Loading...
003 C03 PAGGI & MARTIN Consulting Engineers & Land Surveyors .. 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) Fl' €CEI'V€D f1AR 1 b"" . 1998 ELAINE s IOL1-'N NOWDEN CLE'RK . .. March 1 2, 1998 Vergilis, Stenger, Roberts & pergament 1611 Route 9 Wappingers Falls, New York 12590 Attention: Albert P. Roberts, Esq. Reference: Proposed Cellular Tower Legislation Dear AI: I am in receipt of your transmittal dated March 6, 1998, more specifically a draft of Proposed Local Law regarding the regulation and placement of telecommunications towers in the Town of Wappinger. I have reviewed the same and offer the following: Please note that as I am not an expert in the field of telecommunications, and therefore, I have tried to review the proposed Local Law as it relates to general municipal engineering. 1. It appears as if there will be areas where telecommunications facilities are going to be allowed. It is my guess that this list will be itemized in the final Local Law, and will be a result of input from both the telecommunications expert and the Town Planner. 2. There is a section on Page 6 that states repeaters may be installed within the locations approved for the normal facilities or in the rest of the Town of Wappinger. The obvious question is, "00 we want to limit the locations as to where these repeaters may be installed?" 3. On Page 7, it goes on to state that a Repeater Special Permit could be installed on a newly permitted Tower. This is confusing language in light of my Comment No.2. It assumes and/or applies that a tower may be installed anywhere in the Town. 4. On Page 13, it states that a Urecent" survey of the Tower Site will be required. I would substitute ucurrent certified" for the work Urecent" . Joseph E. Paggi,Jr., P.E. Ernst Martin, Jr., P.E., L.S. @ primed on recyded paper .. ;. Albert P. Roberts Re: Cellular Towers - 2 - March 1 2, 1998 5. Also on Page 13, it states that there must be a minimum of 5' contour intervals. I believe it should be 2' contour intervals. 6. On Page 14, it states that a Licensed Land Surveyor must complete the survey plan within two (2) years prior to the application date. I would change that sentence to state, UThe survey plan must be completed by a Licensed Land Surveyor and certified as being accurate." Certification must have the current date included. If there are any other questions or comments, please do not hesitate to contact this office. :;=s,~ ~ Joseph E. Paggi, Jr., P.E. JEP:law cc: Hon. Constance O. Smith, Supervisor Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Daniel Wery, AICP Don Close Elaine Snowden