VIA FAX & MAIL:
May 12, 1998
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance O. Smith, Supervisor
Reference: Fleetwood Water District Connection to Village of Fishkill Water System
Dear Supervisor Smith & Board Members:
On May 12th, 1998, I was informed by Jack Railing, Engineer for the Village of Fishkill,
that the Village Board of the Village of Fishkill has voted to not order the pump station
required for the above connection themselves, but rather include it in the total bid
package that a Contractor would order, pay for, and install.
Their tentative schedule is to advertise for bids on May 18th, 1998 and open bids on May
29th, 1998. Mr. Railing indicated that they would use their best efforts to have the
contractor order the pump station by June 10th, 1998, however, this appeared to be too
optimistic in my opinion,
Assuming, however, that the June 10th, 1998 order date is met, the delivery of the pump
station would not be until October 10th, 1998. At that point, the Contractor will have
approximately one (1) month in which to install the pump station. This would make the
installation complete by November 10th, 1998.
Assuming two weeks for start-up, the pump station is estimated to be operational on or
about November 24th, 1998.
I would recommend that we discuss this at the Board meeting of May 26th, 1998.
However, if there are any questions prior to that time, please do not hesitate to contact
this office.
VjYJrulY yours1J
d7~s:! (-:::~ V
Joseph E. Pogg;, V
JEP:law
cc: Hon. Vincent Bettina. Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero. Councilman
Hon. Robert Valdati, Councilman
Michael Tremper
Albert P. Roberts. Esq,
Elaine Snowden
Jack Railing
Hon. George Carter, Mayor, Village of Fishkill
Joseph E. Paggi,]r.. PE.
Ernst Martin, J r,. PE., L.S.
@ printed on ft!cycled paper