Loading...
034 PAGGI,MARTIN &DELBENELLP Consulting Engineers & Land Surveyors 03-1 56 Main Street Poughkeepsie, New York 12601 845-471-7898 845-471-0905 (FAX) N.$'Q :fl',o '~V~ f~. I. ...,. {I} ~y:)) ro.~.~ :1~ .0 ~1\1 ~4'O 'VOQ . 'q~ ~.o. , ~-9k ~J1, ....~ .. A-f'l' '<,., ,~ September 15, 2000 Zvi Segal Z & M Development 1 2 Plaza Drive Wappingers Falls, New York 12590 Reference: Carmel Heights Sewer: Dear Mr. Segal: Enclosed please find a copy of a memo from Michael Tremper of Camo Pollution Control dated September 13th, 2000 regarding the sewer backup at Sherwood Heights. We would ask that you review the memo and call this office to discuss a project schedule of when the recommended work by Camo Pollution Control can be done. This office would like to be present when the line is t.v.'d in conjunction with Camo to determine if any rehabilitative work is necessary. We also recommend that the manholes whose frames have been shifted off the precast concrete be prepared to the satisfaction of our office, Camo's office and the Highway Superintendent's office. We would kindly contact me at your earliest convenience to schedule the above work. ;;P~?:' Joseph E. Paggi, Jr., P.E. JEP:law cc: Hon. Constance O. Smith, Supervisor w/enclosure Hon. vIncent Bettina, Councilman w/enclosure Hon. Joseph Paoloni, Councilman w/enclosure Hon. Joseph Ruggiero, Councilman w/enclosure Hon. Robert Valdati, Councilman w/enclosure Hon. Elaine Snowden w/enclosure Hon. Graham Foster w/enclosure Michael Tremper w/o enclosure Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., 1.8. Charles R. Del Bene, Jr., P.E. POLLUTION CONTROL, INC. ~~-~~~~~~ Operation of Warerand Wastewater Treatment Systems OUR NEW ADDRESS 1610 Rout" 376 Wappi~ger5 fails, ~f{ 12590 (914) 463.7.310 Fax (914) 463.7305 ! MaE.M-O-R.A.N-D-U.M i TO: Joseph E. paggi. Town of Wappinger Engineer Ilr"i' Michael P. Tremper, C~40 pollution Control, Inc. m\ptJ FROM; RE: September 13, 2000 Sewer Backup At Sher~ood Heights DATE: On Tuesday, september 12, 2000, at approximately 9:00 a.m. I received a call from your office indicat.ing that a builder tying into the sewer Main on Sherwood Heiants felt that ehe main was pat:.tially blocked. CAMO Pollutio:1 Control, Inc. personnel responded immediately, and found that the main was partially plugged. Late);: that afternoon, in conjunction with the Town High".;ay Department, the entire area was flushed and cleaned. The following conditions were found and are believed to be the cause of the problem: 1) ConsideJ~able amounts of stone, as large as 211, Clnd other mat.erials were found in each length of sewer line. 2) At least 3, possibly 4, manhole frames had shifted off of the manholes and need to be realigned. 3) It appears that there is very little grade an the sewer main and very little flow movement. S/'(: 'd U;SS')N r'iV6l:0! 0002 'q!'IJe~ . .. Now that the sewer lines have been cleaned, CAMO Pollution Control, Inc. recommends that the manholes be repaired and the entire sewer line 1::e TV'd to determine if there are any problems or other causes which would allow these materials t.o enter the sewer mains. Whereas this line was recently installed by the developer, CAMO .1?o11utiQn Control, Inc. needs clarification of whether it is the developer's responsibility to do further work, or if the responsicility lies with the Town. If you have questions, please do not hesitate to contact me at (845) 463-7310. MPT: dt0771 Rod(ingham 8eW8~' :~,/[: 'd L989'0[-j ~~03: 0 ~ 0002 '9[ 'des