058
~
PAGGI,MARTIN &DELBENE LLP
Consulting Engineers & Land Surveyors
~
56 Main Street
Poughkeepsie, New York 12601
845-471-7898
845-471-0905 (FAX)
FAX & MAlL:
H. Osterhoudt Excavating, LLC
11 Spring Street
Ellenville, New York 12428
-9~c
4'Oy ~V~
~<i ~ ~"J
'o.~~ 0 d "'
~1t 6'IJtO ~~
O<~ ~O
'~.e ~,
November 16,2000
Attention: Howard Osterhoudt
Reference: Scott Drive/Carroll Drive - Drainage Improvements
Town of Wappinger, Dutchess County
Dear Mr. Osterhoudt:
Attached please find the Notice to Proceed dated November 16th, 2000 for the above referenced
proj ect.
Pursuant to the provisions of the specifications for this project, you are responsible for
submitting the following information prior to the commencement of construction activities:
1. Minority and Women Business Work Plan as outlined on Pages M/WBE-1 through
M/WBE- 7 of the specifications.
2, Construction schedule.
Any questions or comments can be addressed to this office.
Thank you for your cooperation in this matter.
V;9' truly yours,
C~;?))/~ (l
Charles R. Del Bene, Jr., P.~ /"
CRD:law
Enclosure
cc: Hon. Constance O. Smith, Supervisor
Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero, Councilman
Hon. Robert Valdati, Councilman
Hon. Elaine Snowden, Town Clerk
Graham Foster
Michael Tremper
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
Charles R. Del Bene, Jr., P.E.
t
~
NOTICE TO PROCEED
DATE:
November 16, 2000
TO:
H. Osterhoudt Excavating, LLC
(BIDDER)
OWNER'S PROJECT NO.: 2000-03(12)
PROJECT NAME:
SCOTT DRIVE/CARROLL DRIVE - DRAINAGE Irv1PROVEMENTS
TOWN OF WAPPINGER
CONTRACT FOR:
CONSTRUCTION OF 42" DIAMETER ALUMINIZED STEEL PIPE, 13" x 17" ALUMINIZED STEEL
PIPE ARCH, 6" DIAMETER PERFORATED HDPE UNDERDRAIN, CONCRETE HEADWALL WITH
MEDIUM STONE RIP-RAP, CONCRETE CATCH BASINS, PAVEMENT RESTORATION,
LANDSCAPE RESTORATION, EROSION CONTROL, TRAFFIC MAINTENANCE AND ALL
ASSOCIATED WORK.
YOU ARE NOTIFIED THAT THE CONTRACT TIME UNDER THE ABOVE CONTRACT
WILL COMMENCE TO RUN ON November 20, 2000 . BY THAT DATE, YOU
ARE TO START PERFORMING THE WORK AND YOUR OBLIGATIONS UNDER THE
CONTRACT DOCUMENTS. THE DATES OF SUBSTANTIAL COMPLETION AND FINAL
COMPLETION ARE SET FORTH IN THE INFORMATION TO BIDDERS;
THEY ARE January 19, 2001
AND January 19., 2001
, RESPECTIVELY.
TOWN OF WAPPINGER (OWNER)
By:~/?JlfL2J.
(AUTHORIZED SIGNATUREf'
Engineer to the Town
(TITLE)
NTP -1