2024-1422024-142
The Increase and Improvement of Facilities of Mid -Point Park Sewer District in the Town
of Wappinger, Dutchess County, New York
At a Regular Meeting of the Town Board of the Town of Wappinger, Dutchess County,
New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on June 10,
2024.
The meeting was called to order by Joseph D. Cavaccini, Town Supervisor, and upon roll
being called, the following was recorded:
✓ Vote Record - Resolution RES -2024-142
Yes/Aye
No/Nay
Abstain
Absent
2 Adopted
❑ Adopted as Amended
Joseph D. Cavaccini
Mover
Q
❑
❑
❑
❑ Defeated
William H. Beale
Voter
Q
❑
❑
❑
❑ Tabled
Angela Bettina
Voter
❑
❑
❑
Q
❑ Withdrawn
Christopher Phillips
Mover
Q
❑
❑
❑
Al Casella
Seconder
Q
❑
❑
❑
The following Resolution was introduced by Supervisor Cavaccini and seconded by
Casella.
In the Matter of The Increase and Improvement PUBLIC INTEREST ORDER
of Facilities of Mid -Point Park Sewer District in
the Town of Wappinger, Dutchess County, New
York
WHEREAS, the Town Board of the Town of Wappinger, Dutchess County, New York,
has duly caused to be prepared a map, plan and report including an estimate of cost, pursuant to
Section 202-b of the Town Law, relating to the proposed increase and improvement of the
facilities of Mid -Point Park Sewer District, in the Town of Wappinger, Dutchess County, New
York, consisting of the construction of a new wastewater treatment plant at the existing plant
site, located at 63 Martin Drive, in Wappinger Falls, New York, together with improvements to
the sewer collection system, including original furnishings, equipment, machinery, apparatus,
appurtenances, and incidental improvements and expenses in connection therewith as applicable,
at a maximum estimated cost of $10,116,000; and
WHEREAS, at a meeting of said Town Board duly called and held on May 13, 2024, an
Order was duly adopted by it and entered in the minutes specifying the said Town Board would
meet to consider the increase and improvement of facilities of Mid -Point Park Sewer District in
said Town at a maximum estimated cost of $10,116,000, and to hear all persons interested in the
subject thereof concerning the same at the Town Hall, in Wappinger Falls, New York, in said
Town, on June 10, 2024, at 7:00 o'clock P.M., Prevailing Time; and
WHEREAS, said Order duly certified by the Town Clerk was duly published and posted
as required by law; and
WHEREAS, a public hearing was duly held at the time and place set forth in said notice,
at which all persons desiring to be heard were duly heard; NOW, THEREFORE, BE IT
ORDERED, by the Town Board of the Town of Wappinger, Dutchess County, New
York, as follows:
Section 1. Upon the evidence given at the aforesaid public hearing, it is hereby found
and determined that it is in the public interest to make the increase and improvement of the
facilities of Mid -Point Park Sewer District, in the Town of Wappinger, Dutchess County, New
York, consisting of the construction of a new wastewater treatment plant at the existing plant
site, located at 63 Martin Drive, in Wappinger Falls, New York, together with improvements to
the sewer collection system, including original furnishings, equipment, machinery, apparatus,
appurtenances, and incidental improvements and expenses in connection therewith as applicable,
at a maximum estimated cost of $10,116,000.
Section 2. This Order shall take effect immediately.
The foregoing was put to a vote which resulted as follows:
RESULT: ADOPTED [UNANIMOUS]
MOVER: Joseph D. Cavaccini, Christopher Phillips
SECONDER: Al Casella, Councilman
AYES: Joseph D. Cavaccini, William H. Beale, Christopher Phillips, Al Casella
ABSENT: Angela Bettina
Dated: Wappingers Falls, New York
6/10/2024
The Resolution is hereby duly declared Adopted.
JOS J4 P. PAOLONI, TOWN CLERK