August 2, 1999
f
"\
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
"j"
Ci..f::l1k~)t:.:1v
Attention: Constance O. Smith, Supervisor
Reference: Central Wappinger Water ImprovementlTank Rehabilitation
i'""<'
Dear Supervisor Smith & Board Members:
Enclosed please find three File Memo's (July 28th, 1999, July 30th, 1999 and August 2nd,
1999) documenting the history of the most recent problems we had with the two water
storage facilities within the Central Wappinger Water Improvement.
Also please find copies of Pittsburgh Tank & Tower's two proposals itemizing and stating
the cost of the work that was done.
I have sent a voucher to Pittsburgh Tank & Tower and will expect them to submit a
voucher for the sum of $24,810.00 to cover the cost of the work.
I have also enclosed in this packet, copies of the correspondence sent to Pittsburgh Tank
& Tower Company from our office, and copies of their insurance certificates to cover the
workers on the job.
I assume I will be getting final reports from Pittsburgh Tank & Tower Company on the
work performed, and will furnish the Board copies of the same upon receipt.
If there are any Questions or comments, please do not hesitate to contact this office.
~erY Iy yours,
I~C
oseph E. pa';g;', ~
JEP:law
Enclosure: See Attached Sheet
cc: Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero, Councilman
Hon. Robert Valdati, Councilman
Hon. Elaine Snowden, Town Clerk
Albert P. Roberts, ESQ.
Michael Tremper, Camo Pollution Control
Dan O'Connor, P.E., Dutchess County Health Department
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
Charles R. Del Bene, Jr., P.E.
ENCLOSURE PACKET
1. FILE MEMO'S FROM JOSEPH E. PAGGI, JR.:
. July 28th, 1999
· July 30, 1999
· August 2, 1999
2. PITTSBURGH TANK & TOWER COMPANY'S PROPOSALS:
· July 28th, 1999 Proposal
. July 31 st, 1999 Proposal
3. CORRESPONDENCE TO PITTSBURGH TANK & TOWER FROM PAGGI,
MARTIN & DEL BENE:
· July 28th, 1999 Letter to Don Johnston Acceptance Proposal
· July 28th, 1999 Memo to Don Johnston Voucher/Repair Work
4. PITTSBURGH TANK & TOWER INSURANCE CERTIFICA TE (Undated):
-
i
,-
'/
PAGGI, MARTIN & DEL BENE, LLP.
CONSULTING ENGINEERS AND LAND SURVEYORS
54 - 56 MAIN STREET
POUGHKEEPSIE, NEW YORK 12601
(914) 471-7898/Fax (914) 471.Q905
FileMemo
From: Joseph E. Paggi, Jr., P.E.
Date: July 28, 1999
Re: Central Wappinger Water Improvementfrank Rehabilitation
RECEIVED
AUG 04 1999
ELAINE SNOWDEN
TOWN CLeRK.
> At approximately 10:00 a.m. on Wednesday, July 28th, 1999, Frank Billings and a co-worker from
Pittsburgh Tank and Tower Company anived on the site.
> Camo Pollution Control dewatered the Rockingham Water Tank on the previous evening.
;... We had made a visual inspection of the interior of the tank and it indicated that there was
significant rusting along the horizontal and vertical wells, and that a significant amount of pitting
was obvious above the water movement line.
> A quick visual inspection by Frank indicated that there was approximately 30' of horizontal well and
8' of vertical well to be repaired to secure the tank. He also recommended the tank be sand-
blasted and filled, primed and painted.
> It was our feelings at this point in time that the critical path would be to repair the structural
problems in the well and then at some later point address the surface repair.
> We spoke to the home office of Pittsburgh Tank and Tower Company at approximately 12:30 p.m.
They will fax my office a proposal on the above welding and other information. They are also to fax
us insurance certificates for the work being done naming the Town, Camo, and our office
harmless.
;... We spoke to Frank Billings about complying with all compliance base rules and regulations, and he
informed us that he would.
> We also brought Frank to the Hilltop Tank. The tank was spraying at this point in time (10:30 a.m.).
Frank informed us due to fact that the leak was in lower horizontal joint that the tank had the
potential for failure. At that point, he said he could weld a fitting over the leak and plug it.
;... At that point, he called his main office who informed him that he should not do that due to the
unknown capabilities of the steel surrounding the leak.
. Page 1,
.ft'
::-
..,
C\lWVlfT"ank Rehabilitation
July 28, 1999
Page 2
~ We thank decided to have Pittsburgh Tank and Tower Company provide the necessary
underwater (diving) inspection made as soon as possible to determine what the general shape of
the steel surrounding the leak was. Knowing that, we may be able to weld the leak from the
outside without dropping the level of the tank. Obviously, dropping the level of the tank at this point
in time is not a desired avenue to take.
>- At the time of the writing of this tile memo, which is 1 :35 p.m. on Wednesday, July 28th, 1999, I do
not have the fax as yet from Don Johnson of Pittsburgh Tank and Tower.
Joseph E. Paggi, Jr., P.E.
JEP:law
Joseph E. Paggi, Jr., P.E.
JEP:law
. Page 2
PAGGI, MARTIN & DEL BENE, LLP.
CONSULTING ENGINEERS AND ~ND SURVEYORS
54- 56 MAIN STREET
POUGHKEEPSIE, NEW YORK 12601
(914) 471-7898JFax (914) 471-0905
File Memo
From: Joseph E. Paggi, Jr., P.E.
Date: July 3D, 1999
Re: Central Wappinger Water ImprovementlTank Rehabilitation
);- On Wednesday mid-aftemoon, I received the proposal from Pittsburgh Tank & Tower Company
regarding the work necessary for the above referenced Improvement area. We accepted Items 1
through 4 for $12,310.00.
);- Mr. Johnston was informed in writing of this. We also confirmed that all work was being done to
applicable safety codes, including confined space. I confirmed this with Posey McCormick and the
workers onsite.
,. On Thursday moming, July 29th, 1999, more workers arrived bringing the total of three workers
onsite. They started on the wells and completed the majority of the welding on the horizontal third
ring. They went to get scaffolding to setup to weld the bolts on the roof supports. After that was
completed, they were going to complete the inspection of the remaining rings to determine what
else needed to be welded. They advised us that the exterior section of the floor appeared to be
rusting, and that that could be a potential source of leakage.
;,. We advised them today that the interior painting work will probably not be done due to the fact that
(a) There was the potential for having to take the Hilltop tank out of service pending the diving
inspection.
AND
(b) The emergency nature of the work may not be there.
);- Mr. Johnston confirmed on late Thursday aftemoon that the diver would be coming in late Friday,
and in all likelihood, would do the inspection first thing Saturday moming.
Joseph E. Paggi, Jr., P.E.
JEP:law
. Page 1
PAGGI, MARTIN & DEL BENE, LLP.
CONSULTING ENGINEERS AND LAND SURVEYORS
54 - 56 MAIN STREET
POUGHKEEPSIE, NEW YORK 12601
(914) 471.7898IFax (914) 471-0905
File Memo
From: Joseph E. paggi, Jr., P.E.
Date: August 2, 1999
Re: Central Wappinger Water ImprovementfTank Rehabilitation
y On Friday, July 30th, 1999, we continued working on the Rockingham Storage Facility welding all
the roof beams and bolts and the horizontal and vertical seams in conformance with Pittsburgh
Tank & Tower Company's proposal dated July 28th, 1999. This is Items 1 through 4 in that
proposal.
y The diver arrived on the Hilltop site at about 3:45 p.m. and went into the Hilltop Tank at about the
same time. He came out at 4:15 p.m. when he noticed that the leak in the eastem portion of the
tank had worsened considerably. Interior photographs were taken to determine what the proper
course of action would be, however, unfortunately, they were not developable.
y At that point in time, we adopted an Emergency Plan to drop the water level in the Hilltop Storage
facility to be below the leak and weld an exterior plate across the leak on Saturday, July 31 st, 1999.
y Supervisor Constance O. Smith and Councilpersons Ruggiero and Valdati visited the Hilltop Water
site at 8:00 p.m.. A history of all the emergency repairs, and potential corrective actions were
discussed.
y Don Johnston of Pittsburgh Tank & Tower was to look at the diver has written report to make a
recommendation as to the nature of the exterior weld.
y We planned to reconvene at the site at 7:00 a.m., Saturday, July 31st, 1999.
y The work was completed on the Rockingham Water Storage Facility at approximately 8:00 p.m.,
Friday evening.
y Camo Pollution Control chlorinated the tank and started to fill it up at the same time.
y Saturday moming, July 31st, 1999, we arrived at the Hilltop Water Storage Facility at 7:00 a.m.
Pittsburgh Tank & Tower had not arrived yet, therefore, we called Don Johnston. We arrived at an
agreement with Mr. Johnston that we were going to weld approximately 27' of new plate along the
exterior. It would be two (2) 10' sections on the horizontal, and one (1) 7' section on the vertical.
The diver was to show the welder which vertical was to be welded.
. Page 1
Central Wappinger Water Improvement
August 2, 1999
Page 2
~ They anived at approximately 9:15 a.m. and setup the scaffolding. Camo supplied all the
necessary steel plates. The diver then showed the welder which vertical seam to weld. Then the
diver and two other workers left at approximately 9:45 a.m.
~ We were in constant contact with Don Johnston, who after reviewing the diver's report feels more
comfortable with the "patch", and that it will at least last until "October". He did emphasize that the
patch should still be considered temporary. He then faxed copies ofthe welding diagram.
);- At that point in time, the Hilltop tank was about 12' and the Rockingham tank was about 22'.
);- They took their bacteria sample at about 10:30 a.m. out of the Rockingham facility to bring to the
lab.
).- We received a proposal from Don Johnston for the additional welding on the Hilltop tank at
approximately 10:30 a.m. The proposal was $13,500.00. I stated on the telephone that it
appeared to be a little bit out of proportion with the cost of the improvements made at the
Rockingham Storage Facility. Mr. Johnston stated that it was probable two (2) days worth of
welding , and that they were working on overtime rates. He did state that if the work was
completed during the day on Saturday, he would deduct $1,000.00. As it tumed out, the welder
completed the project at about 8:45 p.m. on Saturday, and therefore, the scope of the work was
more considerable than I had originally thought. The welders left the site at approximately 9:00
p.m.
,. From that point in time, the Hilltop system was at about 14' and was still feeding the Rockingham
system.
~ We reconvened Sunday, August 1 st, 1999 at 9:00 a.m. at the Hilltop tank. The Hilltop tank at that
point in time was up to about 31', and we were awaiting the bacteria results from the Rockingham
Storage Facility. Those results were received verbally at 11 :00 a.m. and the two systems were
then separated.
~ The Rockingham well pumps were tumed back on and that water storage facility was allowed to
get back on line.
,. The total cost for the repairs incurred by Pittsburgh Tank & Tower for the Rockingham and Hilltop
Storage Facilities is $12,310.00 plus $12,500.00 for a total sum of $24,81 0.00.
JEP:law
. Page 2
07/28 '99 13:00
ID:PITTSBURG TANK & TOWER
.-...
~.
FAX:
PAGE
1
--
~
~
I
t
p \.'\"1' S B U He']' A N K ,~ T () W I': H co.. 1 N c; .
P,(),lltIX 'Jlj
I I I '. N l) I': I{ S () N. I": Y .1:; .~l ()
270-K26-9000 EXT. 228
270.826-1970 FAX
III\CSIMILE TI~^NSMIT'1'^1. SIII':Io:'I'
:' : J(\ ~ PB{~(1L
"'~'KK6'L M~~\\~ {~oNbu.Ll\N~1
1'1(1'1',1
DUIl.!c Ihn:-ltC!ll . Prl.!\id(.~11t
- ' ~
11o'.TF '7!ze>}qt..
: ('C5Y (I~F';~~~ INrl:i1 l:Nl, C.: :\'1'.1\
TIMI.
I'~q ii',: ~~",'.1I'1~1-~
""\ ~Jl;MI~l;.R'
~4 4'l( NlOG
,Id... :,: ,I......, 0 I' 11\ :U;.VIIo:W
12',55 e"'(.
,."
o !': I.A:.I':'.lIMMI.;r-i'1
el 1'11.:,\:;1;. In':I':....
o :';.:':i'~'!': RI';i Vi" ;'
NIIl'!;,:<,l I H.tf\I:I.~JT;'
,.J~w
_~h}\bLJI~\D QU.~.c~OU\\'It")N" 1(J \ t)El.D \\4E 0~B'M~,:+
~(W\~~\eLlp CDN\\Ci'~i'lDN6 I ~_AINI ""\H~INrf:"R\'O~", .."
\ '
~(l t I ~d~ -rliUYT \~'lJ~ -TF\NK.,. As UJE "f)12L?uf5"':-ED ~H \ S
fJ.ot?..N..l&(i,._.. DIu (1 F:R T L~lfB.(L -1J~.,.lli5IA~) A NIlE ~
CU.~b\~\N.C~-l':'n()t--.) Mf:.-n-t)[J ~6 .pfk AwwA.
~~\LQO.. fl1ID---'lW2. &tOTA1\(~1 -rD 'Pill "(IT 'Ti-\E-
Btrt\~\ce (~l-'hlF. ~y)~~_ ~rma:., - ..-.-
I W
J
....., .......,
e
.'-
i.
r
.,..
l
r
i
,:.
~.
f' u. t'lOX 91:1. HI' NIlI HSON. KENTUCKY 42419-09':1' TEL.. (!\U"'II)?6'!lC)CIO' rAX {5021827 4417
t"IIINI . HFPA1H . IllsM"NlI C 'INlWECT . TANKfl RAiseD, LOWFRFO ANn Mev!-!" N!-W ANLl Ul:lEO TANKl:i
f.
PIT'I'3BURG TANK & TOWER CO., INC.
DATE: July 28. 1999
TO: Paggie Martin Consulting Engineer
914-471-0905 Fax
SINCE 1'10
REFERENCE: Town of Wappinger, NY
~
In accordance with price, terms and conditions quoted below, we propose to furnish all labor, matetial,
equipment and insurance necessary to complete the following to a 300,000 gallon storage tank,
l~
$.
,.
1. Weld approximately 30' of horizontal seams as necessary.
l
~
.~
t,:
2. Weld one (1) vertical seam complete.
3, Weld the rafter and clip connection on the side wall of tank.
Welding will be performed using E6010 welding rods and our welders are certified to the latest ASME
code.
4, Scuba dive the 1,000,000 gallon tank to assess the pitted arecs. This will include underwatar
photographs and recommendations for replacing or refurbishing tank.
Item5 1,2,3 & 4 for the sum of..$12,310.00 (Twelve Thousand Three Hundred Ten Dollars NO/100)
5. Interior painting:
Surfaco Preparation
Pittsburg Tank & Tower. hereafter referred to as Contractor, agrees to cleFln ~1I interior portions by sandblasting
to S.S.t' ,C. #10 (near white)
Interior Lining
Contrnctor will lltripe coat all seams and pits and coat the tank's interior with 8 to 10 dry mils ot an epoxy system.
This linel will pass all tests as non-toxIc and safe for coating flesh water storage facilities. The liner will mp.ot
NSF, NFPA-22 and EPA standards.,
fnterior painting for the sum of..$19,600 (Nineteen Thousand Five Hundred Dollars and NoJ100)
. Handling, removal. and/or disposal of hazardous or contaminated material (e.g., asbestos, lead.
chemicals, etc,) requiring special handling or tran8portation to a specific disposal site aro not included
in the submitted quotation 10r work.
. Owner understands and agrees any Federal, State, and Municipal taxes impaled on Contractor with
respoct to the outlined work are additional expenses not Included in the contract and further assumes
the obligation of paving said additional coats incurred boy Contractor.
. This contract is governed by the law. of the Commonwealth of KentUCky and any claims should be
filed with the Commonwealth of Kentucky.
. Warning: Do not attach any additional loading to your tank/tower unle.. etructurallntegrity ,is known
to be sufficient, For analyals call PT&T.
'1.';11'111111', I)" 11111 :lUa"h allY additilll"'\ hlll<llll,~ I.. Vllur \illII<JI"w~1' 1I111~HH ~lnl.'llIml inll:'.....ly i. \..lI"WIl hI h~ H"lIki':ll\. 1"11' an,liys" .,lill'Tiit.'1'
Terms: Upon Completion
Th,' IllInh'~ "llprovlnE lbl. ,'mITl'll,'1 ",'nlry lhullh,'y nf" f~"1y lIulh..rb.,'d 111,11_ HlI.lIl1d flllllllll"'!!ul ""11111"'/11"111- h"",'IM','1I ,'''1II1-1I,'d willi,
YOIIIII'" l\l'r,'h~' lllllhu,...",II" funJlHII ullll,bt""lIInh'rl"l. ,..,,,1"111"111111111 IRllllr...II'" ".....h.."II" ,.".11"".... th,' WUI'k 1111.11........<1 I.. II... Ill..""
l!:~I~I. I'll" wlllo'h !~'.: ..11111.'....1111\.11 "l!"':~'H III IIIIY ,II... 11111'1\1111 III1'nlllll,,",IIII. ~I,ltl '''''f'tlKlIlllIId Iln'urdlnc h. t~,. 1t'.':!!1lo 1Il1'n,..r,
ACCEPTED
19_
RESPECTFULLY SUBMITTED:
PlTTS8URG ANK & TOWER COMPANY, INC.
"
l -, .. {
BY, 'J .,i
JOHNSTON. PRESIDENT
Paaai Martin Consultinq Enaineer
BY_
TITLE
ALl. QUOTATIONS SUBJECT TO ACCEPTANCE WITHIN 90 DAYS
, '99 13 :01
ID:PITTS8URG TANK & TOWER
~
FAX:
PR~t:
;;
,,-
..
p, 0, OOX 910. ttrNOrFlSON. KENTUCKY 012" 19.0Ql:l' TEL, (l>O:.!) 81/1i'''UUU' FAX (1)0:>) 8:>7.4111'1
PAINT. RCP"IR . DIGM^NTLE; . INll""I~ I . IANKS HAIH..'), I OWI'mefl AND MOVED' N!W "NO U!OCC T"NK!:l
PITTSBURG TANK & TOWER CO., INC.
SINCE 1919
DATE: July 28, 1999
TO:
Paggi Martin Consulting Engineer
914-411-0805 Fax
REFERENCE: Town of Wappinger. NY
In accordanco with price. terms and conditions quoted below, we propose to furnish all labor, material.
~qlliprnenl and insurance 1l6Cessary to complete tho following to a 300,000 gallon storage tank.
EXTERIOR
High pressure wash using hot water with TSP detergent injection (minimum 3.000 PSI at 3.0gpm using
Lero degree rotating/osculating tip). Hand tool clean areas as needed. Encapsulate all exterior surfaces
witll a c:oat of epoxy mastic and then apply to ail exterior surfaces one coat of poiyurethane,
CONTRA(:TOR FURTHER ACREES
The handling. removal andlor dlspoaal of hazardoua or contaminated material. such as aabestos, lead.
chemicals or any like aubstance that requires special handling or that must be taken to a specific
dump/disposal site ia not included in the quotation for work submitted herein,
The tank owner further underst8nda and agrees that all Federal. State and Municipal taxes of whatsoever
nature and kind that may be imposed on contractor with respect to tho products described herein shall be
In addition to the contract price and tank owner assumes the obligation for paying for said additional coats
being incurred by contractor.
This contract shall be governed by the tawsot the State of Kentucky and the proper form for bringing
claims shall also be the State of Kentucky.
Warning: Do not attacn any additional loading to your tank/tower unles. structural Integrity is known to be
sufficient. For analysis call PT& T.
QllALlTV CONTROL
We further aQree all paint will be delivered to the job aite in original container. identified by manufacturer
as to contents therein and that all labor will be performed by mechanics skilled in their trade. No paint
shall be appliad dLlrlng wet. damp or inclement weather.
All workmanship Is gLlaranteed for twelve (12) months after completion,
INSlIRANC~~
Prior to start of work. a certificate of insurance covering Workmen's Compensation.
Occupational Disease, Employer's Liability and Public Liability will be furnished to the Owner.
All of the above to be completed in a substantial and workmanlike manner for the sum of:
$14.010.00 (Fourteen Thousand Ten Doltars and NO/100
Terms: Upon Completion
TI... ,NI,"h', "","""""11 till. l'mur.Il" ""'111) .....'nlt'Y IIn' l\lIly lIulb..rlu.d '" .I.. M",llIMt 11111' .1I11"llld 1't.t!ul....ulL'''...IIIW,. ''''''11 ,'ofll/llh'd wllb,
V""II''I'III'....II,. IIl1lhorll.l'l\ III'ul'DINh "1I1"llIIr,llI,,u'rhll. .'qlllp""'''1 "..a 111.111"11111'" n'quIN'l1 III "11111/111'11' Ih,' .....~ fIll'lIlillllrd In 1111' IlIM'\'"
l.n'IK~~III. f..r wlll.'h ,h,' 1IQ1~"''NIIlIll't1l1ltl'''''MI.. fillY 'h! 11ll~~'Ullt 111"11.1..11..1 111l1li111 1111./lII....I"..d 1I......n1ll1lll.. ,h,' '''''DIN tllC'r""f.
ACCEPTED
18_
RESPECTFULLY SUBMITTED:
PITTSBURG ANK & TOWER COMPANY, INC.
BY /
TITLE: DO JOHNSTON, PRESIDENT
Paaai Martin Consultina Enaineer
BY
TITLE
ALl. QUOTATIONS SUBJECT TO ACCEPTANCE WITHIN C)O DA YS
.'. ._~~~::.~:..~.:.~:.:.:~..~.~,~.._.",
.6 '89 13:02
ID:PITTSBURG TANK & TOWER
~,
FAX:
PAGE
4
.;
or
P. O. "OX 91:i' HENOE~SON. KENTUCKY 4241!1 0913' TeL. (50?) D?tHlOon. FAX (Ml:.l) a:u.4417
"^1m . nt:r~m 0 OI!$MAN11 t' . INI:II'F:(:1 . IANKS "'AII'i..O, L I)WF.=RIiCl AND MoveD. New AND useD TANKl:\
.:--
PITTSBURG TANK & TOWER CO., INC.
SINCE 1919
July 28, I C)C)Q
Town of Wappinger
c./o Paggi Mnrtin Consulting Engine~r
RE. lJisintection of a 300,000 Gi.tllorl Water Storage Tank
Relativt to the chlorination or the above referenced tank, we recommend Chlminatiol1
Method #3 This A WW/\ appmved method consists of the following:
1. 300,000 Gallem Wuter Stunl~e TlInk
. PI,u.:e ().6 pounds of Calcium Hypol;hlorite (65% HTIl) in liII line
. I-ill the tank to approximately :su,./o nfits capacity. I ~.OOO gallons.
2. The hahulce of the procedure: To be Ilcrformed hy others
. Let stand I'm a minimum of six (6) hours.
. Fill the lank with potable wut~r to llvert10w level.
. Let stand tor a minimum of twenty-four (24) hours
. Purge all highly chlminated w,\ler lhHn lhe drain piping.
Additiol1ul resllonsibility:
Following this proceuure, and subject tn satisfactory bactcriuloglcallcsting and aCl~cptabk~
acslhetil', quality, the remaining water may he delivered to the distribution system. Tn be
perli)rm~d by others.
Il'ynu llt:lcd to discu:-;s this in greater detail. please call mc at (502) X2(l-9000 Exl. 228
~
07/31 '99 09:19
ID:PITTSBURG TANK & TOWER FAX:
PAGE
1
~
1'1'1''I'SBlJR(j TANK & '1'OWI,:R CO..
P.(). U(IX lJ1:\
II I ~ N I) I { It S () N . "y 4 2 4 1 I)
2 7 0 . H 2 6 - 9 0 0.0 n X'!'. 22 8
270-82(.-1970 FAX
IN C,
I'^(;SIMII.E TIUN~MI'I"I'^I. SllImT
-
." ,.
I'KIIM'
lAY
DI)II JOhllSlllll - Pn:sidt:1I1
'.IIII4I',\NY. .
_... ~~<\AhrL
I'IIUN". NIIMI'l!lt:
IlIlT!!"
FA\: NIIMI'HR.
_~--lli .. 4ln?\ 1 ~O ~
-~-
TIMII
q '. I '7 &v-Yv
~;ltlol':NT CJ 1'('lt llEVII';W
o I'I.HM:H 1.1 IMMII,N'I' D l't.I'.^:;If, 10(I'/.Y 0 I'I.H^::'I( RW YCI.t.:
NI lTI'~;/I.1 'MMENT::
~r . OlY"' Q.rr I U (l{)('YlpP:tt S. ll-tt... \}j(jf~k'.. 'TDl)'H Y f ..;r:: l.l\' I L
.'"""- 1\ \ .
L,=-l\ll~j( -'ICi)() {Y'or'ft Our ~I~e.
.. "--- --', -.-- . ...-
..-- . -. '-. --. .--. ....---- '.--'-. .-
1/31 '99 09:19
ID:PITTSBURG TANK & TOWER
FAX:
PAGE
2
.,."
P. O. !lOX !l1:1. HI': NI.>I::nSON, KrN rU(:KY 4'~1!1-n!l'::I.lT.l.. (5111) B;>f1-IKllIO. MX (50:') 11:07.44117
I'AlNT' RePAlR . DI~ANTU::. INl:lPCCT. TANKS R^ISI:D, LOweReD AND UOVG:D. NCW AND U!OCD TANKS
PITTSBURG TANK & TOWER CO.t INC.
SINce 1818
DATE:
July 31, 1999
TO:
Paggi Martin Consulting Engineer
914-471-0905 Fax
RE: Town of Wappinger Falls, NY
In accordance with price, tanns and conditions quoted below, we propose to furnish all labor, material,
equipment and insurance necessary to complete the fOllowing to a 300,000 gallon storage tank.
Repair the leak in the horizontal seam by welding. To the left and right of leak a 12" plate will be
welding on the exterior, provided by Owner.
Repair one vertical seam 12" wide x 7' long by welding a plate,
Tho above for the sum 01..$13,500.00 (Thirteen Thousand Five Hundred Dollars NO/100)
WlInlltlt:: ()Ulll'l Olllllch UIIY addilion,J hlndinR hi Yllllr "lllk/hIW.:t' UIlI"". ,,In...111r:i1 ill,~,.')'i.:v is kllnwnlnlk: slIlIj",jclIl. Fur anal""is 1:.III''/"&.T.
Terms: Upon Completion
'/1,.. pIl111t.. _ppl...VIt'! I.... .....u......, ....l1lfy 111M' Ih.., III,. nlll, 1I11C1I1I1U..1I111 dllllO, 111111 'IaMI 1111 Ir.1l1 n'quh'l.ml'lIb bYI' b...... ....mpll...1 wllh.
\,''" ..n' II\.rrhr lI.ollll..i.....d ,..l\lnell''' nlll..b..r.III...C'.....I. ...""lp.....lIllllld 1_lral1l''' I....lulr.... ... ,......p...... .h.. ",'n. 1111'1'11""1'" IlIlh.. "b"Yr
pmp"."I, fi... ..hl,'h till' IIn......I.nl'lI II.I'C'I'.." Pll)' fhl' am..UII' 111....11..".... h, _w 1"...,.....1..... """""""1: 10 .h.. ".nll.lhl'r....r.
ACCEPTED
19_
RESPECTFULLY SUBMITTED:
Paaai Martin ConsultinQ Enaineer
PITTS8URG TANK & TOWER COMPANY, INC.
BY
BY
">
TITLE
TITLE: DON JOHNSTON. PRESIDENT
ALL QlJOTATIONS SUBJECT TO ACCEPTANCE WITHIN 90 DAYS
~
()
PAGGI. MARTIN & DEL BENE LLP
Consulting Engineers & Land Su.rveyors
;~
5il-56 Main Street
Poughkeepsie, New York 12601
914-471-7898
914-471-0905 (FAX)
VIA FAX & MAIL:
July 28, 1999
Pittsburgh Tank & Tower Company
P.O. Box 913
Henderson, Kentucky 42419-0193
Attention: Don Johnston
Reference: Central Wappinger Water ImprovementlTank Rehabilitation
Dear Mr. Johnston:
Please proceed with Items 1. 2. 3 and 4 of your proposal dated July 28th, 1999.
In addition. please notify our office regarding when the underwater diver is
scheduled for the Hilltop tank. as this tank is in need of immediate repair.
As per my telephone conversation with Posey McCormick and my memo of
today's date. it is my understanding that all safety regulations. including confined
space, are being followed. and pertinent insurance certificates have been faxed to
our office.
Should you have any questions or require additional information. please do not
hesitate to contact this office.
Very truly yours.
/~E~1iJ
Joseph E. Paggi. Jr., P.E.
JEP:law
cc: Hon. Constance O. Smith, Supervisor
Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni. Councilman
Hon. Joseph Ruggiero. Councilman
Hon. Robert Valdati, Councilman
Michael P. Tremper
Daniel O'Connor. P.E.
Albert P. Roberts, Esq.
Joseph E. Paggl. Jr.. P.E.
Ernst Martin, Jr.. P.E.. L.S.
Charles R. Del Bene. Jr.. P.E.
f
,
,
r:
r
~
PAGGI, MARTIN & DEL BENE, LLP.
CONSULTING ENGINEERS AND LAND SURVEYORS
54- 56 MAIN STREET
POUGHKEEPSIE, NEW YORK 12601
(914) 471-7898/Fax (914) 471-0905
.'
.
:i
,
.
:1
~
:t
f
Memo
To: Don Johnson, Pittsburgh Tank & Tower
From: Joseph E. Paggi, Jr., P.E.
cc: Constance O. Smith, Supervisor
Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero, Councilman
Hon. Robert Valdati, Councilman
Michael Tremper, Camo Pollution Control
Hon. Elaine Snowden
VIA FAX & MAIL:
Date: July 28,1999
Re: Central Wappinger Water ImprovementJiank Rehabilitation
Thank you for your quick cooperation on the repair work necessary at our two (2) water storage
facilities.
Please use this address and telephone number as a contact point for the work that is being proposed.
will mail for your use two (2) payment vouchers for all Town of Wappinger work.
As previously discussed, you are going to fax the required insurance certificates and an
acknowledgement that all AWWA and appropriate safety rules, regulations and codes are being
followed by your firm Qncluding confined space).
If there is any information required by our office, please do not hesitate to contact us at the above
telephone number.
JEP:law
. Page 1
.."
~
~' PttmburgT8IIk
. Tower Co.
. Engineers. fab-
'.. .co,... ricators. and
,ectors of elevated and ground storage
tanks to the following codes: A WW A.
API 620. API 650. API 653, UL, IR!.
NFPA-22. and Factory Mutual. In busi-
ness since 1919. Painting-repair-dis-
mantle-inspection and nationwide 24-
hour emergency repair service. Tanks
raised, lowered, and moved. New and
pre owned tanks, P.O. Box 913, Hen-
derson, KY 42419-01913; (502) 826-
9000 ext. 228, fax (502) 827-4417; Web
site: www.watertank.com; e-mail:
watenank@dynasty.net
See u& on AWWA'&lnternet Hom. peg.
http://www.awwa.org
AWWA AuocIate Member
~ No. 213
httII:/ /www..-lIdII.i/lldquery.htm
TANK ERECTION,
RESTORAnON.& INSPECTION
t
[II Maguire Iron
Inc. is a com-
W. ... plete water tank
MaguIre 111I, Inc. a~d t,ower or?a-
rnzatlon speoal-
izing in new-tank fabrication; custom
steel fabrication; erection, used tank
relocation; interior and exterior paint
systems for existing tanks. Also avail-
able are inspection reports and other
technical information involving water
tanks and towers. P.O. Box 1446. Sioux
Falls, SD 57101-1448; (605) 334-9749,
fax (605) 334-9752. Web site:
www.maguireiron
A 'ate ember
No. 214\
:/ /www.._..-.I~
~PlttsburgT"k
. . Tower Co.
~ . Nationwide
...,. ,... tank inspection
since 1919. Conventional and underwa-
terto AWWA, FM, NFPA 22, API 650 &
653. OSHA, EPA. earthquake, strucrural,
and coating specifications. Complete with
recommendations and cost estimate. P.O.
Box 913, Henderson, KY 42419-01913;
(502) 826-9000, ext. 228. fax (502) 827-
4417; Web site:www.watenank.com;
e-mail: watertank@dynasty.net
See us on AWWA's Internet Home page
http://www......org
AWWA Auociate Member
~ No. 21S
httII:/ /www..-lIdII.i/lIIIqUeIy.htm
..
~.
,r-.
~,....-
TANK INSPECTION
Liquid Engi-
neering Corp.,
the nation's
largest and
most experi-
enced potable water diving company
offering cleaning. inspection. and repair
of all types of potable water tanks.
. CERTIFIED COMMERCIAL
DIVERS. no SCUBA, surface supplied
air only
. Totally encapsulated diver-sealed
diver helmet mated to sealed dry suit-
no human contact with the water
. Full-color, high-resolution live video
coupled with live voice communication
. Tanks remain full of water and
in total operation at all time, no
draining
. All dive inspectors trained to NACE,
SPC, A WS, ACI standards and Level
II T Certified.
Pho : (800) 438-2187, fax: (406) 651-
0120
Adquery No. 281
httII:/I_"-lIdII'i/lIIIqUeIy.htm
~ ~tech
Aqua-Spec Inc. Specialists for your
water storage tanks and towers. Our
'Company provides certified inspectors.
. Underwater videotape documenta-
tion for coating failure and metal fatigue
. Corrosion and structural surveys
. Underwater coating applications/fab-
rications/repairs
. Bottom debris and sediment samples
. Pipeline/confined space/ROV inspec-
tions
. Munidpal or industrial cleaning ser-
vice available with no downtime or lost
revenue
. Dry evaluations
. Complete recommendations, con-
clusions, and proposals
A cost-effective company dedicated to
quality and service. Fully insured. Phone:
(516) 431-8973, fax: (516) 431-8524
~ No. Z82
httII:/ /www..~edquery.htm
Extech, LLC, Nationwide Water
Tank Corrosion & Inspection Ser-
vices. TankRover™, underwater ROV
inspections. and Scavenger™ under-
water remotely controlled tank cleaning
robot, 100% internal coverage. no
downtime and no human contact with
water. (Video available)
. Comprehensive Assessments
. Tank Cleaning
. Coating Specifications
. Lead Paint Management
. Application Inspections
. Structural Evaluations
. Coating Failure Analysis
. Water Quality Sampling
Tank Assurance Program (TAP),
turnkey management, 470 Industrial
Park Road. Deep River. CT 06417; (860)
526-2610. fax: (860) 526-5018, e-mail:
extech.llc@snet.net
~ No. 216
httII:/ /www~""",ery.htm
Underwater Solutions Inc. A Division
of Water Solutions Co. (Water Quality
Consultants)
. Tank, clearwelL and zebra mussel
inspections.
. Confined space certified, fully insured.
. Certified COMMERCIAL divers uti-
lizing sanitized practices, drysuit. hard-
hat surface-supplied air, communica-
tion system, enabling extended
downtime and thorough documenta-
tion.
. Video inspections, cleaning, repairs,
etc.
. No shutdown required.
. MunidpaL engineering. and health
department references available. P.O.
Box 208. Mattapoisett, MA 02739;
(508)758-6126, fax (508) 758-6128.
Adquery No. 217
httII:/ /www..-lIdII.i/lIdquery.htm
180 JOURNAL AWWA
ADVERTISING SECTION
OJ
J
:3:02
ID :PITTSBURGTANK 8. TOWER
I-RX:
r-HI:l~
;.;
CERTIFICA T~OF LIABILITY INSU~C~:i~~11
'l'MIS CERTIFICATE IS Issuec AS A MATTER OF INFORMAT,ON
ONLY ANC CONP!RS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMENC, exTeND OR
ALTER THE COVERAGE AFFORCEO BY THE I'OWCIES BE\.OW.
COMPANIES AFFORCING COVERAGE
;.OIJ:).,.
OA TI! IIMNOO,.,.,!
.:ER
J MEftR INS~c:E
)09 i'UCRJ:CA S'l' PO BOX 785
MENSBOac KY 42302-0785
'%:'rH HOPGOOD COfoUlANV
!.!!!L!lI. !502-gS!5-!5!581 "..No 502-68!5-3342 A INV1:S'1'ORS INS CO 01' AMmUCA
4Ult10 cOW'''''''
B CIaNA COMPANIES
PITTSBURG 'rANK . TOWEa CO :rHC COMPANY
ZIJ!lVAftD 'l'Nnt DIVISION INC C I'IRE , CASUALTY INS CO 01' C'r
POBOX 913 COM"ANY
HENDERSON KY ~2420 D G'AEA'1' AMEJ\X CAN
::JVEAAGES
THIS IS TO CERTIFY "'ATTl4l! POLICIES OF INSURANCE L.ISTEO BELOw HAVE BeEN IssueD TO THe INsuReD NAM!O ABOVE FOR Tlo4E POLICY PfRIOO
INDICATeD, NOTWI-"'STANOING NN REOUIAe'-lENT, TERM OR CONDITION 01' ANY CONTRACT OR OTHER DOCUM!NT WITH ~I!S"I!::T ro 'NI..ICH THIS
C~!'lTIFICATe MA'!' 8e ISSUeO OR MA'!' P'!RT.\IN THI! INSURANCi ~FORDEO BY THE "OLICIES DesCRIBED HEREIN IS SU8JEcr TO.\L~ 7HE 'rERMS,
~.S~~~s NolO "::SCIT.'.OltS OF SUC~~ES, LIMlLS SHeWN MAY ~vt BIiEN AEO~~,~D!I.!.~~:~!MS
.. T'\'P( OF IN$l.IRAHC! floue.,. NUMBER i PO~ICY IfF!CTIVE I 'OLICY 1!X',IUTION :
"I I OA TI; IMMlCOIY'Y1 i 0... 'TE (MMIOllJ'Nl
~eIW.LIA8~I1'r ,GENEAALAGClRE.,GATE ~'2,OOO .ao~._..
A ; X' COMMtlRc......GE/OlelW.w..II.J'T't, GI.i'l003680 09/23/98 03/31/00 ''''''OOUCTS.CO~IO''AGG i' 1,000,000
: ~ I C~ IMDE [jJ oceu" i P!iRSONA~ 10 ADVINJURY I I 1, 0 a 0 , 0 0 0
! OWNER'S. COHTRACTOI'fS ,"",OT I 110 I'OIM co 00 01 10 n ' EACH OCCURRENCE I , 1 , 0 a 0 1 000
, x: ~~_~~C1 AGG I i ~1"EONMGl!tMyCll'l.(O'.1 1 S 50,000
X:WAlVEa or SUBao IMEOEXPIAnv__IOfl' ,s lO,OOO
",uTOMOBILE LIA8ILI1'Y \ I . 1, 000 I 000
: x ANUUTO AsRO01281 09/23/98 I 03/31/00 COMIIINEO SINGLE LIMIT \.
I
,
I
I
LIMITS
, "'lL OWN!!C """ T;: S
, SOOIL Y INJURY
, ~"'.r ~.,aa",
! s
, SCHEDULeo A," ,:;:5
"'''OI'I!RT'\' DAMAGE
is
I
I
i s
.JL HIRED AUTOS
.JL NON-owNEO ,",UTOS
BODIL Y INJURY
II""'-nlenll
,
I "'UTD GilLY, EA ACClceNt : s
~I!R THAN AUTO ONLY
I EACH ACCIDENT ! $
,......8. ~
C"'RACE LIABlllT'l'
, ANY AuTO
E:
X uM8REI..L)I FORM
OTI1IA THAN UMBRELLA FORM
wOltKERS CO",PiNSATION AND
.1 EMPLOYER" I.WlILIT'\'
o THE ,...o....'eTOIII
PAIlT/OlliRSlf.IUiCuTrvE
OFFICERS A"'E,
BE8198028
I
09/23/99 I
~)cCESS LIABILITY
c.\U1l1l' -"C1l 111ft. .,ee:
!
i
ri.Q1~\ WC959615502
r"1 illCL
03/31/99
a Equipment Flo<lte:
B Builders R.:i..sk/lnst
I20210G92
I202l0S92
09/23/98 \
09/23/98\
RENTEO
PER OCCR.
500,000
2,000,000
,~ THER
CE5CAIPTlON OF OPI!RAT:ONSlLOCArIOHSNeHIC~e$/SPEClAlITEMS
PT&T Job 99195 - interior misc:. welding
located at Waupinger, NY
faggi Martin C9~su~tlng Engineers & Cnmo
in respect to llab11ity.
CERTIFICATE HOI.Ci;R
Town of Wappinger
Town Hall
Wappinger, NY
$3 ;-;8 1 0 . 0 0
and interior painting on a 300,000 gallon storage tank
Polution Control are be be listed as Ciddi tional :i.nSl1reC
BI.ANCOl
CANCELLATION
SHOULD ANY 0' ;~i! ABove oeSCRIBI!D POlICI!!S I. C...."'CE~~&:O aE'ORE ~e
EXPIRATIOH DATI! THf,.Eor. rhl! ISSI,;.NCl COMPANY WILL eNDeAVOR 10 M.I>:L
.12.- DAYS 'IIRll'TEN NOTICI! TO T)of CERLlFICATE HOlOER NIWED TO T"'f ~E.rr
auT FAILURE TO M,&.L SUCH HOTICE 5~AL~ :MPOSl! NO OlllleA 1rON OR LLA8:~If"(
OF ANY KINO UPON TH!! COMPANY, Irs ACENTS OR REPftESI!N1ATIVES
AUTHORIZED REf'HI:SI!NTATIVE
KEITH HOPGOOD
- ACORD CORPORAilON 1988
'CORD 25.5 (1/95)