Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
2024-2182024-218
Resolution To Designate A Portion Of The American Rescue Plan Funds For
Improvements To The Carnwath
At a Regular Meeting of the Town Board of the Town of Wappinger, Dutchess County,
New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on December
9, 2024.
The meeting was called to order by Joseph D. Cavaccini, Town Supervisor, and upon roll
being called, the following was recorded:
✓ Vote Record - Resolution RES -2024-218
Yes/Aye
No/Nay
Abstain
Absent
❑ Adopted
Q Adopted as Amended
Joseph D. Cavaccini
Voter
Q
❑
❑
❑
❑ Defeated
William H. Beale
Mover
Q
❑
❑
❑
❑ Tabled
Angela Bettina
Voter
Q
❑
❑
❑
❑ Withdrawn
Christopher Phillips
Voter
Q
❑
❑
❑
Al Casella
Seconder
Q
❑
❑
❑
The following Resolution was introduced by Councilman Beale and seconded by Casella.
WHEREAS, A scope of work has been developed to perform interior improvements to the Carnwath
Chapel to enable it for public use, and
NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Town Board of the Town of Wappinger
hereby authorizes a payment out of B Fund.
The foregoing was put to a vote which resulted as follows:
RESULT: ADOPTED AS AMENDED [UNANIMOUS]
MOVER: William H. Beale, Councilman
SECONDER: Al Casella, Councilman
AYES: Cavaccini, Beale, Bettina, Phillips, Casella
Dated: Wappingers Falls, New York
12/9/2024
Amended.
The Resolution is hereby duly declared Adopted as
JOSEI,/P. PAOLONI, TOWN CLERK
The Garden Experience Inc
34 tart ave
Poughkeepsie, NY 12603 US
gardenexp84( ?,gmail.com
DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT
Services
Job description for Carnwath
1 6,350.00
6,350.00
Farm Historic Site Chapel.
Material/ Paint description to be
utilized for the job.
Celling and walls reparations,
Painting with Problock latex
primer 1 coat.
2 coats pro Ind Procat Epoxy
eggshell for walls.
2 coat premium celling paint flat
with pro Ind Procat .
Epoxy semi gloss for trims.
Miscellaneous.
Services
Labor, equipment and garbage
1 32,500.00
32,500.00
disposal.
Job performance will consist of
scraping and removal of old
loose paint and loose plaster.
Apply 2 hands of plaster.
Scraping and paintings trims.
Sanding and painting ceiling and
walls.
Services
Flooring; material
1 3,790.00
3,790.00
Plexicoat 1180
Services
Laminated floors
1 3,890.00
3,890.00
Services
Floor trims
1 3,300.00
3,300.00
Services
Flooring labor.
1 26,900.00
26,900.00
Removal of vinyls, and
plywood floors.
Scrape of vinyl glued.
Grind cement slab and Prep for
the plexicoat.
Installation of laminate floors.
Installation of new trims floors.
OTAL 576,730.®0
'SHANK YOU.
Accepted By Accepted Date