022
,
PAGGI, MARTIN & DEL BENE, LLP.
CONSULTING ENGINEERS AND LAND SURVEYORS
54 - 56 MAIN STREET
POUGH'KEEPSIE, NEw YORK 12601
Phone (914) 471-7898 / Fax (914) 471-0905
Memo
To: Wappinger Town Board, attention: Constance O. Smith
From: Peter J. Paggi ~
cc: Vincent Bettina, Councilman
Joseph Paoloni, Councilman
Joseph Ruggiero, Councilman
Robert Valdati, Councilman
Elaine Snowden, Town Clerk
Gerald Terwilliger, Town Comptroller
Date: 04/13/99
RECEIVED
APR 1 5 1999
Re: Landfill Closure State Assistance Program
Castle point Landfill
ELAINE SNOWDEN
TOWN ClE.'Rf(
Comments:
Dear Supervisor Smith and Board Members:
Please be advised that the 4/08/99 reimbursement check from the NYSDEC in the amount of
$ 247,250.11 represents 90% of the total eligible reimbursement amount for the Castlepoint Landfill
Closure Project. As per Paragraph 2.C of the Town's Contract with the State, the DEC will retain 10%
of the payment ( $27,472.24) until the DEC makes its final inspection and approves the Project as
complete.
The only remaining punchlist items to be completed at the site involve establishment and initial
maintenance of the grass areas, removal of the erosion control measures, etc. (see our previous
correspondence of 11/05/98). We are presently waiting until the grounds dry up a little before finishing
these items. Upon completion of the work, we will schedule a final inspection with the DEC, and submit
a voucher requesting release ofthe additional $ 27,472.24.
Any questions or comments may be addressed to this office.
Cad11DA TA\DRAWINGS\DOCUMENTSlcplandfill.eqba.4.13.99
. Page 1
.,
r.",.~ . '1'),,'
V )i k
./ 'V' ( \)
~
PAGGI. MARTIN & DEL BENE LLP
Consulti~ E~ineers & Land Surveyors
J
54-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAX)
~ .'
'..
.
J..
{ ~
''\
~\},\, '. .\Y
It
I ~
:t~ :
"
March 19, 1999,
\ ,--
\J
RECEIVED
f1AR 22 1999
ELAINE
iOWN SNOWDEN
CI..E'Fl1(
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Supervisor Constance O. Smith
Reference: Post-Closure Monitoring
Castlepoint Landfill
Dear Supervisor Smith and Board Members
As you are aware, construction for closure of the Castlepoint Landfill was completed in
the Fall of 1998, and the Engineer's certification of Construction Compliance was
submitted to the New York State Department of Environmental Conservation on
11/23/98.
In order to remain in compliance with the Town's Consent Order, and as required under
the Local Government Mandate Relief Program, the Town is responsible for submitting a
Post-Closure Monitoring and Maintenance Operations manual to the DEC for approval.
The specifics of the Manual must satisfy the applicable provisions of 6NYCRR Part 360.
If the Board so desires, this office could investigate the various options available to the
Town relative to Post-Closure monitoring and care of the landfill.
Please advise this office if you would like us to proceed in the matter.
If there are any Questions or comments, please feel free to contact this office.
Thank you for your consideration in this matter.
PJP:me
Enclosure
Cc: Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero, Councilman
Hon. Robert Valdati, Councilman
Elaine Snowden, Town Clerk
Albert P. Roberts, Esq.
Cad 1 \OA T A \ORA WINGS\OOCUMENTS\cppostclosure3.19.99
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
Charles R. Del Bene. Jr., r.E.
.-~...~