Loading...
035 " PAGGI,MARTIN &DELBENELLP Consulting Engineers & Land Surveyors 035 56 Main Street Poughkeepsie, New York 12601 845-471-7898 845-471-0905 (FAX) ;;'~ ~a., ~ Q('I' ~ t-: "'~~. //) ~ O.~" ,~ ~1- \S'~ '~ ~ ~ O~ f) ~1- ~~10- October 5,2000 New York State Department of Environmental Conservation Division of Solid & Hazardous Materials Bureau of Water Reduction & Recycling, Room 212 50 Wolf Road Albany, New York 12233 Attention: Grace Farrell Environmental Program Specialist Assistance and Technical Outreach Section Reference: Municipal Waste Reduction and Recycling (MWR&R) Program Project No. 30MSWSS-127 Town of Wappinger Recycling Center Dear Ms. Farrell: We are in receipt of your review letter for the above referenced project dated August 25th, 2000. Our response to your comments are as follows: 1. The anticipated material (types and quantities) to be collected are as follows: · Mixed Glass. . . . . . . . . . . . 45.46 Tons/Year · Newsprint.............. 142.33 Tons/Year · Corrugated Paper. . . . . . . . . 18. 75 Tons/Year · Bulk Metal. ............. 215.22 Tons/Year · Tires................... 15.53 Tons/Year · Construction & Demolition Material. . . . . . 551.89 Tons/Year · Mixed Municipal Solid Waste. . . . . . . . .. 272.46 Tons/Year · Leayes/Grass............ Varies by Year · Trees/Limbs/Bmsh....... Varies by Year 2. The proposed facility size and layout was determined by historical usage figures and past experience, based on input obtained from the Town Highway Superintendent and current Recycling Center personnel. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene, Jr., P.E. Ms. Grace Farrell, NYSDEC RE: Project No. 3-MSWSS-I27 - 2 - October 5, 2000 The proposed facility also includes provisions for more bays than currently utilized in order to accommodate anticipated program expansion based on the following: · Expansion of hours of operation. · Expansion of recycling collection, sorting, storage and processing capabilities. · Expansion of compost facilities for residential yard waste. · Increased involvement in recycling programs by making access easier, and · Reduction of elimination of Town wide curb side pickup. 3. It is anticipated that five (5) bays will be used for materials that will be recycled, as follows: . Mixed Glass: 45.46 Tons/Year . Newsprint: 142.33 Tons/Year . Corrugated Paper: 18.75 Tons/Year . Bulk Material: 215.22 Tons/Year . Tires: 15.53 Tons/Year 4. The proposed Recycling Center will have eleven (11) bays. The anticipated allotted usage is as follows: · Reevclables: (Mixed glass, newsprint, corrugated paper, bulk metal, tires) 5 Bays. . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 437.29 Ton/Year · ML"\:ed Municipal Solid Waste 2 Bays. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 272.46 Ton/Year · The remaining four (4) bays would be used to accommodate construction and demolition materials (551.89 Tons/Year) and the increase in collection of any of the above items due to Program expansion. The current operation utilizes a twice per week frequency that the roll-offs are transported for recycling (depending on volume). It should be noted that the above data outlining the transfer operation size, allotted usage, and transportation are estimated figures, based on historic usage, as well as anticiuated expansion. Actual volumes and removal frequency will be dependent on actual program participation. Ms. Grace Farrell, NYSDEC RE: Project No. 3-MSWSS-127 - 3 - October 5, 2000 5. The Force Account Summary included in our previous correspondence dated May 22nd, 2000 was based on data obtained from the Town Highway Department. This information outlined the estimated man and equipment hours expended to data, and paid for at the local prevailing wage and equipment usage rates. The work was not performed at set times or for a set duration, but rather, was performed as personnel and equipment were available. No records were kept of the specific nature that you request. We feel that the information previously submitted accurately reflects the man and equipment hours required to perform the specified work. Please feel free to contact this office if you have any questions or comments. Thank you for your consideration in this matter. Very truly yours, J2 ~~ (/~ Joseph E. Paggi, Jr.o/E.~ JEP:law Enclosure JEP:PJP:law cc: Hon. Constance O. Smith Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Graham Foster Albert P. Roberts, Esq. " , .fill' FORCEACCOUNTSU~ARY TOWN OF WAPPINGER RECYCLE CENTER UNIT COSTS HOURS COST CATEGORY WAGES BENEFITS EQUlPMT TOTAL RATE COST/HR . OPERATOR $ 30.40 $ 15.78 ---- $ 46.18 200 $ 9,236.00 . LABORER $ 22.81 $ 8.84 ---- $ 31.65 20 $ 633.00 . MASON $ 25.41 $ 12.14 ---- $ 37.55 100 $ 3,755.00 . TEAMSTER $ 20.85 $ 13.45 --- $ 34.30 150 $ 5,145.00 LOADER ---- -- $ 95.00 $ 95.00 125 $11,875.00 . DOZER ---- ---- $ 95.00 $ 95.00 50 $ 4,750.00 . BACKHOE ---- ---- $ 90.00 $ 90.00 25 $ 2,250.00 . 10- WHEELER ---- ---- $ 55.00 $ 55.00 150 $ 8,250.00 . ---- ---- $ 75.00 $ 75.00 15 $ 1,125.00 . ROLLER TOTAL FORCE ACCOUNT COST TO DATE (March 8l\ 2000) $47,019.00 - 6 -