point Landfill
ATC LAB NO. 97-924A
TEST PERFORMED: Dired Shear Test of Soils Under Consolidated Drained Conditions
'TEST MEiTTOD ASTM D3080, U ' Boort LG -1 l4 12"k12"
I1EM: Barrier Protection Fill - BP -1
SOURCE: KA to Container
DATE SAM PIED. 9/10/97 SAMPLED BY: Dcvlin
DATE TESTED .10n -M I TESTED BY: I Kevin Patton
.. 12M 0.15
�0 w
a. 1000 0
L 0.1
a 800
6 e
a
00
400 006 - 2 psi N
200 0- 4
a) 00
' 1
0 100 200 300 400 500 600 -0.05
Normal Stress, psf Horiz. Displ., Inches - -
Shear Stress vs. Displacement
1200
1000
M
O. 800
a
w
.��. em
as
w 400
t
y
200
0
0 0.2 0.4 0.6 0.8 1 1.2 1.4
Horizontal Displacement, Inches
V 4-
A Advance Testis CompanyInc.
-i- g p Y�
CUENT Hudson goam Coashidion
PROJECT Castle Port Undfill
ATC IAB NO. 97-924B
TEST PERFORMED: Dira:t Shear Tact of Soils Under CCom olidatod Dmied Conditions
TEST METHOD: ASTM D3080, Using Boart LG -11412'x12"
HEM Barrier ProWtion Fill, - BP -2
SOURCE Karts Container
DATE SAMPLED: 9/10197 SAMPLED BY: Devlin
DATE TESTED, 10/9,16197 1 TESTED BY: t Kevin peHn"
_CIIMIAMV nrTw[ r n r.A
TEST NUMBER:
1 ` --
- 2
3
NORMAL STRESS, psf
144
288
576
MAX. SHEAR STRESS, psf
206
313
631
HOM. DISPLACEMENT AT MAX. SHEAR
0.148
0.206
0.66
PERCENT MOISTURE, BU17AL
18.14
18.14
18.14
PERCENT MOISTURE, FINAL
18.09
18.07
18.05
DRY DENSITY, PCF, INTTTAL
83.43
83.43
83.43
DRY DENSITY, PCF, AT TEST .
84.78
85-24
85.93
TIRCKNFSS, INCHES, /NIDAL
4.094
4.094
4.094
TMCKNESS, INCHES, AT TESL
4.029
4.007
3.975
DISPLACFMIISf RKTFinlmi n
0.01
0.01
- 0.01
Peak shear vs. Nomnal Stress
Vertical vs. ilorizo" Dt
CL
700
600
0.15
5100
w
0
0.1
400
—� 1 psi N .
w
0
300
200
« 0.06
--� 2 psi N
.0
100
9
1
m
0
i
0 100 2DD 300 400 500 6100
-0.05
Nomnal Stress, psi
Florin. Dlsp� inches
Shear Stress
vs. Displacement
1000
am
w
a
700
_- --
-1 pst N I
600
S
500
2 N
N
_
psi
l
4
400
- 4 psi N I
r
300
200N
100
D
Advance Testing Company, Inc.
CLIENT
Hudson Canyon Construction
PROJECT
Castle Point Landfill
ATC LAB NO.
97-924C
TEST PERFORMED:
Direct Shear Test of Soils Under Consolidated Drained Conditions
TEST METHOD:
ASTM D3080, Using Boart-Longyear LG -114 12"x12" Apparatus
TI'EM:
Barrier Protection Fill - BP -3
SOURCE:
Karta Container
DATE SAMPLED:
9110197 SAMPLED BY: Casey Devlin
DATE TESTED: '1
10/21/97 TESTED BY: Kevin Patton
SUMMARY OF DIRECT SHEAR TEST RESULTS
ANGLE OF INTERNAL FRICTION, o, DEGREES 47.80
TANGENT o (phi) 1.103
COHESION C sf 235
SUMMARY OF TEST DATA
TEST NUMBER:
1
2
3
NORMAL STRESS, psf
144
288
576
MAX. SHEAR STRESS, psf
387
563
867
HORIZ. DISPLACEMENT AT MAX. SIIFAR
0.384
0.411
0.517
PERCENT MOISTURE, INITIAL
22.69
22.69
22.69
PERCENT MOISTURE, FINAL
22.47
22.53
22.40
DRY DENSITY, PCF, WMAL
83.61
83.61
83.61
DRY DENSITY, PCF, AT TEST
84.77
85.15
85.86
THICKNESS, INCHES, INITIAL
3.688
3.688
3.688
THICKNESS, INCHES, AT TEST
3.637
3.621
3.591
DISPLACEMENT RATE I in/min
0.01
0.01 1
0.01
Peak Shear vs. Normal Stress
f r -.-.MI.P.56
r r mm -.am
• r r -WI-.--
„
PW
�MMM��
r rr rr rr rr rr .rr
Vertical vs. Horizontal Displacement
0.12
_
Horiz. Displ., Inches
Shear Stress vs. Displacement
/AN WWp���
0.2 0.4 0.8 0.8
Horizontal Dlsplacemenl, Inches
1 1.2
Reviewed by: �� _„
-1
N
--N
-�
T
C
Advance Testing Company, Inc.
IN 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Gradation Analysis
Client
Hudson Canyon Construction
ATC Lab #
97-925
Project
Castle Point Landfill
Project #
970210
Source
Karta Container
Sample Date
9/10/97
Sample Type
Topsoil
By
C. Devlin
Sample Location
Stockpile
Tested Dale
9/11/97
Specification I
5.0t.2 -2.01A
By
J. Lynch
Lab No. 97-925
Sieve
°/aRet
%Pass
Spec.
3"
0.0
100.0
2"
0.0
100.0
100.0
1.5"
0.0
100.0
1"
0.0
100.0
85-100
3/4"
0.0
100.0
1/2"
1.6
98.4
1/4"
8.6
89.8
65-100
#4
4.0
85.8
#10
14.0
71.8
#20
13.3
58.5
#30
5.9
52.6
#40
6.5
46.1
#80
15.9
30.2
#200
8.8
21.4
20-80
Pan
21.4
0.0.
Comments: Minus #200 By Wash
Code: SAG
WWI
A
T
C
Advance Testing Company, Inc.
■ 22 Sarah Wells Trail • Campbell Hall, NY 10916 • (914) 496-1600
Client:
Hudson Canyon Construction
Date:
September 12, 1997
Source:
Karta Container
Item:
I Topsoil
Lab No. 97-925
PH 7.8
% organic 7.1
to 2$
Project Name•
Project No.:
Lab No.:
Date Sampled
Date Tested:
Summary of results
Castle Point Landfill
970210
97-925
9110197 B : C. Devlin
9112197 By: I C. Devlin
5.5-7.6
2-20%
PAGGI & MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAX)
October 15, 1997
Hudson Canyon Construction, Inc.
115 DeVries Avenue
North Tarrytown, New York 10591
Attention: Mitchell Berkey, P.E.
Reference: Castlepoint Landfill Project
Town of Wappinger
Dutchess County, New York
Dear Mitch:
I am writing to request the status of your material pre -qualification testing for the above referenced
project.
Additionally, it appears as if.your Construction Schedule is no longer valid, as a number of milestone
dates have already been exceeded.
It would also appear that if the time periods for each task as noted in your Schedule are accurate, then
you are in danger of exceeding the December 15, 1997 substantial completion date.
Please advise this office of your progress in obtaining suitable materials in sufficient quantities to
perform the work, and submit a revised Construction Schedule to reflect the recent delays.
Any questions or comments may be addressed to this office.
Thank you.
Very truly yours,
Peter J. Paggi
PJP:law
cc; Albert P. Roberts, Esq.
Hon. Constance O. Smith, Supervisor
Hon, June Visconti, Councilperson
Hon, Vincent Bettina, Councilperson
Hon.. Joseph Ruggiero, Councilperson
Hon. Robert Valdati, Councilperson
Elaine Snowden
RECEiilED
OCT Z 0 1991
ELAINE SNOWDEN
TOWN (;�ff
printed on recycled paper
Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S.
PAGGI &. MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914471-7598
914-471-0905 (FAQ
September 23, 1997
Hudson Canyon Construction, Inc.
115 Devries Avenue
North Tarrytown, New York 10591
Attention: Christopher T. Coyle
Reference: Castlepoint Landfill
Town of Wappinger
Dear Mr. Coyle:
This office has reviewed your Shop Drawing submittal dated September 19, 1997 for the above
referenced project. Our comments are as follows:
1. PVC Schedule 40 Drainage Fittings: Approved as noted.
a. Perforations shall be as specified in the Contract Documents.
2. AEF Woven Geotextile (AEF d50WD:. Approved as submitted.
This Shop Drawing approval is limited to the specific information submitted and does not relieve the
Contractor of any of his requirements under the Contract Specifications. Field verification of all
dimensions, sizes, elevations, locations, and grades shall be the sole responsibility of the Contractor.
Copies of all Shop Drawings are enclosed for your files.
Please feel free to contact me if you have any questions or comments.
Thank you for your consideration in this matter.
Very t y yours,
Peter L Paggi
PJP:Iaw
Enclosure
cc: Hon. Constance O. Smith, Supervisor
Hon. June Visconti, Councilperson
Han. Vincent Bettina, Councilperson
Han. Joseph Ruggiero, Councilperson
Hon. Robert Valdati, Councilperson
Elaine Snowden
RECEIVED
SEP 2 4 1997
ELAINE -7 SNOWDEN
TOWN CLERK
Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. pronled on recycled paper
09/19/199-e 11:29
19146215552
N.C.C.
HCC
FA6E 02
HUDSON CANYON CONSTRUCTION ebo'r'ff,10ff wvaNUE • h!. 7w1e1RYTOw", Nr foapl
(614163t.1211
Mr. Peter Paggi
Paggi & Martin
Consulting Engineers
5456 Main Street
Poughkeepsie, NY 12601
Re; Castlepoint Landfill
Wappingers, Now York
HCC Project No, 1162
Submittals
Dear Mr. Paggi:
For the above. referenced project, please find enclosed three (3) copies of the following
documents submitted flar your review and approval,
tional RipC Cornl2l y,
S ;^_"'P0VF_0AS NOT1. PVC Schedule 40 Drainage Fittings specifications and details.
Ll A"'p", I Submitted for use as PVC Gas 'Vents according to contract
specifications,
Am
I} ►�4T1 .0 X45 {� erican Fzngineering_Fabrics. Inc.:
1. Physical Properties Data Sheet for AEF650W, submitted as an equal
for Mirafi 140N as called for in contract specifications. Fabric to be
>,GJEID ANO " ` used in gas vent installation, "truck wash" installation and silt fencing.
I ave any esu ns, or require any further information, please do not hesitate to contact
�r C�
Very truly yours,
HUDSON CANYON CONSTRUCTION, INC.
Cstopher T. Coyle
CTCfje
Enclosures (2)
1p
E,9/ 19,," 199 7 11. 29 1914631565' Hcc
VASSALLO
LIST PRICE NO, SCH40-1296
EFFECTIVE DECEMBER 23, 1996
PVC SCHEDULE 40 DRAINAGE
NON -PRESSURE DWV
FABRICATED SOLVENT WELD
M MBB'R OF AMERICAN
SOCIM FOR TESTNO
AND MATMIAL.S
INDUSTR AS VA,SSALLO, INC.
PO BOX 473`
COTO LAUREL, PUERTO RICO 007eo
TELEPMONI� (787) 848-1515 FAX (787) 848-1766
VASSALLO DISTRIBUTION -CENTER
Io BOX BCT
LAKE WALES. FL 33&5"567
TELEPHONE (941) 676-7975 FAX (941) 67"216
VA+SSALLO U*rOM * 1=6
PAGE 03
4" TO 12"
MEMBER OF loll-sE4
4 PVC PIPE AOCIATtt
D�O BY
P.0, C Y ft
1VO CON,10
Iar
PACE SCH40-1
VA LO UST PMCSS I= JCKWULA 40 $"NCS PAGE SCM34
179x''19!1997 11:29 19146315662
niqTionaL
HCC
VELLANO BEAC CO:
PAGE 04
PVC Pipe for
SrWaste, Vent &
�he�du�le4nd 80
NaWnal PVC has an extremely low thermal candue-
Wty, 1/200 that of sieel and 112000 of Copper. Many
applications can be Used without insulation, thereby
reducing cost,
(0o l'i"
OTHER USES FOR
NATIONAL PVC PIPE
• Corrosive Cooling water
systems
• Sprinkling and lrrigadcn
systems
• Swimming pool piping
• Water filtration plants
• Process water lines
• Potable water piping
• ChOrniral feed lines for
ferric chloride, ferric
sulfate, ferrous sulfate,
hypochlorite, alum chlon-
nated seater, hydrolluosi-
licio acid and activated
carbon slurries
- Sewage plants, to handle
raw 3ew;39e, Sludge and
sewage, sludge and sow.
age gases from dfge$tor's
Due to the potential ha=rds
invvived in Pneumatic
(compressed air) systems
and having no control over
installation and/or applica-
tion, National Pipe Company
will not recommend the us*
Of PVC pipe in pneurnatic
systems,
09/19/1'397 11:'2)9 1914S315652
H',
J J
OurP"M
Sta#Ior
J.J
Adu UP,* ao DurabilStrength,�ilkk%
tion', & So Muer Morei
anvfachninq 5"a nflons for orale, Waste,
Iand VWftP"ipa:
NAlional Pipe Cornparry maraufaatures its pipe
from PVC Cali Glassftatian 124548 (Type 1, Grade 1 )
as described In ASTM -D-1784. It confomTs to ASTM -0-
26M, and U.S. ural ' Specillcaton L -P 34a and
National Sanitation Foun'detion Standard 14 which is
indicaWd by the foil IegG: (NSF-dwvl. itis mamu-
facturpri to IPS o=d%val memkions and has SCh�tdule
40wall thickness. ...
Inventories are maintained in full shipping -units 44n1ain-
Ing 20 -foot lengths of plain -and pips. A trucidoad is
comprises! of 16 units and may Include units of varicaus,
sizes. Freightispre-pais} on all truddoad shrprnentL
SELECTION:
National provides seven stock sizes of PVC pipe for
Grain, Waste and Vent Applications. >5eiaw is a conve-
nient chart noting, the sixes, stack numbers, outside
diameters; and wall thickne615es to make your sped ytng
easier
DRAIN, --7— &VENT RIFE DIMENStQNS:
SHIPPING UNITS
1DAGE 05
Si:e
¢n ir;chee)
stock
Number
"f
Z
36400-122o
36400 -mo
3$400-2020
4
140
36.400-3020
.145
2375
36400-4020
3-600
., e
36400-6020
.237
$
36Wf?-6020
SHIPPING UNITS
1DAGE 05
IINSTALLAMN OF DRAIN, WASTE & VENT PVC- PIPE
of Number Many installers actively prefer PVC pipe ovW mei
bscause, of Its falx. easy insta labor. Joints and fft n9s
Size Lente FO°m4'e are soivemt-welded with enviable simpricity, forrning a
Haff parmarmnt bontL.
1 3,600
Pallets
Minimum WPI
' Outsidio Diameter
-rnikkom
(in Inches)
On Inclees)
1.660
140
1.900
.145
2375
,154
3-600
., e
4.500
.237
6.625
250
3.625
.322
IINSTALLAMN OF DRAIN, WASTE & VENT PVC- PIPE
of Number Many installers actively prefer PVC pipe ovW mei
bscause, of Its falx. easy insta labor. Joints and fft n9s
Size Lente FO°m4'e are soivemt-welded with enviable simpricity, forrning a
Haff parmarmnt bontL.
1 3,600
Pallets
There are no rough corners or surfaces to snag, and the
=00th. Clearl appeamnce of a National Pipe Company
PVC insWiation Is a source of personal pride to the
installer.
NOTE: When Irrsiailirtg under the IAPMO Uniform
Plumbing tea, NatitnaI Pipe Company PVC Pipe
Primer rnust 0e used following Step 2 Refer to Page 9
tor further details.
11h
1184
3,280
2 198
3,960
Full
3
92
1.$4I]
Pallets
i
4
57
1,020
s
.22
440
There are no rough corners or surfaces to snag, and the
=00th. Clearl appeamnce of a National Pipe Company
PVC insWiation Is a source of personal pride to the
installer.
NOTE: When Irrsiailirtg under the IAPMO Uniform
Plumbing tea, NatitnaI Pipe Company PVC Pipe
Primer rnust 0e used following Step 2 Refer to Page 9
tor further details.
a13/15/1997 11:29 191463156132
-AEF Woven 66otextiles
tMCAL ROWAL OKWW
Rap" T4d Method 2aftAv
Nu%cpu9vapluaa+N my, IMer4nk4d�IrroorKdtllthvw na.�ord�y
pr n"*d ►a:rwhi. n0- o xmmkwd is to tha ri a aura, r. 'o 0-r o=m3tu and
mlab* Am iq= &*dww v Fd7eiCti AV, UELrrsr rw mmardobev far tro %W 0
'A awe 0 1 , ft -W Nmwr C&Itfft es fifthav kn +ten a tb t en gra,
HCC PAGE 06
AEf Landscape fabric
Your Answer To:
C WEED CONTROL!
C3 DRAINAGE!
EROSION!
C]vrcblepvJyr�erattd'hlg�r tlYresisfvntpolyprcyyl'er
nonwoven fabric for MuM-Aj� Landsc c pe Use
W 0001rol -tallows moisture and ferffllzers I
p<�w through while lmpreding weed growth.
Drainage and *=ration - separates soil-mulc�
loll- ravel layers. Prevents ermon of emban)
ments. ;r0talhing waft
Weight - 4.5 oz/sq. yd.
Roti Sizer Y x 2W I& x 2W
15' x ?.50'
121Yx250'
For Further Information Please Contact.
d1MIRU ED BY
VE3.l*+4NO BRO$, INC.
Po. sox 837
NOFtT%t RG_ ROUTV 90
AMERICAN ENGINEERING FABRICS, Inc.
1 Coffin Avenue • New Be ftrd. Masscchusetts 02746 -'Tel. (508) 9934622 • FAX (508) 944-7156
ftbroccWkith
� �'�'
•
�
Gab �t
A "_ 776
AM D -4W2
4,2 WVe
200 U
r"V Tommi
ASTM D►4533
90 ft&
9urar 5`lnth
ASTM D-3786
400 psi
ASTM 0-3787(med) 90 lb&
-a
ASTM Dd,'�2 `
20%
Eos
ASTM D43,35
70%; C5ra0 hm)
GW -02215
40
A0300W
Aa4ric8tructurs
-.
Woven
� �'
1
125
Lwvth
v dL
weight
ASTM 0,3776C
s.°8 * ycia
ASTM D.W2
300IbL
TMp rear Sr:.eVth
ASTM U-4533
120 lbs.
tM j* t W)gth
ASTM 0-,3786
600 psi
PkNtit,+lum
ASTM D-3707(rrnaa) 160 tbs
� +
ASTM D4632
20%
(JV RQVWWX�@
ASTM ❑ 335
70% + (Spp h-,)
lao's
2215
40
� 6l141M
F M& Stluc hx*
—
Mwn
FO*-_ Wfcft--
125
bio >�ri
..
100-150 Ilrti yCls.
Gft n
ASTM 4632
D
dw x 2 4 ibL
TMpT0 r3hWVlh
ASTM 04=
100 b
tit Srre oh
ASU 4.3786
450 Ibs
PurcN.x
ASW "787cavd, 125 lh
Haraliart
ASTM 0-4632
25 x 15
W Rodftrx�a
ASTM D-4335
70% * (SM hm)
CVV-=15
40
Ai�dAGNI
FetC
SI1UCfurlt
PMOiy M CompoOcn
—
-,-
WaWn
poopmoy
tic Wd,th
--
Orr {x#+ O=qp& aoc
tic ism
—
100.15Q lim yds,
V^ %"
ASTM 0-3776C
6.3 =A cF
Gf0b 8ftWVM
ASTM 6.4+632
390 x 26fI ltd.
Trap To= Shwvth
ASTM 0-4533
115 x 65 ltd.
&Xxt Stiavh
ASTM D-3786
495 poi
Pump w
ASTM 0-3787(ff�d) 130 Ib&
ftwv7tkCn
ASTM 0-4632
30%
W minae
ASTM D-4335
70% + (500 hm)
Q.S
- -15
70-100
Nu%cpu9vapluaa+N my, IMer4nk4d�IrroorKdtllthvw na.�ord�y
pr n"*d ►a:rwhi. n0- o xmmkwd is to tha ri a aura, r. 'o 0-r o=m3tu and
mlab* Am iq= &*dww v Fd7eiCti AV, UELrrsr rw mmardobev far tro %W 0
'A awe 0 1 , ft -W Nmwr C&Itfft es fifthav kn +ten a tb t en gra,
HCC PAGE 06
AEf Landscape fabric
Your Answer To:
C WEED CONTROL!
C3 DRAINAGE!
EROSION!
C]vrcblepvJyr�erattd'hlg�r tlYresisfvntpolyprcyyl'er
nonwoven fabric for MuM-Aj� Landsc c pe Use
W 0001rol -tallows moisture and ferffllzers I
p<�w through while lmpreding weed growth.
Drainage and *=ration - separates soil-mulc�
loll- ravel layers. Prevents ermon of emban)
ments. ;r0talhing waft
Weight - 4.5 oz/sq. yd.
Roti Sizer Y x 2W I& x 2W
15' x ?.50'
121Yx250'
For Further Information Please Contact.
d1MIRU ED BY
VE3.l*+4NO BRO$, INC.
Po. sox 837
NOFtT%t RG_ ROUTV 90
AMERICAN ENGINEERING FABRICS, Inc.
1 Coffin Avenue • New Be ftrd. Masscchusetts 02746 -'Tel. (508) 9934622 • FAX (508) 944-7156
VEI R. LIS, STEIN EIS, ROBERTS & PERGAMENT
ATTORNEYS AND COUNSELORS AT LAW
1.611 ROUTE 9
WAPPINGERS FALLS, NEW YORK 1.2590
(914) 298-2000
GERALD A. vERGILIS*
KENNETH M.STENGER
ALBERT P. ROBERTS
IRA A. PERGAMENT
ANTONIA T. LUCIA
LOAN F. GARRETT**
THOMAS R. DAVIS
CHRIS MULARADELIS
*ADMI=,D'rG PRACTICE
IN NY & FLA.
*.ADMITTED TO PRACTTCF
IN a TY &. CONN.
August 14, 1997
Town Board, Town of W appinger
20 Middlebush Road
Post Office Box: 324
Wappingers Falls, New York 12590
FAX (914) 298-2842
Attn: Hon. Elaine Snowden, Town Clerk
Re: Castlepoint Landfill Closure
Our File No: 12951.0101
Dear Elaine:
LEGAL ASSISTANTS:
DALE O'DONNELL
AMY E. WOODARD
POUGHKEEPSIE OFFICE
276 MAIN MALL
POUGHK"EEPSIE, NY 12,601
(41.44) 452-1046
ADDRESS RFPIrY TO: ( ) POUGHKF,'EPSIE
) WAPPINGERS
I enclose herewith the Renewal Certificate of General. Liability Insurance in connection with the
above referenced matter. Please note that the termination of the policy is July 30, 1998. The
Certificate of Insurance names the Town of Wappinger as a certificate holder and otherwise
complies with the minimum insurance requirement of the Town.
Very truly yours,
VERGILIS, STENGER, ROBERTS & PERGAMENT
JLI
ERT P. 3ERTS
APR/jwm
Enclosure
PC: Hon. Constance O. Smith, Supervisor (w/o enclosures)
Joseph E. Paggi, Jr., P.E. (w/o enclosures)
111®
PRODUCER......
] INSURED
MILLER & MILLER INS AGCY INC
720 COMMERCE STREET
THORNWOOD NY 10594
HUDSON CANYON CONSTRUCTION INC
115 DEVRIES AVENUE
NORTH TARRYTOWN NY 10591
DATE (MM/DD/YY)
07/31/97
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICES BELOW.
COMPANIES AFFORDING COVERAGE
COMPANY
A CNA INSURANCE COMPANY
COMPANY
B
COMPANY
C
COMPANY
D
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POUCY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH. RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. UMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
CO
LTA
TYPE OF INSURANCE
POLICY NUMBER
POLICY
POLICY EFFECTIVE
(MM/DWlYY)
POLICY EXPIRATION
DATE (MM/DD/YY)LIMITS
AL
GENERAL
LIABILITY
730074647
7/30/97
7/30/98
GENERAL AGGREGATE s2,000,000
X
COMMERCEAL GENERAL LIABILITY
PRODUCTS - COMP/OP AGG sl 000 00 0
CLAIMS MADE FX] OCCUR
PERSONAL & ADV INJURY S1,0 0 000
EACH OCCURRENCE $1,000,000
OWNER'S & CONTRACTOR'S PROT
FIRE DAMAGE (Any or* fire) $ 50,000
MED EXP (Any *r* Person) s 5,000
AUTOMOBILE
LIABILITY
730074647
7/30/97
7/30/98
1,000,000
X
ANY AUTO
COMBINED SINGLE LIMIT f
BODILY INJURY
ALL OWNED AUTOS
SCHEDULED AUTOS
(Per person) =
X
HIRED AUTOS
X
NON -OWNED AUTOS
BODILY INJURY ;
(PK .Mani)
AGE LIAINLITY
ANY AUTO
PROPERTY DAMAGE $
AUTO ONLY - EA ACCIDENT 1 i
EACH ACCIDENT S
AGGREGATE $
EXCESS LIABILITY 730074647 07/30/97 07/30/98 EACH OCCURRENCE s2,000,000
X UMBRELLA FORM AGGREGATE $2 0OO OOO
OTHER THAN UMBRELLA FORM $
WORKERS COMPENSATION AND STATUTORY LIMBS
EMPLOYERS' LIABILITY
EACH ACCIDENT $
THE PROPRIETOR/ INCL DISEASE - POLICY LIMIT $
PARTNERS/EXECUTIVE
OFFICERS ARE: EXCL DISEASE - EACH EMPLOYEE $
OTHER
DESCRIPTION OF OPERATFONSILOCATIOWVEHICLESI$PECIAL ITEMS
RE: CASTLEPOINT LANDFILL CLOSURE
ADDITIONAL INSURED INCLUDES THE TOWN OF WAPPINGER, AND THE FIRM OF PAGGI &
MARTIN ENGINEERS (ENGINEERS TO THE VILLAGE ) ATIMA
TOWN OF WAPPINGER
20 MIDDLEBUSH ROAD
WAPPINGERS FALLS NY 12590
SHOULD ANY OF THE ABOVE DESCRIBED POLICES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAL
30 DAYS WRITTEN NOTICE TO THE CERTSICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON ft CO Y, ITS AGENIS 9L R S ATNES.
AUTNORUD REPRES
GLENN D.
PRODUCER
IINSURED
MILLER & MILLER INS AGCY INC
720 COMMERCE STREET
THORNWOOD NY 10594
HUDSON CANYON CONSTRUCTION INC
115 DEVRIES AVENUE
NORTH TARRYTOWN NY 10591
- »,
kk DATE(MINDINVY)
07/31/97
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICES BELOW.
COMPANIES AFFORDING COVERAGE
COMPANY
A CNA INSURANCE COMPANY
COMPANY
B
COMPANY
C
COMPANY
D
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
CO
LTR
TYPE OF INSURANCE
POLICY NUMBER
LI
POLICY EFFECTIVE
DATE (MMMWYY)
POLICY EXPIRATION
DATE (MMMWYY)
LIMITS
pi
GENERAL
X
LIABILITY
COMMERCIAL GENERAL LIABILITY
CLAIMS MADE [X] OCCUR
OWNER'S &CONTRACTOR'S PROT
-
730074647
7/30/97
7/30/98
GENERAL AGGREGATE s2,000,000
PRODUCTS - COMP/OP AGG $1,0001000
PERSONAL A ADV INJURY $1,000,000
EACH OCCURRENCE S1,000,000
FIRE DAMAGE (Any one Oro) ; 50,000
OTHER THAN AUTO ONLY:
MED EXP (My one aeon) $ 5,000
AGGREGATE S
AUrOMORLELIABILITY
X
730074647
7/30/97
7/30/98
1,000,000
COMBINED SINGLE LIMIT $
OTHER
DESCRIPTION OF OPERATIONS/LOCATION$NEHICLESMPECIAL ITEMS
TOWN OF WAPPINGER
20 MIDDLEBUSH ROAD
WAPPINGERS FALLS NY 12590
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED ED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAR SUCH NOTICE SHALL NYIPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON ,THE COMPANY, ITS AGENTS OR REPRESEIhFATNES.
AUTHORIZED REPREe p
GLENN D .SS E \ $` ..X"<�I� ,;PLJ
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON -OWNED AUTOS
BODILY INJURY ;
(P- P—)
X
X
BODILY INJURY ;
(Per awl)
PROPERTY DAMAGE ;
GARAGE LIABILITY
ANY AUTO
AUTO ONLY - EA ACCIDENT S
OTHER THAN AUTO ONLY:
EACH ACCIDENT $
AGGREGATE S
EXCESS LIABILITY
X UMBRELLA FORM
OTHER THAN UMBRELLA FORM
730074647
07/30/97
07/30/98
EACH OCCURRENCE ; 2,060,000
AGGREGATE s2,000,000
$
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
THE PROPRIETOR/ INCL
PARTNERS/EXECUTNE
OFFICERS ARE: EXCL
STATUTORY LIMBS
EACH ACCIDENT $
DISEASE - POLICY LIMB $
DISEASE • EACH EMPLOYEE $
OTHER
DESCRIPTION OF OPERATIONS/LOCATION$NEHICLESMPECIAL ITEMS
TOWN OF WAPPINGER
20 MIDDLEBUSH ROAD
WAPPINGERS FALLS NY 12590
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED ED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAR SUCH NOTICE SHALL NYIPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON ,THE COMPANY, ITS AGENTS OR REPRESEIhFATNES.
AUTHORIZED REPREe p
GLENN D .SS E \ $` ..X"<�I� ,;PLJ
Town Board, Town of Wappinger
20 Middlebush Road
Post Office Box 324
Wappingers Falls, New York 12590
Attn: Hon. Constance O. Smith, Supervisor
Re: Castlepoint Landfill Closure
Our File No: 12951.0101
Dear Connie:
I am in receipt of a Labor and Materials Payment Bond issued by Colonial Surety Company, 50
Chestnut Ridge Road, Montvale, New Jersey 07645, issued on behalf of Hudson Canyon
Construction, the successful bidder on the Castlepoint landfill closure project. I find said Labor
and Material Bond in proper form and, accordingly, formal contract signing should be arranged.
In connection thereto, the following original documents are being hand delivered to Elaine
Snowden on this date:
1. Labor and Materials Bond No. CSC -200404;.
2. Certificate of Commercial General Liability Insurance;
3. Certificate of Worker's Compensation Insurance;
4. New York State Disability Insurance Certificate; and
VERGILIS, STENGER, ROBERTS & PERGAMENT
ATTORNEYS AND COUNSELORS AT LAW
1611 ROUTE 9
WAPPINGERS FALLS, NEW YORK 12590
(914) 298-2000
GERALD A. VERGILIS*
FAX (914) 298-2842
LEGAL ASSISTANTS:
KENNETH M. STENGER
DALE O'DONNELL
ALBERT P. ROBERTS
AMY E. WOODARD
IRA A. PERGAMENT
ANTONIA T. LUCIA
POUGHKEEPSIE OFFICE
JOAN F. GARRETT**
776 MAIN MALL
THOMAS R. DAVIS
POUGHKEEPSIE, NY 12601
CHRIS MULARADELIS
(914) 452-1046
4ADMITTED TO PRACTICE
ADDRESS REPLY TO: (} POUG,HIUMPSIE
IN NY & FLA.
O WAPPIIJGERS
**ADMITCED TO PRACTICE
IN NY & CONN.
July 23, 1997
Town Board, Town of Wappinger
20 Middlebush Road
Post Office Box 324
Wappingers Falls, New York 12590
Attn: Hon. Constance O. Smith, Supervisor
Re: Castlepoint Landfill Closure
Our File No: 12951.0101
Dear Connie:
I am in receipt of a Labor and Materials Payment Bond issued by Colonial Surety Company, 50
Chestnut Ridge Road, Montvale, New Jersey 07645, issued on behalf of Hudson Canyon
Construction, the successful bidder on the Castlepoint landfill closure project. I find said Labor
and Material Bond in proper form and, accordingly, formal contract signing should be arranged.
In connection thereto, the following original documents are being hand delivered to Elaine
Snowden on this date:
1. Labor and Materials Bond No. CSC -200404;.
2. Certificate of Commercial General Liability Insurance;
3. Certificate of Worker's Compensation Insurance;
4. New York State Disability Insurance Certificate; and
Town Board, Town of Wappinger
Attn: Hon. Constance O. Smith, Supervisor
July 23, 1997
Page 2
5. Performance Bond No, CSC -200404.
Very truly yours,
VERGILIS, STENGER, ROBERTS & PERGAMENT
)LBIERT P. ROBERTS
APR/jwm
Enclosures
PC: Hon. Elaine Snowden, Town Clerk
Hon. Robert Valdati, Councilman (sent to home address)
Hon. June Visconti, Councilwoman (sent to home address)
Hon. Joseph Ruggiero, Councilman (sent to home address)
Hon. Vincent Bettina, Councilman (sent to home address)
Joseph E. Paggi, Jr., P.E.
H.c.c.
HUDSON CANYON CONSTRUCTION I IS DEVRIES AVENUE - N. TARRYTOWN, NY 10591
(91' 4i) 631-1311
July 18,,1997
a
Mr. Albert Roberts
Vc-rgilis, Stenger, Roberts, & Perganient
1611 Rotate 9
Wappingers Falls, NY 12590
Re: Castlepoint Landfill Closure
H.C.C. Pic),ject No. 1162
Labor and Materials Bond
Dear Mr. Roberts:
Please find thf,- folk-o,,-ing -locument enclosed for the above referenced pro.ject:
Labor and Materials Bond (Bond No. CSC -200404).
If vou have any quesnorls, or require any further information, please do not hesitate to contact
tyle.
jC
,Enclosure
cc: Mr. Peter Pagg] (w/o Enc.)
Very tj'd!Y youl-s"
N � S,.r -LrC'-T'TC)�"q "' p Tr'
HUDSON CANYON C0j'4
Joanne Chin
COLONIAL SURETY COMPANY
- Inc. 1930 -
50 Chestnut Ridge Road
Montvale, NJ 07645
(201) 573-8788
LABOR AND MATERIAL PAYMENT BOND
BOND NUMBER: CSC -200404
KNOW ALL MEN BY THESE PRESENTS:
That Hudson Canyon Construction Corp, North Tarrytown, NY as Principal, hereinafter called Principal, and
COLONIAL SURETY COMPANY a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, as
Surety, hereinafter called Surety, are held and firmly bound unto
TOWN OF WAPPINGER, 20 MIDDLEBUSH ROAD, WAPPINGERS FALLS, NY 12590
as Obligee, hereinafter called the Owner, for the use and benefit of claimants as herein below defined, in the amount of
Four Hundred Forty Four Thousand Eight and 00/100 Dollars ( $444,008.00 ),
forthepayment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, Principal has by written agreement dated June 20, 1997 , entered into a contract with Owner for
CASTLEPOINT LANDFILL CLOSURE -CONSTRUCTION OF AN EATHEN CAPPING SYSTEM AND ASSOCIATED
APPUNTENANCES
in accordance with drawings and specifications prepared by (here insert full name, title and address) PAGGI & MARTIN, 54-56
MAIN STREET, POUGHLEEPSIE, NY 12601 — which contract is by reference made a part hereof, and is hereinafter referred to
as the Contract.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if the Principal shall promptly make payment to all
claimants as hereinafter defined for all labor and material used or reasonably required for use in the performance of the Contract then
this obligation shall be void-, otherwise it shall remain in full force and effect, subject, however, to the following conditions:
(1) A claimant is defined as one having a direct contract with the Principal for labor, material, or both, used or reasonably required for
use in the performance of the contract, labor and material being construed to include that part of water, gas, power, light, heat, oil,
gasoline, telephone service or rental of equipment directly applicable to the Contract.
(2) The above-named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined,
who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's
work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such
claimant, prosecute the suit to final judgement for such sum or sums as may be justly due claimant, and have execution thereon. The
Owner shall not be liable for the payment of any costs or expenses of any such suit.
(3) No Suit or action shall be commenced hereunder by any claimant.
(a) Unless claimant, shall have given written notice to any two of the following: the Principal, the Owner, or the Surety above named,
within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for
which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were
furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail
or certified mail, postage prepaid, in an envelope addressed to the Principal, Owner or Surety, at any place where an office is regularly
maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the
aforesaid project is located, save that such service need not be made by a public officer.
(b) After the expiration of one (1) year following the date on which Principal ceased work on said Contract, it being understood,
however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation shall
be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law.
(c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the
project, or any part thereof, is situated, and not elsewhere.
(4) The amount of the bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive
of the payment by surety or mechanics'liens which may be filed of record against said improvement, whether or not claim for the
amount of such lien be presented and against this bond.
Signed and seated this 25th day of June A.D., 1997
In the presence of: HUDSON CANYON CONSTRUCTION CORP
rl
(Seal)
. ...... ... ...... ..
7 j�ktS IDENT
THEODORE J. MLOM,
COLONIAL SURETY COMPANY
B,el 140
,
(,Seal)
✓ ierryan e Irro ttorney-m- act
This bond is issued simultaneously with performance bond in favor of the Owner conditioned on the full and faithful performance of the Contract.
FORM 0200-146
H
Almlh4mcm
HUDSON CANYON CONSTRUCTION 115 DIVRIES AVENUE 0 N, TARRYTOWN, NY 10591
(914)631-1'311
Mr. Albert Roberts
Vergilis, Stenger, Roberts, & Pergament
1611 Rome 9
Wappingers balls, NY 12590
RC: C,18tlepo'nt Landfill .1 Closare
H C. C. Project No. 1.162
Dear NIn Rober-ts:
Please find Ow f1c 11 t),,ving documents enclosed for the above referenced project:
� � 1, 11 -) t
C017
Ce-rufleate of'Wcrker's Compel cation insurance.
3. NY'S Disability Insura.,nee,Cet-6. �,! fiewL
.c,
4. Pcr'lornan.ce Bond (Bond No. CSC -'10()
,404)
ifyo�,i have. any qicsdons, orzieqiAire .1uy further linforr."Iatioll,7 se do not h�,sitX
ate to klil�c;t
me. I P 1. ica
VCry truly Allours,
[ ii
"A)SON CA'`,] "O CONSTRI.XMCAN, IN(-''
loamic ?_`.hin,
J
JC
Enclosures (4)
CC Mr. Peter Paggi (w/o
T'rinder & Norwood, Inc.
I n S U r a n c e B r o k e r s
,June 24, 1997
Town of Wappinger
20 Middlebush Road
Wappingers Fails, NY 12590
This letter serves to deliver a Certificate of Insurance as follows:
For: Hudson Canyon Construction Inc.
X New
Renewal Certificate
Revision of prior Certificate dated
If you have any questions concerning this document, please be certain
to contact this office.
Very truly yours,
Trinder & Norwood, Inc.
icy P, Miller
04710 05188
Remarks:
cc: Hudson Canyon
106 Corporate Park Drive, White Plains, New Nark 10604
Telephones: White Plains: (914) 694-5600 NY: (71'8) 792-9815 Fax: (914) 694-1538
:::f,.::::�r.}:'G ""':•',-^.fi^+5'^•.':':. +ti3':. ;:iC::. ?:tio: :;(>:":"' :0':+ ':.:4:: :. <:.:
kk }i
A ORD
C °`
:.:I:.v oi:t}: i'.' ':n4
DATE MMIDDlYY
.M1A ic.
06/24/97
th �:.+ t
TM
L
::¢ +...:+ <.
..... +.
.:,tib.. ax..Ys's::2:.t a .y:.<.>:... ?:
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
PRODUCER
TRINDER & NQRWDQD, INC.
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
106 CORPORATE PARK DRIVE
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
COMPANIES AFFORDING COVERAGE
WHITE PLAINS, N.Y. 10604
COMPANY
A Royal Insurance Company
INSURED COMPANY
Hudson Canyon Construction, Inc. B
115 Devries Avenue COMPANY
North Tarrytown, NY 10591 __C
COMPANY
D
::.... ... f.n•: ':p:.+::.x.x, ...:ni.:':. +...¢..¢ .:.c:. .. ..+.:.rc}.+.. +::.+::.0 ..: :.ix.�:' ... .. t'r;?�:4--_-•-•--..-...n4.''{."fi? i..:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
CO
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE (MMlDDNY)
POLICY EXPIRATION
DATE (MWDDNY)
LIMITS
GENERAL LIABILITY
GENERAL AGGREGATE
$ 2,000,000
PRODUCTS COMP/OPAGG
$2,000,000
A
COMMERCIAL GENERAL LIABILITY
GSP 235544 0096
12/16/96
12/16/97
PERSONAL &ADV INJURY
$ 1,000-000
+
CLAIMS MADEOCCUR
EACH OCCURRENCE
$ 1,000,000
OWNER'S & CONTRACTOR'S PROT
FIRE DAMAGE (Any one fire)
$ 10,000
MED EXP (Any one person)
$ 5,000
AUTOMOBILE
LIABILITY
COMBINED SINGLE LIMIT
$
A
ANY AUTO
GSP 235544 0096
12/16/96
12/16/97
1,000,000
ALL OWNED AUTOS
BODILY INJURY
$
(Per person)
SCHEDULED AUTOS
—
HIRED AUTOS
BODILY INJURY
$
(Per accident)
NON -OWNED AUTOS
PROPERTY DAMAGE
$
GARAGE LIABILITY
AUTO ONLY_- EA ACCIDENT
$
OTHER THAN AUTO ONLY
ANY AUTO
EACH ACCIDENT
$
$
AGGREGATE
EXCESS LIABILITY
EACH OCCURRFNOE
$ 2,000,000
AGGREGATE
$ 2,0 0,000
A
UMBRELLAPORM
GLA 374060
12/16/96
12/16/97
OTHER THAN UMBRELLA FORM
$
OER
WORKERS COMPENSATION AND
TNRY LIMITS.
- - -- '•'
EL EACH ACCIDENT
EMPLOYERS' LIABILITY
$
EL DISEASE - POLICY LIMIT
$
THE PROPRIETOR/ INCL
EL 0ISEASE - EA EMPLOYEE
$
PARTNERS/EXECUTIVE
OFFICERS ARE: EXCL
OTHER
DESCRIPTION OF OPERATIONSlLOCATIONSNFHICLESISPECIAL ITEMS
RE: CASTLEPOINT LANDFILL CLOSURE
Additional Insured includes The Town of Wappinger, and the firm of Paggi & Martin
Town of Wappi nger SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
20 Mi ddl ebush Road EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
Wappingers Falls, NY 12590 __30- DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE CO ANY, ITS AGENTS OR REPRESENTATIVES,
AUTHORIZE IVE ,C+✓
COLONIAL SURETY COMPANY
- Inc. 1930 -
50 Chestnut Ridge Road
Montvale, NJ 07615
(201) 573-8788
PERFORMANCE BOND
Approved by The American Institute of Architects
A.I.A. Document No. A-311 (Feb. 1970 Edition)
BOND NUMBER: CSC -200404
{NOW ALL MEN BY THESE PRESENTS:
That Hudson Canyon Construction Corp,North Tarr town NY as Principal, hereinafter called Contractor, and
COLONIAL SURETY COMPANY a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, as
Surety, hereinafter called Surety, are held and firmly bound unto
TOWN OF WAPPINGER 20 MIDDLEBUSH ROAD WAPPINGERS FALLS NY 12590
as Obligee, hereinafter called the Owner, in the amount of
Four Hundred Forty Four Thousand Eight and 00/100 Dollars ( $444,008.00 ),
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, Principal has by written agreement dated June 20, 1997 , entered into a contract with Owner for
CASTLEPOINT LANDFILL CLOSURE -+CONSTRUCTION OF AN EATHEN CAPPING SYSTEM AND ASSOCIATED
APPUNTENANCES
in accordance with drawings and specifications prepared by (here insert full name, title and address) PAGGI & MARTIN, 54-56
MAIN STREET POUGHLEEPSIE NY 12601 which contract is by reference rnade a part hereof, and is hereinafter referred to
as the Contract.
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Contractor shall promptly and faithfully perforin
said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
The Surety hereby waives notice of any alteration or extension of time made by the Owner.
Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner- having performed Owner's
obligations thereunder, the Surety may promptly remedy the default, or shall promptly
(1) Complete the Contract in accordance with its terms and conditions, or
(2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of
the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest responsible
bidder, arrange for a contract between such bidder and Owner, and make available as work progresses (even though there should be a
default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay
the cost of completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety
may by liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the contract price", as used in this
paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the
amount properly paid by Owner to Contractor.
Any suit under this bond must be instituted before the expiration of two (2) years from the date on which final payment under the
Contract falls due.
No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the
heirs, executors, administrators or successors of Owner.
Signed and sealed this 25th day of June A.D., 1997
In the presence of:
HUDSON CANYON CONSTRUCTION CORP
Y.. / (Seal)
THEODORE J. W , OON PRESIDENT
COLONIAL SURETY COMPANY
(Seal)
hcrryann e irro ttorney-in- act
FORM 0200-104 (1/97)
06/24/1997 12:41 19146315652. HCC PAGE 03
PERFORMANCE BOND FORM
PROJECT MTL== LmF,�� C�
XT). WAPPINGER
CONSTRUCTION CONTRACT NUMBER B 6 -QQ3 l i Al
NAME OF CONTRACT OAS= -TNT LANDFILL CL,O&M
NAME OF CONTRACTOR HUl)5QN CANYON CONSTRUCTION INC.
BONDING C011PANY OR PERSON ISSUING SECURITY 80ND
COLONIAL SURETY COMPANY
ADDRESS 50 CHESTNUT RIDGE ROAD, MONTVALE, NJ 07645
TELEPHONE NO. 201-573-8788
BONDING COMPANY AGENT N/A
ADDRESS
TRLEPH09Z NO.
AMOUNT OF BOND $ FOUR HUNDRED FORTY FOUR THOUSAND EIGHT AND 00/100 ------DOLLARS
JUNE 20, 1997 ,TUNE 20, 1998
DURATION OF BOND FROM TO
2DEN'.T T')p-TCAT.To1V NUMBTR QF BOND CSC -200404
B - 5 "REV -1 a
COLONIAL SURETY COMPANY
Harrisburg, Pennsylvania
Administrative Offim 50 Chestnut Ridge Road, Montvale, New Jersey 07646
Form S-100-101 (Rev. 7/96)
State of New Jersey
County of Bergen
On this 25th day of June , in the year 1997, before me
Jacqueline Berthelsen, a Notary Public, personally appeared Sherryanne DePirro, personally
known to me to be the person who executed the within instrument as Attorney -in -Fact, on
behalf of Colonial Surety Company therein named and acknowledged to me that the
corporation executed it.
Jacqueline Berthelsen
A Notary Public of New Jersey
My Commission Expires September 8, 2000
Ntate of Aew jersey
COLONIAL SURETY COMPANY
Harrisburg, Pennsylvania
— Inc. 1934 —
FINANCIAL STATEMENT—DECEMBER 31, 1996
ASSETS
*Stocks and Bonds .................... $ 2,668,027
Cash in Office & Banks .................. 1,001,933
Accrued Interest & Dividends ............. 41,007
Premiums & Agents Balances Receivable .... 489,392
Other Assets ......................... 1,551,692
Total Admitted Assets .............. 5,752,051
LIABILITIES & SURPLUS
Reserve for Unearned Premiums . .............$ 803,530
Claim Reserves .......................... 773,000
Other Reserves 49,513
Collateral Held ........................... 1,386,858
Capital Stock ............................ 1,000,000
Surplus ................................ 1,739,150
Total Liabilities & Surplus ............... 5,752,051
"bonds and stocks are valued on basis approved by National Association of Insurance Commissioners.
STATE OF NEW JERSEY ss.:
COUNTY OF BERGEN
1, Wayne Nunziata, President of COLONIAL SURETY COMPANY, do hereby certify that the foregoing is a full, true and correct copy of the
Financial Statement of said Company, as of December 31,1996.
IN WITNESS WHEREOF, I have signed this statement at Montvale, New Jersey, this 31st day of January, 1997.
/\ Surety c\
-cy
0 Incorporated 0
* 1830
\nnsyIV
Jacqueline Berthelsen
A Notary Public of New Jersey
My Commission Expires September 8, 2000
Wayne Nunziata President
STATE OF NEW YORK
WORKERS' COMPENSATION BOARD
ESTADO DE NUEVA YORK - LA JUNTA DE COMPENSACION OBRERA
NOTICE OF COMPLIANCE
DISABILITY BENEFITS LAW
TO EMPLOYEES
1. If you are unable to work because of an illness or
/injury not work-related, you may be entitled to receive
weekly benefits from your employer, or his or her
insurance company, or from the Special Fund for
Disability Benefits.
2. To claim benefitsou must file a claim form within 30
days rom a trs a e o your disabP11LL but in no
event more than 26 weeks from such date.
3. Use one of the following claim forms:
-If, when your disability begins, you are employed or
are unemployed for four weeks or less, use the WHITE
claim form (Form DB -450), which you may obtain from
your employer, his or her insurance carrier, your health
provider or any office of the Workers' Compensation
Board, and send it to your employer or the insurance
carrier named below.
-if, when your disability begins, you have been
unemployed more than four weeks, use the GREEN claim
form (Form DB -300), which you may obtain from any
Unemployment Insurance Office, your health provider, or
any office of the Workers' Compensation Board. Send
completed claim form to the Workers' Compensation
Board, Disability Benefits Bureau, Albany, New York
12241,
IMPORTANT: Before filing your claim, your health
provider must complete the "Health Care Provider's
Statement" on the claim form, showing your period of
disability.
4. You are entitled to be treated by - any physician,
chiropractor, dentist, nurse -midwife, podiatrist or
psychologist of your choice. However, unlike workers'
compensation, your medical bills will not be paid unless
your employer and/or union provides for the payment of
such bills under a Disability Benefits Plan or Agreement.
S. If you are ill or injured during the time you are
receiving Unemployment Insurance Benefits, file a claim
for Disability Benefits as soon as you sustain the injury
or illness, by following the instructions outlined above.
6. If you are out of work in excess of seven days, your
employer is required to send you a Disability Benefits
Statement of Rights (Form DB -271),
7. Other information about Disability Benefits may be
obtained by writing or calling the nearest Workers'
Compensation Board Office.
WORKERS' COMPENSATION BOARD OFFICES
Ailamy, 12241 - 100 Broadway - Menands - (516) 474-6681
Binghamton, 13901 - 113 State Street - {607) 773-7734
AYISO DE CUMPLIMIENTO
LEY DE BENEFICIOS POR INCAPACIDAD
A LOS EMPLEADOS
1, Si no puede usted trabajar debido a enfermedad o lesion
no relacionada con el traba jo, podria tener derecho a
recibir beneficios sema�ales de su patron o de Is
compania de seguros de el/elle o del Fondo Especial para
Beneficios por incapacidad.
2. Para reclamar n f icigA us ebe prosentar line forma
greclamation dentr de 30 a -as a artir de I E era
c a zti
esu inti acr a Pero an ningun caso m s e
semanas de dicha tacha.
3. Use una de las siguientes formas de reclamacion:
-Si; cuando comience su incapacidad usted esti
empleado o ha estado desempleado pQr cuatro semanas
o mends, use Is forma de reclamacion BLANCA (Form
DB -450), Is cual puede obtener de su patron o .de la
compaRfa de seguros de el/ella, o de su proveedor de
cuidados de salud, o bien de cualquier oficina de Is
Junta de Compensation Obrera, y enviela a su patron o
a Is compania de seguros nombrada abajo.
--Si, cuando coMience su incapacidad, usted ha estado
desempleado mats de- 'cuatro '-semanats, use is forma de
reclamacion VERDE (Form DB -300), Is cual puede obtener
on cualquier Oficina de Seguro de Desempieo, de su
proveedor de salud, o bien de cualquier oficina de Is
Junta de Compensation Obrera. Envie Is forma de
reclamacion, debidamente terminada, a Workers'
Compensation Board, Disability Benefits Bureau, Albany,
New York 12241.
IMPORTANTE: Antes de p.resentar usted su reclamacion,
as necesario qua su proveedor de safud complete la
declaration dei medico ("Health Care Provider's
Statement") an Is forma de reclamacion, indicando el
periodo de su incapacidad.
4. Usted tiene derecho a ser tratado par cualquier medico,
quiropr'ctico, dentists, enfermera-partera, podiatra o
psieologo Oque usted eli ja. Pero, contrario a Is
compensation obrera, sus cuentas medicas no saran
pagadas a menos que su patron y/o Union proporcione
pago de tales cuentas medicas ba jo un Plan o Convenio
de Beneficios por Incapacidad.
S. Si estuviera listed enfermo o lesionado durante el
tiempo qua este recibiendo beneficios del Seguro de
Desempieo, presente una reciamacion para Beneficios por
Incapacidad, sigulendo las instrucciones arriba descritas,
tan pronto Como sufra Is lesion o Is enfermedad.
6. Si usted este desempleado por mess de siete dias, su
patron est' obligado mandarle a usted Is Declaration de.
Derechos de Beneficios por Incapacidad (Form DB -2711.
7. Otras informaclones relativas a Beneficios por
Incapacidad pueden obtenerse escribiendo o Ilamando a
la oficina mds cercaria de la -Junta de Compensation Obrera.
Hempstead,
emp 14203 -State Office Bldg. - 125 Main St. - (716) 847-3178
Hemp
stt ead, 11550 - 175 Fulton Avenue - (516) 560-7745
New York City, 11248-0005 - 180 Livingston St - Brooklyn - (718) 802-6964
Rochester, 14614 - 130 Main Street West - (716) 238-8300 ROBERT R. SNASHALL
Syracuse, 13202 - State Office Bldg. - East Washington St. - (315) 428-4465 Chairman (Presidente)
The undersigned employer is in compliance with the provisions of the Disability Benefits Law IEI patrdn abajo firmante
est' an conformidad con las disposiciones de Is Ley de Beneficios por Incapacidad).
Disability Benefits, when due, will be paid by (Los Beneficios por incapacidad, cuando debidos, ser'in pagados por):
THE STATE INSURANCE FUND
199 Church Street, New York, NY 10007 The benefits provided are (Los beneficios provistos son)
(2 12) 312-9000
$ Statutory Under a Plan or Agreement
? (Estatutarios) (Bajo un Plan o Convenio)
Class(es� of employees covered (Clase(s) de empleados amparados)
Effective: From 3,/..23 f..91]..,......... To.cancellation ....................... .
(En Vigor Desde) (Rasta}
Policy No.. DBL.............2459....5.6=9...................................
(i'allza No.)
THE WORKERS' COMPENSATION BOARD EMPLOYS AND SERVES
PEOPLE WITH DISABILITIES WITHOUT DISCRIMINATION.
LA JUNTA DE COMPENSACION OBRERA EMPLEA Y SIRVE A
PERSONAS iNCAPACITADAS SIN DISTINCION
Prescribed by Chair
DB -120 16-95) Workers' Compansgion Board
Stale of New Yor6
unro4nraan
Name of employer (Nombre del patr6n)
anmff,Tme, a, a, •Wsl
THIS NOTICE MUST BE POSTED CONSPICUOUSLY IN AND
ABOUT THE EMPLOYER'S PLACE OR PLACES OF BUSINESS.
THE STATE INSURANCE FUND
199 CHURCH STREET NEW YORK, N.Y. 10007
(212) 312-7276
CERTIFICATE OF WORKERS' COMPENSATION INSURANCE
HUDSON CANYON CONSTRUCTION INC
115 DEVRIES AVE
NORTH TARRYTOWN NY 10591
POLICY NUMBER
927 897 -9 -
DATE
6/24/97
981-362
PERIOD COVERED BY THIS CERTIFICATE
6/29/96 TO 6/29/98
POLICYHOLDER CERTIFICATE HOLDER
HUDSON CANYON CONSTRUCTION INC TOWN OF WAPPINGER
115 DEVRIES AVE 20 MIDDLE BUSH ROAD
NORTH TARRYTOWN NY 10591 WAPPINGERS FALLS NY 12590
U-26.3
THIS IS TO CERTIFY THAT THE POLICYHOLDER NAMED ABOVE IS INSURED WITH THE STA'T'E
INSURANCE FUND UNDER POLICY NO. 927 897-9 UNTIL 6/29/98 ,. COVERING THE ENTIRE
OBLIGATION OF THIS POLICYHOLDER FOR WORKERS' COMPENSATION UNDER THE NEW YORK WORK-
ERS' COMPENSATION LAW WITH RESPECT TO ALL OPERATIONS IN THE STATE OF NEW YORK,
AND, WITH RESPECT TO OPERATIONS OUTSIDE OF NEW YORK, TO THE POLICYHOLDER'S REGULAR
NEW YORK STATE EMPLOYEES ONLY, EXCEPT AS INDICATED BELOW.
IF SAID POLICY IS CANCELLED, OR CHANGED PRIOR TO 6/29/98 IN SUCH MANNER AS
TO AFFECT THIS CERTIFICATE, 5 DAYS WRITTEN NOTICE OF SUCH CANCELLATION
WILL BE GIVEN TO THE CERTIFICATE BOLDER ABOVE. NOTICE BY REGULAR MAIL SO
ADDRESSED SHALL BE SUFFICIENT COMPLIANCE WITH THIS PROVISION. THE STATE INSURANCE
FUND DOES NOT ASSUME ANY LIABILITY IN THE EVENT OF FAILURE TO GIVE SUCH NOTICE.
THIS CERTIFICATE DOES NOT APPLY TO BUILDING DEMOLITION.
THE STAM I SURAN E FUND
W. C
HER TJACOBS
DIRECTOR, INSU ANCE FUND UNDERWRITING
PAGGI & MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAX)
June 20, 1997
Hudson Canyon Construction
115 Devries Avenue
North Tarrytown, New York 10591
Attention: Mitch Berkey, P.E.
Reference: Castlepoint Landfill Closure Project
Dear Contractor:
RECEIVED
J U N 2 3 1997
ELAINE SNOWDEN
TOWN CL"K
Please be advised that Bids for the Castlepoint Landfill Closure Project
were received and opened on May 27, 1997. The results of said Bid
were as follows:
CONTRACTOR
BID AMOUNT
Hudson Canyon Construction
$
444,008.00
Sun Up Enterprises, Inc.
$
458,128.00
Nenni Equipment Corp.
$
460,000.00
RGH Construction, Inc.
$
462,986.00
L.J. Construction, Inc.
$
481,905.00
Blacktop Maintenance Corp.
$
482,354.00
This office has reviewed all Bids and find them to be mathematically
correct and in the proper format.
At their June 16, 1997 meeting, the Wappinger Town Board authorized
award of the Contract to Hudson Canyon Construction, Inc. for their bid
amount of $444,008.00.
Please provide the Town Attorney's office with the necessary insurance
and Performance Bond paperwork. Upon approval of said paperwork,
will contact you to schedule a Contract signing date. The Town Attorney
is:
Albert P. Roberts, Esq.
c/o Vergilis, Stenger, Roberts & Pergament
1611 Route 9
Wappingers Falls, New York 12590
Joseph E. Pao, Jr., P.E. Ernst Martin, Jr., PE,, LS, � pnnred pn recycled paper
Mitch Berkey - 2 - June 20, 1997
RE: Castlepoint Landfill
If you have any questions or comments, please feel free to contact this
office.
Thank you for your consideration in this matter.
Very truly yours,
4� (�) /4/0
Peter J. Paggi
PJP:Iaw
cc: Hon. Constance O. Smith, Supervisor
Han. June Visconti, Councilperson
Hon. Vincent Bettina, Councilperson
Hon. Joseph Ruggiero, Councilperson
Hon. Robert Valdati, Councilperson
Albert P. Roberts, Esq.
Elaine Snowden
W
P4'
O
m
O
a
U
a
a
H
H
z
H
O
Ad
W
A
H
W
U
W
o
O
0—
0—
0—
Or
O
o
0
o
O
o
0
0
o
O-
oU
O�
o
o
O
o
0
0
0
0
aU
p,
o
O
O
a► .
M•
o
o
O
0
0
0
o
v�
H z
o
0
m U
kD n
N En
O Ln
cr
O
O
O
O
ON
to
G4 W
0)
0)
o
co m
a)�
m n
n
an
m
m
of
m
U H
.
-o
,L
-
-
,
.
O
m
Ln
n
N
rl
d'
N
ON
N
N
H
H
al
al A
o
m
N
co
CO =
M
ri trr
r-4,0
d�
;i
O
O
O
o�
OO
O
O
O
O
O
O
O
O
0
O
O y+
o '>1
O >*4
O
O
O
O
O
O
O
O
H
O.
0mLn
•U
o
w
int
o0
0
o
O
o
0
0
e
ha
to
o
�m
0d�
r-0
�D0
0
o
O
o
0
0
0►
\
.
,
a E4
(n
O
N •
M M
00 •
MO
Lf)
N
tf)
N
to
Ul
71
to
r -I
N
to kD
00 r -I
to N
O
H
z
r -I r -I
H V}
ko
qp
Vih
Vrr
irks
V)- —
0-
V)-
V)-
{J}
[/i
Vi
i).
O
O
O
O.
0—
O
O
O
O
O
O
0
O
O
HO
o
O ,til
O U0
y+
O
O
O
O
O
0
0
O
U
o
O to
o-,
0
0
0
0
0
o
to
O
O
O
ri \
Ict C l
00 �
00
O
Ln
O
O
O
O
In
004
LO
111
r-4
Nv m
0 m
co
to
O
O
Ln
O
01
0 H
-
►al
. .
.N
a
N
O
M
In
Lf)
Lf)
N
N
z
r -I
tf) 111
la H
n m
O
N
10
O
r� H
r -I Vr
11 t
O
O
O
O
O
O
O
O
E+
Z
0
0
0>l
OU
0>4
o
0
0
o
O
O
o
0
94
H W
o
Lr
oU
Ing
0tt7
0�
o
a
o
0
0
0
0
O
1xpw
O
N
o�
NUl
t f)\
00
o
O
O
O
O
O
o
H
riWPi
U)
Cl
wO
ON
in
w
O
O
O
O
O
111
O
C1
W H O
-
• o
• (n
. .
z O U
o
111 •
r4 M
r-
00 o
M
r -I
0)
00
lD
o
d
r -I
r) Kr
o r -I
n (1
111
Ei
%1
r -I H
rii/i
to
0
Vr
111-
th
th
th
V).
W
O
O
O
O .-.
O
O
O
o
O
O
O
O
o
W
O
O
O >4
O y4
O >4
O rte'
O
O
O
O
O
O
o
m
.0
W H
o
n
rl U
co
o w
0--
0
0
O
0
0
0
ao
D fYi
O
O
qC;p
N d
0�
00
O
111
O
O
LO
O
N
W U
%D
Kr
to m
tl- v
kD 0
w 0
0
kD
O
►►ss
g4 z
.
.
. r -j
. .
.0)
.
.
.
.
-
W H
to
n
n -
to H
H •
N O
C1
r -I
O
N
Op
W H
i
r-4'dr
rl
Ill ra
a) M
ri O
r-4
r I
ton*
Wr
-I H
0.
co
qr
t>
O
O
o
00•
O
o
O
o
0
0
0
0
0
H
O
o
O JI
O ,til
0 yi
O Q'
O
0
O
O
o
0
0
[i.
W
U U
O
0
96
O U
Ln to
0.
cn
0
O
4
O
O
ao
r7
d'
"r
N-�
m
N\
00
Kr
00
N
d'
O
O
O
z 04
M
tiff
ch H
M O
n M
00
r)
Hrl
p
to
O
O
O H
.
.aN
.nm
,
.
to W
H
Ill
d` •
1D •
00 •
d' Ul
00
N
1D
(1
r I
H
V'
D
HH�
n r r
r -I
N
.-+
O
H H
co
IV
pC U
yr
trr
VY -
trr
V)--
u}—
V).
yr
yr
v}
trr
V)-
91-
}z
z
z
u
u En
z
H --
H -.
en
°
w
o
o1
���
H4
�
u >+
U) >+
W
H
p
a
0
H
M..
I.
N U
o EA
w
a
w
3
0+
w
m
1U��
z
C7
UU
00O
E o
.-,
U
A
3
I
I
Ea -4
I
p4
U H-4
1
10
p., O
10
I
I m
O
1 n
1s1
W
ri On
A N
r4 n
H-
ri
A
ri to
ri V]
A to
O m
O w
O m
E-+
o�
Oa
O-
0 c
0(n
0lD
o
O
0
V
•
•
N
•a
•a
•a
oa
4a
4a
NOTICE OF AWARD
DATED: Friday June 20, 1997
TO: Hudson Canyon Construction Inc. Fax #_(914) 631-5652
(BIDDER)
OWNER'S PROJECT NO. 86-003(14)
PROJECT: Castlepoint Landfill Closure
OWNER'S CONTRACT NO. 1 of 1
CONTRACTFOR: Construction of an earthen capping system and associated
pp
a utenances at the Castlepoint Lan .
------------------- ------------------------------------------------
YOU ARE NOTIFIED THAT YOUR BID DATED Play 27, 1997 FOR THE ABOVE
CONTRACT HAS BEEN CONSIDERED. YOU ARE THE APPARENT SUCCESSFUL BIDDER AND HAVE BEEN
AWARDED A CONTRACT FOR: Castlepoint Landfill Closure
(INDICATE TOTAL WORK, ALTERNATES OR SECTIONS OF WORK AWARDED)
THE CONTRACT PRICE FOR YOUR CONTRACT IS
eight and no/100
Four hundred forty four thousand
DOLLARS ($ 444,008.00
YOU MUST COMPLY WITH THE FOLLOWING CONDITIONS PRECEDENT WITHIN FOURTEEN (14) DAYS OF
THE DATE OF THIS NOTICE OF AWARD, THAT IS BY _ Ju 1 y 4, 19 9 7
I. YOU MUST DELIVER THE CONTRACT SECURITY (BONDS) PRIOR TO THE CONTRACT
AGREEMENT EXECUTION AS SPECIFIED IN THE INSTRUMON TO BIDDERS A 3 GENERAL
PROVISIONS. **Send inurance and bonding info to Town A orney s
office for approval prior to Contract signing date.
2. OBTAIN THE NECESSARY INSURANCE AS SPECIFIED IN THE INFORMATION TO BIDDERS
AND SUBMIT INSURANCE CERTIFICATES.
3. YOU MUST MAKE YOURSELF AVAILABLE TO EXECUTE THE CONTRACT AGREEMENT AT A
LOCATION TO BE NAMED BY THE OWNER IN A TIMELY FASHION.
FAILURE TO COMPLY WITH THESE CONDITIONS WITHIN THE TIME SPECIFIED WILL ENTITLE OWNER TO
CONSIDER YOUR BID ABANDONED, TO ANNUL THIS NOTICE OF AWARD AND TO DECLARE YOUR BID
SECURITY FORFEITED.
BY:
NOA - 1
PAGGI & MARTIN
Consulting Engineers & Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905(FAX)
May 27, 1997
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance O. Smith, Supervisor
Reference: Castlepoint Landfill Closure Project
Dear Supervisor Smith & Board Members:
Rec,c/ Vel)
t1AY30 1997
E4A1NE S
rowiv cLeftEti
Please be advised that Bids for the Castlepoint Landfill Closure Project
were received and opened on May 27, 1997. The results of said Bid
were as follows:
CONTRACTOR
BID AMOUNT
Hudson Canyon Construction
$
444,008.00
Sun Up Enterprises, Inc.
$
458,128.00
Nenni Equipment Corp.
$
460,000.00
RGH Construction, Inc.
$
462,986.00
L.J. Construction, Inc.
$
481,905.00
Blacktop Maintenance Corp.
$
482,354.00
This office has reviewed all Bids and find them to be mathematically
correct and in the proper format.
This office has also contacted three separate engineering firms listed as
references for Hudson Canyon, Inc., and received satisfactory
recommendations.
Please note that Hudson Canyon's low bid of $444,008.00 represents a
decrease of $45,688.00 from their previous low bid of $489,696.00 for
the first round of Bids opened on April 25, 1997.
We would recommend that, subsequent to the completion of all Town
funding requirements, the Town award the Contract to Hudson Canyon
Construction, Inc, for the Bid amount of $444,008.00.
Joseph E. paggi, Jr., P.E. Ernst Martin, Jr., EE., L.S. W punred on recycled paper
000
btwi M
x H
H t't
x tid
00
dH
Hy
—H
, H
H
—W
. N
^ V
-. M
.. to
W
.--. N
4l Y
rN
t -'Y
r0
r•
L�•
C•
F'•
N
I •
tip•
t7-' -
•
n
•
o
o
o
0')o
W
w
- o
o
O
H
N
- H
JM
fnY
b7H
x
0
+A
$.•
J 1
0
td r
y
0110
01
�. r
H n
�po1
r
r
oy
oo
rn
b
C
nn
�d
W O
n H
H
H
r
C
y
n
;��
0
H
V
'=i
W
r0
trJ
In
m
Va
O
H
v
z
H
n
z
z
y
in
in
in
in
to
to
-n
.� {n
-n
r {n
—4j)-
-En
4A
c� x
,P
00
0 C3
A
N
SI
xty
A
I •
I '
w
N
00
to �P
00
01
+P
Ul
F-'
MOO
. .
w•
J-
tip.
-
I
H O
0
o
to
•P
w
Y
w
cc
cn J
o In
N tip
m
w
W!9
O
O
O
.P
N
00
4N.
00
� N
--,o
\ N
rP
PP
CZ
0o
0
0
w
0
o
w
0
cn to
n 0
n •l
o
o
on1-3
O
O
O
O
O
O
O
�O
f<0
SCO
H
0
0
C
0
0
0
o
0•
a
0
0
0
o
v
.�
..
zO
x
A
co
4A. H
F, H
x
to
F t
H
o F-'
�- tip
H Ul
a w
H m
a}
N
O
w
•P
F'
W
ON
F-'
h-`41
J
J
�
HL=J�
Y
N
J
N
O
m
Ul
O W
001
PJ
tioa)
P
0)
iib
N
O
Ul
O
O
Ul
O
O O
-- Ul
.P N
— P
O
O
Cy
ao
0
0
0
0
0
0
0
rn0
m
n
J
o
Hb
0
0
0
0
0
0
0
yo
rCo
�o
�Co
0
o
rti
d
O
O
0
O
O
O
0
O
—0
O
O
O
V]
to
to
4f).
-Ul
411
{n
4A
• . -Ul
.-, -U�
.-. 4n
.-, {n
-(a
-Ln
x
A
Ul
{n r-
r �-j
t+i
H
Ij
In
wJ
O
w
F'
10
o
rn
00
do
F'
w
o w
e
w F}
Ln,
cc
0 C: z
o
C]
o
to
o
0
0
0
0
000
0 ul
N in
o w
w
to
0 Id
HO
O
0
O
O
O
0
0
00
�Ui
UlN
�O
N
O
pd
a
o
0
0
0
0
0
0
to o--
to
n o
to
0
. to H
:0
ea
H
0
0
o
O
a
o
o
y
r�0
KO
rCo
0
o
0
0
0
0
0
o
a
• o
0
0
0
to
in
to
-Ln
{n
in
A
to
to I--'
H F'
0
m
N
O
w -1
H 01
In to
w
x
N
N
to
Ul
Ul
W
O W
• J
N WrP
Ul
N
w
N.
-
O.
H
%D
O
UY
O
O
J
lil
O O
00 O
ti0 &P
Ul �l
Ul
Ul
0:9
co
O
O
O
O
Ul
O
O O
-� 00
W �P
p
0
O
C
1—o
rn o
tr
o
o
0
t1j.
n.
r3
O
O
O
O
0
O
O
>0
FCo
i<o
SCO
O
O
H
O
O
O
O
O
O
O
• O
• O
—0
O
0
O
v
v
x
iR
�J1
iI>
Vn
4!i
in
in
^ 41h
^ if?
4n
dl?4U1
{!r
O
F�
F� H
x
co
F-'
O
N UI
W co
Ql 61
N
F A
fly
Y
Ul
Ul
N
Ul
N
Vf
ow
• 00
W W
N
O
w
H N
-
I
-
I
I
. -
(Jj-
. -
v.
I�J
•
%D
0
0
0
0
o
a
o 0)
o f
IP to
UlJ�-
o
Ln
C 4
O
O
O
O
O
O
O
00
-�Ul
00o
�v
O
O
0.
Ul
o
0
0
0
0
0
�o
mo
�o
nvl
0
o
H
a
o
0
0
0
o
O
�o
rGo
.Co
+Co
0
o
O
0
0
0
0
0
0
0
0•
o
--o
0
0
o
x
-U).
4A
-V).
-M
4j>
4A
.-. JLI�
. �n
—{n
—4.n
V.,
{n
0
ah
tP
P F}
{n H
tip
w
m
N
tD
O
H tip
• tip
H
H ty
N
N
to
N
w v
Ul m
.P m
Q m
to
0
x
M-
o-
1
1►3
f]
W
.P
l0
tip
ti0
O
J
J 10
I- tip
w 00
O
w
ti0
th
tr
tin
o
0
0
0
4�-
too
MN
�lrn
nW
a
0
z
A
O
O
O
O
O
0
-0
• to
X
O
O
O
O
O
O
O
O
O
O
O
,b0
O
Ko
O
O
O
0
0
0
O
0
0
0
0
—0
—0
—0
—0
0
0
tii
000
btwi M
x H
H t't
x tid
00
dH
Hy
PAGGI & MARTIN
Consulting Engineers &Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAQ
April 28, 1997
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance 0. Smith, Supervisor
Reference: Castlepoint Landfill Closure
Bid Results
Dear Supervisor Smith & Board Members:
Please be advised that Bids for the Castlepoint Landfill Closure were received
and opened on April 25, 1997. The results of said Bid were as follows:
CONTRACTOR
BID AMOUNT
Hudson Canyon Construction
$
489,696.00
Blacktop Maintenance Corp.
$
504,890.00
RGH Construction, Inc.
$
534,000.00
Grace Industries, Inc.
$
539,050.00
Sun Up Enterprises, Inc.
$
558,750.00
L.J. Construction
$
571,112.00
Alexandra Development Corp.
$
671.,070.00
Metzger Construction and
$
693,920.00
Amenia Construction Corp.
HCS Excavating, Inc.
$1,137,830.00
There was also a Bid submitted by Nenni Equipment Corp. in the amount of
$465,225.00. However, this Bid was submitted to the Town Clerk's Office
at 10:49 AM. The Project Specifications state that ail Bids must be received.
by 10:45 AM. The Contractor was informed at the time of submission that
his Bid was late.
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.R., L.S. Pnnred on recycled paper
Constance O. Smith - 2 - April 28, 1997
RE: Castlepoint Landfill
Additionally, at the time of opening, I informed the Contractor and the
audience that we would open the Bid, but that it would be subject to
determination by the Town Attorney as to acceptability. As per a subsequent
telephone conversation with the Town Attorney's Office, Mr. Roberts stated
that the Bid was received after the deadline specifically outlined in the
specifications, and as such was disqualified.
Please note that a $35,000.00 certified check submitted as a Bid Security
was returned to Amenia Construction immediately following the Bid opening.
This office has reviewed all Bids and find them to be in the proper format.
With the exception of a few minor errors that do not affect the Bid results, all
Bids are mathematically correct. The low Bidder's unit prices appear to be
balanced with no anomalies.
We would ask that the Town Board discuss the matter at its earliest
convenience. Please keep in mind that the Bid prices are valid for a period of
forty-five (45) days after the date of opening, or until June 9, 1997.
If you have any question or comments, please feel free to contact this office.
Thank you for your consideration in this matter.
Very truly yours,
Peter J.k'7�)
PJP:Iaw
cc: Hon. June Visconti, Councilperson
Hon. Vincent Bettina, Councilperson
Hon. Joseph Ruggiero, Councilpersaon
Hon. Robert Valdati, Councilperson
Albert P. Roberts, Esq.
Elaine Snowden
I
Ln
43
U)
�9
�
8
�1
M
Q
otnN
tnUU
zj
g
8_
,,-j�
o. LA
�3
LO
^T
O.
�9
�T.M
a(iY
N
M
M
i
J-
til
cn
O
M
9
In
=9
in 0
N
k
h f
M
W
0
p
0
_ �
V '
o�
�,�
ar'�
►'�
�n0,
r�
cY �
MN
NM
Mcr
on
J
Ln
w
I_ W
d
2