Loading...
049 , 67~ PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land Suroeyors Oyq 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) August 16, 1999 ~\'\j€.O ",€.G ~ ~ ~~~ , ~O~~ 5~O ~ ~\J>-\~~~ C\..~ ~O~ Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith, Supervisor Reference: Proposed Water Connection Joint City/Town Water Distribution System Dear Supervisor Smith & Board Members: As you are aware, the Town has started to drill wells at the Atlas Wellfield to augment the supply to the existing water districts of the Town of Wappinger, most specifically the Central Wappinger Water Improvement. During our well drilling operation, it has become evident that the flow in the Wappinger Creek is rather slow. We have researched the existing flow rate at the existing gauging station, which is just north of the Atlas Wellfield. This service is provided by the USGS and shows that the actual flow of the Wappinger Creek at this point for the month of August has been averaging between 5.5 and 8.0 cfs. Normally, the median flow based on 71 years of records for this area is upwards of 35-40 cfs. With that in mind, it would appear that if the Town has any intentions of constructing a pipe across the Wappinger Creek it would seem to be a opportune time to do that. I have spoken about this to Dan O'Connor and he concurs with this whole-heartily. I am taking the liberty of presenting this at the August 18th, 1999 Town Board meeting in order that the Board might consider. I have also taking the liberty of estimating the cost to construct a line from Vassar Road down to the Atlas Well field with the appropriate sized watermain. Included in this cost projection is the crossing of Vassar Road, which is a State Road, construction of appropriate meter pit, appropriate creek crossing and any other ancillary work. It would appear that the total project cost for this work is in the neighborhood of $760,000.00. Joseph E. PaggI, Jr., P.E. Ernst Martin, Jr., P.E., L.8. Charles R. Del Bene, Jr., P.E. Constance O. Smith Town Board Re: Proposed Town Water - 2 - August 16, 1999 Please keep in mind that there will definitely be other contractual costs that will be associated with this tie-in to the Town of Poughkeepsie. This $760,000.00 cost is the project cost to connect the pipe from Vassar Road to the Atlas Wellfield. This work should be considered by the Town to provide additional water over and above what the groundwater resources of the Town of Wappinger would provide. That will be necessary to allow for the orderly growth of development in the Town of Wappinger in the future, and to provide for a backup source which is desperately needed. If there are any questions or comments on the above, please do not hesitate to contact this office. JEP:law cc: Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden, Town Clerk Michael Tremper Daniel O'Connor, P.E. Albert P. Roberts, Esq.