Loading...
021 ~ PAGGI. MARTIN & DEL BENE LLP Consulting Engineers & Land SUT'Deyors 02/ 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) April 13, 1999 RECEIVED APR 1 4 1999 SUPERV/~v TOKfJ OF fA': oJ IJrt-/CE dAPPINSER Town Supervisor Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith Reference: Wappinger Sewer Transmission/Treatment Improvement Area Phase 3A Dear Supervisor Smith: Enclosed please find our contract for the services for design and construction inspection for the above project. The contract is modeled after the contract used in Phase I and Phase II of the same sewer improvement, and is general work for the Town. It would be appropriate if you could adopt this at the April 26th, 1999 Town Board meeting to be signed after the estoppel period is up. I believe that date would be on or about May 3rd, 1999. We could then start our initial surveying work as expeditiously as possible to allow us to prepare the first set of contract documents. If there are any questions, please do not hesitate to contact this office. ;:;;"{#J Joseph E. Paggi, Jr., P.E. JEP:law Enclosure cc: Albert P. Roberts, ESQ. w/enclosure Joseph E. Paggl, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Ch:lrlcs R. DelBene. Jr.. 1'.1~_ CONTRACT BETWEEN: THE TOWN OF WAPPINGER, a municipal Corporation having its main offices at 20 Middlebush road, Wappingers Falls, New York 12590. AND PAGGI, MARTIN & DEL BENE LLP, a Limited Liability Partnership, which principal offices are at 54-56 Main Street, Poughkeepsie, New York 12601 A CONTRACT for Professional Engineering and Land Surveying services for the Wappinger Sewer TransmissionlTreatment Improvement Area, Phase 3A PROJECT DESCRIPTION: The TOWN OF WAPPINGER has been authorized to design and construct the Wappinger Sewer TransmissionlTreatment Improvement Area - Phase 3A. To accomplish this they wish to retain Professional Engineering and Land Surveying services. PAGGI, MARTIN AND DEL BENE, LLP, a Limited Liability Partnership providing Profession Engineering and Land Surveying services wishes to provide the TOWN OF WAPPINGER WITH THESE SERVICES. It is understood that these services will conform to the Project as delineated in the Map, Plan and Report prepared by PAGGI, MARTIN & DEL BENE, LLP dated September 14th, 1998, and the environmental document prepared by Matthew D. Rudikoff Associates dated January 11th, 1999. These services will include: 1. PAGGI, MARTIN & DEL BENE, LLP will complete all necessary property and topographic surveying necessary for the implementation of this Project. 2.. PAGGI, MARTIN & DEL BENE, LLP will do all necessary design calculations to complete this Project in accordance with the above Map, Plan and Report. These design calculations will include, but not be limited to, collector line sizing, pump station design, force main design, pipe layout and road crossing design. The design shall conform to all current codes and regulations of the State of New York. 3. PAGGI, MARTIN & DEL BENE, LLP will prepare all necessary plans to become part of the Contract Documents. These plans will be prepared in such a manner as to allow Contractors to submit a bid to the TOWN OF WAPPINGER for this project. 4. PAGGI, MARTIN & DEL BENE, LLP will prepare all necessary specifications to become part of the Contract Documents. The specifications will include the necessary Notice to Contractor, Information for Bidders, General Specifications, General Provisions and Detailed Specifications. All necessary proposal forms and legal requirements will be included in said specifications. 5. PAGGI, MARTIN & DEL BENE, LLP will review all necessary bids and make the appropriate recommendation to the Town Board, TOWN OF WAPPINGER. 6. PAGGI, MARTIN & DEL BENE, LLP shall provide all necessary resident engineering and construction inspection services for the construction of the collector lines, pump station, and forcemain located within the Town of Wappinger. Included in the resident engineering and construction services are the approval of all monthly requisitions and final requisitions. 7. PAGGI, MARTIN & DEL BENE, LLP will make application for and receive all necessary permits to complete the above Project. It is contemplated that applications will be made to the Dutchess County health Department, New York State Department of Environmental Conservation, and the Dutchess County Department of Public Works for their approvals of the various permits required. 8. PAGGI, MARTIN & DEL BENE, LLP will provide the necessary Engineering Services to conform to requirements of the New York State Department of Environmental Conservation and/or the Environmental Facilities Corporation in furtherance of an application for the New York State Water Pollution Control Revolving Fund. . This will include services during the application phase, design phase and construction phase. - 2 - 9. PAGGI, MARTIN & DEL BENE, LLP will provide all necessary Engineering and land Surveying services that are necessary to coordinate activities with the Tri-Municipal Sewer Commission's Engineers and/or other professionals. It is anticipated that for this project to be successful, mutual cooperation will be necessary. In light of this, technical reports will need to be furnished to the Town Board, TOWN OF WAPPINGER regarding progress on the Tri-Municipal portion of this Project. 1 O.PAGGI, MARTIN & DEL BENE, LLP will prepare a monthly and/or as needed reports for the Town Board, TOWN OF WAPPINGER to keep them informed on the progress of the various phases of work on this project. These reports will be presented to the Town Board on or before their monthly Town Board meeting and will be made available to the Board Members prior to the meeting. 11.PAGGI, MARTIN & DEL BENE, LLP or the TOWN OF WAPPINGER reserves the right to terminate this Contract upon a written notice of thirty (30) days. PA YMENT: For the work performed as described in Items 1 through 10 listed above, the TOWN OF WAPPINGER will pay PAGGI, MARTIN & DEL BENE LLP for the total amount of hours worked to complete each individual task. The hourly rate of pay will be as shown in the enclosed hourly fee schedule. PAGGI, MARTIN & DEL BENE LLP reserves the right to update this schedule on a yearly basis on or about January 1 at of that year. Worked performed under these items will be billed on a monthly basis with payment expected from the Town within thirty, (30) days. We have included an hourly fee schedule for January 1999 - December 1999. - 3 - . .' The Engineering Contract I?etween the TOWN OF WAPPINGER, Municipal Corporation with its principal office at 20 Middlebush Road, Wappingers Falls, New York and PAGGI, MARTIN & DEL BENE, LLP, Consulting Engineers with their principal office as 54-56 Main Street, Poughkeepsie, New York, has been read and reviewed by you and you approve of its contents. BY: 4-),21 )rfl I Date: BY: ~4'~uIf!l~ Constance O. Smit Supervisor, Town of Wappinger Date: d'1/9;9 AUTHOR~EDBYTOWNBOARD ON '.'_ ~t/~9 COMMENTS - I - - 4-