2024-2012024-201
Schedule Special Town Board Budget Meeting for November 7, 2024
At a Regular Meeting of the Town Board of the Town of Wappinger, Dutchess County,
New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on October
28, 2024.
The meeting was called to order by Joseph D. Cavaccini, Town Supervisor, and upon roll
being called, the following was recorded:
✓ Vote Record - Resolution RES -2024-201
ADOPTED [UNANIMOUS]
MOVER:
William H. Beale, Councilman
SECONDER:
Christopher Phillips, Councilman
AYES:
Cavaccini, Beale, Bettina, Phillips, Casella
Yes/Aye
No/Nay
Abstain
Absent
Q Adopted
❑ Adopted as Amended
Joseph D. Cavaccini
Voter
Q
❑
❑
❑
❑ Defeated
William H. Beale
Mover
Q
❑
❑
❑
❑ Tabled
Angela Bettina
Voter
Q
❑
❑
❑
❑ Withdrawn
Christopher Phillips
Seconder
Q
❑
❑
❑
Al Casella
Voter
Q
❑
❑
❑
The following Resolution was introduced by Councilman Beale and seconded by
Councilman Phillips.
WHEREAS, the Town Board needs to schedule a Special Town Board Meeting on
Thursday, November 7, 2024, starting at 7:00 PM; and
WHEREAS, the meeting shall be open to the public in accordance with applicable State
laws.
NOW, THEREFORE, BE IT RESOLVED, the Town Board hereby authorizes the
Town Clerk to post this resolution on the Town Bulletin Board.
The foregoing was put to a vote which resulted as follows
RESULT:
ADOPTED [UNANIMOUS]
MOVER:
William H. Beale, Councilman
SECONDER:
Christopher Phillips, Councilman
AYES:
Cavaccini, Beale, Bettina, Phillips, Casella
Dated: Wappingers Falls, New York
10/28/2024
The Resolution is hereby duly declared Adopted.
JOSEP,H,P. PAOLONI, TOWN CLERK
(0onco Construction Group, hic.
12 •i' «•• Avenue,
Yonkers NY 10704
(415) 309 5019 (914)356 4443
Q;L QGFR0LJP050 GIMAIL-COM
RE: Town of Wappingers Boat Ramp Rehabilitation and
Repair
Dear Sirs;
Conco Construction Group, Inc. will provide construction
services to the client and its designated representatives
regard'ing the Rehabilitation and Repair regarding Town of
Wappingers Boat Ramp.
Conco, Construction Group, Inc. will provide Professional
Engineering services to the client in respect to this project.
These tasks may include, but not be limited to; any tasks
authorized by the client having the purpose of evaluating
records, data and reports engineering drawings others
regarding the above referenced site. The Conco,
Construction Group, Inc. shall pertain only to the services
necessary to assist the Client, and shall not include legal
advice or representation of the Client in any legal form or
matter.
CONCRETE BOAT RAMP REPAIR
* Existing boat ramp to be cleaned and prepped for repair.
Contractor will provide any needed protection for boat ramp and adjacent areas
during repair work,
Form on existing slab to accept a 5 inch topping. Approximately 5 inches of quick
drying concrete with integral fiber added at the cement plant for structural
reinforcement. Concrete to be 5000 PSI mix with added fiberglass
reinforcement,
Rebar and metal mesh will not be employed beyond that needed to secure
attachment of the current ramp to the repair layer. Rebar is minimized because
of risk of rear metal depredation and delamination of the two layers. The
Contractor will drill existing slab and install 1/2 metal galvanized dowels into
existing concrete( dowels will be installed approximately 3 to 4 inches into the
concrete , concrete epoxy will be used to secure them) a pattern of rows space
12 inches and dowels to be 12 inches on center.
Thickener will be formed around the edge of the ramp.(this will be done to help
D
control any additional erosion.)
' neuro cut road and dig down 5 inches to allow conqrqAd%ig.rqa d with a
smooth transition.
• All concrete to be broom fnished for a rough surface texture.
• Contractor will supply all materials and labor to complete the job as specified.
• Contractor will keep site clean and safe from the public.
• Contractor will remove all trash created by job upon completion of the project.
• Contractor will protect all areas where the public could potentially come in contact
with the project site and equipment used for this project.
' Contractor will provide all necessary insurances as designated by the Town with
the client properly designated as additional insured prior to any work beginning.
The work proposed is designated as ,"repairs". No permits are required if designated
solely to the original size dimensions and configuration. Note that if the client seeks
enlargement of other alterations, on confirming with the appropriate agencies permits
and drawings and meetings with appropriate agencies may become necessary at an
additional fee of the Professional Engineer.
$198,000.00 total price of job
Payment Schedules is as follows
$50,000.00 deposit for material, as material and
equipment is mobilized at the site, payment for goods
and services will be based on the delivery cost plus a
10 percent management feel.
On completion of the project, the client will sign a letter
of acceptance of the work as complete and to the
satisfaction of the client, at which time the net owed on
the project will be due and payable.
It is mutually agreed by all parties that Conco Construction
Group, Inc. has been engaged by the client as their
independent contractor for this project, and that Conco
Construction Group, Inc. is obligated by contract may. to
the client noted above. There is no contractual or other
obligations to any other consultants or representatives the
client has engaged in respect to this project. There are no
third party rights or benefits conferred under this project or
work products of Conco Construction Group, Inc. Our
work or opinions are strictly limited to the client; the only
party to whom Conco Construction Group, Inc. intends to
confer any rights.
Conco Construction Group, Inc. shall charge and bill the
Client for services in accordance with the attached Billing
Policy. The Client agrees to the terms and conditions of
the Billing Policy. Client agrees to pay for all services
rendered promptly on receipt of the statement, payment
delays will be considered only.on written acceptance by
both parties. The client agrees to be fully responsible for
all invoices submitted and that although the client may be
seeking reimbursement for fees from third party sources,
the client accepts the condition that Conco Construction
Group, Inc. will seek reimbursement only from the client.
Conco Construction Group, Inc. does not agree or accept
any adjustment or delay in payment of our fees as a
condition of third party agreements to reimburse the client
or reviews by third parties not a part of this agreement. In
the event that additional work is required, we assume this
request shall be written and accommodated at the
reasonable and standard cost.
A retainer fee of for these services shall be due prior
to the start of the project. A fee of $ for these services
shall be due on completion of the project. Invoices are
due and payable on receipt.
Please sign each copy of the Agreement and submit the
appropriate retainer. Work shall commence on
acceptance of this agreement by both parties.
Sincerely,
Conco Construction Group, Inc.
Conor Flynn
President
AGREED AND ACCEPTED
By: _
Date:
acknowledged:
Conco Construction Groups Inc.
By:
0
—1 1—
Conco Construction Group, Inc. BELLING POLICY AND CONDITIONS
CHARGES
Charges for employees of Conco Construction Group, Inc. shall be computed at the hourly billing rates
attached hereto. Conco Construction Group, Inc. invoices may include charges for services performed by
any staff' member directly relating to the Client's project. This includes professional and support staff.
Time spent on the Clienf's project shall be billed at the minimum unit of no less than ten minute
increments unless agreed to in writing by Conco Construction Group, Inc. All time spent by employees of
Conco Construction Group, Inc.t raveling, when the travel is in the interest of the work being performed,
shall be charged at the employee's hourly billing rata
Specialized equipment used during the course of the Clients project will be billed at the rates specified in
Exhibit A if attached. Charges for specialized equipment are based on a daily rental rate as the minimum
period of time. Rental includes all time in which the equipment is in actual use or for the period of time
which the equipment is away from the premises of Conco Construction Group, Inc.for the intent of being
used on the Cjient's project.
All expenses incurred by Conco Construction Group, Inc. for services, equipment, supplies and out of
pocket expenses in providing the services of the project shall be billed at their actual cost. These
expenses may include, but are not limited to: postage, express parcel services, lodging, food,
transportation, off premise living expenses, reproduction costs, long distance communication, third party
equipment rentals, disposable and miscellaneous supplies, and other costs incurred during the course of
performing the Client's project. Subcontractor charges shall be due and payable prior to the
subcontractor performing their service. Laboratory fees shall he due and payable to the laboratory on
collection of the sample and prior to submission to the laboratory. Samples will not be submitted to the
laboratory without receipt of payment. Billing rates are subject to change on 30 days written notification
by Conco Construction Group, Inc.
INVOICING
Invoices for all charges identified above shall be issued every 30 days or on completion of the work.
Invoices are due and payable on receipt. Client agrees to pay for all services rendered promptly on
receipt of the statement. If the services performed constitute services subcontracted by the Client to
Conco Construction Group, Ine.as part of the Client's obligation to provide services to another contraottng
entity, the Client agrees not to impose any other contract or payment agreements or obligations on to this
contract for services without Conco Construction Group, Inc, consent; nor, shall the Client withhold
payment until such time that their Cjjent reimburses them or authorizes {payment. If the services
performed constitute services potentially reimbursable under the conditions of the Client's insurance
policy(s), the Client agrees not to impose any other contract or payment agreements, insurance
deductibles, reduce our invoice rased on the Client's insurance company conditions or policies or
obligations. The Client agrees not to withhold payment until such time that the Client is reimbursed by
their insurance company or authorizes payments.
Should the Client require clarification of any charges, the Client agrees to notify Conco Construction
Group, Inc.within 15 days in writing of receipt of monthly statement detailing the specific charge(s) in
question. Failure to so notify signifies total acceptance and responsibility for prompt payment in full of the
account. Payment of the invoice shall not be withheld for any reasons, even should the Client request
clarification of specific charges on the current month's invoice. Charges which are agreed as requiring
adjustment shall be credited to the next months invoice for services. If the invoice is the final invoice, the
Client will be promptly reimbursed any funds overpaid.
Charges billed, but not paid within 30 days will be considered delinquent and subject to finance charges.
The FINANCE CHARGE is computed by a periodic rate of 1.5% per month which is an ANNUAL
PERCENTAGE RATE OF 18% applied to the "Previous Unpaid Balance less Current Credits". The
minimum payment due will be payment of Client's indebtedness in full. Payment after 30 days will be
applied first to accrued interest and the balance to the unpaid principle of the invoice. Unpaid invoices
shall result in the immediate cessation of a[[ services rendered by Conoo Construction Group, Inc.
Services will commence work again only on payment of the total amount due by the Client. Work
stoppage caused by non-payment of an invoice shall not be cause for damages or other claims. The time
period between the work stoppage and the date of receipt of the payment shall constitute an automatic
extension of the time of the contract equal to the period of delay in payment. If it becomes necessary to
collect past due accounts, the Client agrees to pay 75% of the collection fees and expenses, including
reasonable collection agency fees, attorney's fees, court costs and other related costs including process
server charges, filing fees, Sheriff fees and Marshall fees.
INDEMNIFICATION
The Client will indemnify, hold harmless, and defend Conco Construction Group, Inc., its officers,
directors, agents and employees from and against any claim, damage, loss, expenses, direct and indirect,
and consequential damages, including but not limited to fees and charges of attorneys and court and
arbitration costs, arising out of or resulting from (1) the Client's negligence or (2) any conditions,
environmental or otherwise, that were in existence or conditions not disclosed before the signing of this
Agreement between the Client and Conco Construction Group, Inc. The Client acknowledges that Conco
Construction Group, Inc. does not provide Professional Engineering services although employees may be
licensed professional engineers.
TERMINATION OF SERVICES
Should the Client request that the project be terminated prior to completion of the agreed on scope of
services, Conco Construction Group, Inc. reserves the right to complete such analysis, paperwork,
reports and records as necessary to close out the project files; to complete any legal or regulatory
compliance activities associated with the performance of our services; and, if necessary, to protect our
professional reputation. A termination charge equal to the charges incurred to closeout the project will be
billed to the Client. These charges shall be the minimum amount necessary to complete the above
referenced work. The client agrees that all files provided to during a project are copies of the client's
original files or property and that the client has retained the originals and any duplicates they need for
their own record any will not request return of the DRE file. Conco Construction Group, Inc.is not
responsible for maintaining client files beyond the period of one year from the date of completion of a
project. If the client requests copies of DRE files and the files are available, the client will be billed at a
minimum of $0.15 per page for normal copies, or the prevailing duplication rate for unique items, plus
labor charges for archive file recovery, examination and archiving, all which is based on file availability.
Conco Construction Group, Inc.reserves the right to waive these charges. The total liability of Conco
Construction Group, IncJs limited to the fees paid to Conco Construction Group, Inc.for the project.
Conco Construction Group, Inc. FEE SCHEDULE
LABOR CHARGED PORTAL TO PORTAL
Services rendered after normal business hours (after 5:00 pm) or weekends (after 5:00 pm Friday
to 9.00am Monday) are subject to a 50 % surcharge. Court appearances full day minimum
charge
Laboratory Analysis Fees laboratory fees Quoted per Project
laboratory fees payable to directly to the laboratory on collectfon of the sample(s)
Equipment Charges Quoted per Project