Loading...
074 {: PAGGI. MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) September 21, 1999 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Jt~c f::i J ~ S~p V €(). ~~ <J rol4'~ (999 11-'", 84'0 c~~ '*DL-o ~k "/11 Attention: Constance O. Smith, Supervisor Reference: Chelsea Ridge/Water Dear Supervisor Smith & Board Members: As instructed at the last Town Board meeting, I met with Dan Stone of the Chazen Companies, Engineers for the Chelsea Ridge Complex, regarding the potential for extending central water services to the Chelsea Ridge facility, and in turn, potentially having this line serve the hamlet of Chelsea and other surrounding areas within the Town of Wappinger. Discussed with Mr. Stone were the following items: 1. The preferred option for connection of the Chelsea Ridge Complex to a central water facility would be via the installation of a water transmission line on Baxtertown Road with the water source coming from the Village of Fishkill. The Town of Fishkill, in all likelihood, would eventually wind up owning the line within their municipal boundaries from the tie-in point to the Town of Wappinger. In addition, the Town of Wappinger would own their municipal line within their municipal boundaries to the connection point of Chelsea Ridge. There would probably be a master meter located at some point, preferably on one of the Town lines, and there would be an individual meter for the Chelsea Ridge Complex. 2. First SteD: Schedule a meeting with the Village of Fishkill to determine if there is sufficient source capacity and to have some preliminary discussions on a rate structure. 3. Second SteD: Discussions with the Town of Fishkill to determine if they are interested in accepting the pipe that would be constructed within their municipal boundaries. 4. Third SteD: Perform all the necessary tasks required by the regulatory agencies, including SEOR, New York State Department of Environmental Conservation approvals, New York State Department of Health approvals, and all Highway Work Permits necessary from the Dutchess County Department of Public Works and the New York State Department of Transportation. I Joseph E. Paggl, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene, Jr., P.E. Constance O. Smith Town Board RE: Chelsea Ridge/Water - 2 - September 21, 1999 It is presently felt that the Town of Wappinger engineer's presence at the initial meeting with the Village of Fishkill is not necessary. However, if the Town Board would like us to attend, we would. Engineer Stone will set up a meeting with the Village of Fishkill as quickly as possibly and report back to our office with the findings discussed at the meeting. If there are any questions or comments, please do not hesitate to contact this office. :;;~o:;,:~ ,~ ~ Joseph E. Paggi, Jr., P.E. JEP:law cc: Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Albert P. Roberts, Esq. Daniel Stone, P.E.