November 22, 1999
~
~~
~ ~~ ~~:~
7? ~~~, -.
_.;;~'.. _ h.
-,~.."
, ~ .~
L1.~
. .~
V"
T~(7'
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance O. Smith, Supervisor
Reference: Proposed Wappinger Water Improvement 99-2
Dear Supervisor Smith & Board Members:
As instructed at the last Town Board meeting, we were asked to revise the
appropriate cost section of the Map, Plan and Report for the proposed Wappinger
Water Improvement 99-2 as a result of the discussions had with various
developers within the District. I have done so and report the following:
I have included copies of the cover page, and Pages 1-4 of the original Map, Plan
and Report, and I have revised Sheet Nos. 2 and 3 with revisions dates in the
lower right hand corner.
>- As you can see, the project cost went from $5,750,000.00 to
$4,550,000.00. This reduction is a result of the removal of approximately
9,600 l.F. of dedicated tank line. This is proposed to be installed by a
private developer and dedicated to the Town.
>- That reduction in the total necessary bond amount lowers the maximum
annual payment for principal and interest to $409,500.00 from
$517,500.00. With approximately 5,000 benefit units (b.u.) This results
in a per benefit unit cost of approximately $81.90. This number was
previously $104.00. These costs are assuming a 5 % interest rate and use
of the 50% rule.
>- Lower interest rates and/or participation in the New York State Drinking
Water Revolving Fund would, in all likelihood, further lower these costs.
This is due to the State's utilization of the net level debt service and the
realization of an interest subsidy of approximately 1/3 by participation in
the loan fund. We could explore this further if so desired by the Board.
Joseph E. Paggi, Jr., P.E.
Ernst Manln, Jr., P.E., L.S.
Charles R. Del Bene, Jr., P.E.
Hon. Constance O. Smith - 2 -
Town Board
RE: Wappinger Water Improvement 99-2
November 22, 1999
I trust this information is sufficient, however, if further documentation is
necessary, please do not hesitate to contact me at the office.
Ve/-5uly yours,
~p
Joseph E. Paggi, Jr., P.
JEP:law
Encl osure
cc: Hon. Vincent Bettina, Councilman w/enclosure
Hon. Joseph Paoloni, Councilman w/enclosure
Hon. Joseph Ruggiero, Councilman w/enclosure
Hon. Robert Valdati, Councilman w/enclosure
Hon. Elaine Snowden, Town Clerk w/enclosure
Albert P. Roberts, Esq. w/enclosure
Sprout Creek is for all intents and purposes dry. and the well field is 'J,{;,CiE"'E'"
about 35% capacity. V j D,',
N '.
OV 29 19.
PROPOSED IMPROVEMENTS: 12~/N€ S rsg
. '1/11/"" ,..NOWD
It is proposed now to make certain improvements to provide an additional So'Jtelf 12",
of water to the Central Wappinger Water Improvement and to further provide
better, more stable service to the North Wappinger Water Improvement. It is also
the goal of this improvement to allow the supply to the Cranberry Hills Water
Improvement and reinforce the supply to the Myers Corners II Water District.
Earlier in 1999, we had made a proposal to the Town of Wappinger for the
Combined Wappinger Water Improvement, which had a project cost of
approximately $18,000,000.00. This detailed numerous items that were to be
constructed in the Town and was an ultimate goal and plan for the Town of
Wappinger. We are now proposing that certain items of work be done to meet
the immediate (1 year approximately) goals and design and construct these items
in a manner that they would be able to be incorporated into the larger overall
Improvement without modifications. These improvements would be:
> Completion of the Atlas Wellfield for up to five (5) wells, including appropriate
well pumps and necessary controls.
> Dedicated tank line between the Atlas Well field and the Hilltop Water Storage
facility.
> Retro-fitting the Pizzagalli Interconnection to become a pressure reducing
station to backfeed the North Wappinger Water District.
> Construction of a clear well at the Atlas site, including hi-lift pumping that will
transport the water through the dedicated tank line to the Hilltop Water
Storage facility.
> An appropriately sized, Phase 1, water storage facility at the Hilltop site
(approximate size one million gallons).
> Tele-metering and control work between the Hilltop site and the Atlas
Wellfield.
Total project costs, including hard and soft costs, for the above is
$4,550,000.00. There are approximately 5,000 benefit units in the Central
Wappinger Water Improvement, North Wappinger Water District, Myers Corners II
Water District, Cranberry Hills Water Improvement and the Ardmore Hills Water
Improvement. These existing users are to pay for the $4,550,000.00
Improvement.
The maximum annual cost for a bond term of twenty years at an interest rate of
5% would be approximately $ 81.90 per benefit unit.
- 2 - REVISED 77/22/99
PROPOSED COMBINED WAPPINGER WATER IMPROVEMENT
DEBT REPAYMENT SCHEDULE
YEAR PRINCIPAL INTEREST TOTAL
1 $ 182,000 $ 227,500 $ 409,500
2 " 218,400 400,400
3 " 209,300 391,300
4 " 200,200 382,200
5 " 191,100 373,100
6 " 182,000 364,000
7 " 172,900 354,900
8 " 163,800 345,800
9 " 1 54,700 336,700
10 " 145,600 327,600
1 1 273,000 136,500 409,500
12 " 122,850 395,850
13 " 109,200 382,200
14 " 95,550 368,550
15 " 81 ,900 354,900
16 " 68,250 341,200
17 " 54,600 327,600
18 " 40,950 313,950
19 " 27,300 300,300
20 " 13,650 286,650
TOTAL $4,550,000 $2,626,250 $7,166,250
NOTES:
1. The above figures were calculated using the 50% Rule.
2. The chart represents retirement of $4,550,000.00.
3. The interest rate utilized is 5.0%.
- 3 -
REV/SED 11/22/99
-
"
MAP, PLAN & REPORT
FOR
PROPOSED WAPPINGER WATER IMPROVEMENT - 1999/No. 2
PREPARED FOR:
TOWN BOARD
TOWN OF WAPPINGER
20 MIDDLEBUSH ROAD
P.O. BOX 324
WAPPINGERS FALLS, NEW YORK 12590
AUGUST 11, 1999
R€CEIII12D
NO,! 29 1999
EI..AIN
!OVv~ ~i~~DEN
PREPARED BY:
PAGGI, MARTIN & DEL BENE LLP
CONSULTING ENGINEERS & LAND SURVEYORS
54-56 MAIN STREET
POUGHKEEPSIE, NEW YORK 12601
BACKGROUND:
The Town of Wappinger currently owns, operates and maintains numerous water
districts within the central portion of the Town.
The largest district is the Central Wappinger Water Improvement (CWWI), which
was authorized by the Town Board in 1973. The sources for the CWWI are two
(2) well fields located on the Sprout Creek recharged by the Sprout Creek Aquifer.
They are the Hilltop Wellfield and the Rockingham Wellfield. It has been
demonstrated historically and substantiated professionally by the Dunne
GeoScience Report that the well fields are effected by seasonal drought
conditions that exist in the Sprout Creek and, as such, are not able to meet
average daily demands during these time periods.
With that in mind, the Town purchased the privately held Atlas Water Company in
1991 and formed the North Wappinger Water Improvement (NWWI). Of
significant importance here was the purchase of 11 acres of land along the
Wappinger Creek that was envisioned to provide a central water source for the
Town. The Town had a detailed aquifer capacity analysis done by Leggette,
Brashears & Graham in 1995. This report indicated that the safe yield for the
Atlas Wellfield was in the neighborhood of 1,500 GPM. This flow was calculated
using drought conditions with very little recharge from the Wappinger Creek.
There were four (4) existing water districts, which purchased the Atlas Water
Company in 1991. These included the following:
. North Wappinger Water Improvement
. Central Wappinger Water Improvement
. Cranberry Hills Water Improvement
. Myers Corners II Water District
CURRENT CONDITIONS:
During the last week of July 1999, a leak developed in the Rockingham Water
Storage Facility of the Central Wappinger Water Improvement. While repairing
that leak, another leak also developed at the Hilltop Water Storage Facility of the
same Improvement. The repairs were made on an emergency basis, and the
tanks now are not leaking. The tank repair company has informed us that the
work that was done on the tanks should be considered temporary and not
permanent. It was also stated to us that the general overall condition of the
tanks was from fair to poor.
We are also currently in a state of a drought emergency in the Town of
Wappinger. The levels of the Hilltop and Rockingham wells have been dropping
steadily as the duration of the drought increases. Most recently, in conversations
with the operator, it has been brought to my attention that the wells at the Hilltop
source have had to have been cut back to a lower flow to allow pumping levels to
remain above the screen.
- 1 -
Sprout Creek is for all intents and purposes dry, and the well field is operating at
about 35% capacity.
PROPOSED IMPROVEMENTS:
It is proposed now to make certain improvements to provide an additional source
of water to the Central Wappinger Water Improvement and to further provide
better, more stable service to the North Wappinger Water Improvement. It is also
the goal of this improvement to allow the supply to the Cranberry Hills Water
Improvement and reinforce the supply to the Myers Corners II Water District.
Earlier in 1999, we had made a proposal to the Town of Wappinger for the
Combined Wappinger Water Improvement, which had a project cost of
approximately $18,000,000.00. This detailed numerous items that were to be
constructed in the Town and was an ultimate goal and plan for the Town of
Wappinger. We are now proposing that certain items of work be done to meet
the immediate (1 year approximately) goals and design and construct these items
in a manner that they would be able to be incorporated into the larger overall
Improvement without modifications. These improvements would be:
~ Completion of the Atlas Wellfield for up to five (5) wells, including appropriate
well pumps and necessary controls.
~ Dedicated tank line between the Atlas Well field and the Hilltop Water Storage
facility.
~ Retro-fitting the Pizzagalli Interconnection to become a pressure reducing
station to backfeed the North Wappinger Water District.
~ Construction of a clear well at the Atlas site, including hi-lift pumping that will
transport the water through the dedicated tank line to the Hilltop Water
Storage facility.
~ An appropriately sized, Phase 1, water storage facility at the Hilltop site
(approximate size one million gallons).
~ Tele-metering and control work between the Hilltop site and the Atlas
Wellfield.
Total project costs, including hard and soft costs, for the above is
$5,750,000.00. There are approximately 5,000 benefit units in the Central
Wappinger Water Improvement, North Wappinger Water District, Myers Corners \I
Water District, Cranberry Hills Water Improvement and the Ardmore Hills Water
Improvement. These existing users are to pay for the $5,750,000.00
Improvement.
The maximum annual cost for a bond term of twenty years at an interest rate of
5 % would be approximately $ 104.00 per benefit unit.
- 2 -
PROPOSED COMBINED WAPPINGER WATER IMPROVEMENT
DEBT REPAYMENT SCHEDULE
YEAR PRINCIPAL INTEREST TOTAL
1 $ 230,000 $ 287,500 $ 517,500
2 II 276,000 506,000
3 II 264,000 494,500
4 II 253,000 483,000
5 II 241,000 471,500
6 II 230,000 460,000
7 II 218,500 448,500
8 II 207,000 437,000
9 II 195,500 425,500
10 II 184,000 414,000
1 1 345,000 172,000 517,500
12 II 155,250 500,250
13 II 138,000 483,000
14 /I 120,750 465,750
15 II 103,500 448,500
16 II 86,250 431,250
17 II 69,000 414,000
18 II 51,750 396,750
19 II 34,500 379,500
20 II 17,250 362,250
TOTAL $5,750,000 $3,306,250 $9,056,250
NOTES:
1. The above figures were calculated using the 50% Rule.
2. The chart represents retirement of $5,750,000.00.
3. The interest rate utilized is 5.0%.
- 3 -
It should be noted that there is additional work that would be necessary to be
done to accomplish the entire Proposed Combined Wappinger Water Improvement
as previously discussed with the Board.
The items that would remain to be done would be:
. Additional well at the Rockingham Wellfield.
. A booster station on Cedar Hill Road.
. An additional pressure reducing station going down to the North Wappinger
Water system.
. Distribution reinforcements along Myers Corners Road and All Angels Hill
Road.
. The Atlas Filtration Plant.
. The Rockingham and Hilltop Chlorine Detention Facilities.
. Cedar Hill Storage Facilities.
. Additional storage facilities at the Hilltop site.
The above does not include tying in of any of the satellite districts, including
Oakwood and/or Wappinger Park. This has been discussed by the Board, but is
not part of this proposal.
The thrust of this proposal is to perform the above work, which is felt necessary
to be done to remove the emergency status of the Central Wappinger Water
Improvement as it relates to source capacity and storage capacity.
I would like to reiterate another opinion previously spoken about by this office,
which is the connection into the Joint CitylTown Water Distribution system
adjacent to the Atlas site. It is my opinion that the connection into this source to
be used as a primary and/or backup and/or supplementary source is critical to the
long range, orderly development of the Town. Additional and redundant sources
of water will be necessary in the future to provide the residents of the Town with
a reliable, abundant source of water.
Again, I would strongly recommend that the Town Board initiate and continue
discussions with the Joint CitylTown Water Board towards this end.
- 4 -