Loading...
025 ()C) 5 PAGGI, :\-L~TIN & DEL BENE LLP Consultin~ En~ineers & Land Surveyors . 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FA..'X) RECEIVED August 5, 1998 AUG 06 1998 Town Board Town of Wappinger P.O. Box 324 Wappinger Falls, New York 12590 ELAINE SNOWDEN TOWN CLeRK Attention: Constance O. Smith, Supervisor Reference: All Angels Hill Road Sewer Line/New Hope Dear Supervisor Smith & Board Members: As reported to you at the July 27th, 1998 Workshop meeting, I am in the process of calculating a fair value cost of the point repair that would have had to been made to excavate and replace a certain section of the pipe for All Angels Hill Road prior to lining the pipe. As you recall, this was an outgrowth of the problems incurred by New Hope Pipe Liners, Inc. in lining the pipe along All Angels Hill Road. A point repair was necessary to be made, and was made, as an emergency by Ben Ciccone, Inc. and Camo Pollution Control, Inc. Total cost of the point repair and the sewer lateral excavations was as follows: TABLE "AN COMPANY TOTAL REPAIR COST CAMO POLLUTION CONTROL $ 13,379.14 BEN CICCONE, INC $ 26,590.60 PAGGI, MARTIN & DEL BENE $ 3,687.00 CORBIN EXCA VTING $ 2,660.00 TOWN OF WAPPINGER $ 71 2.00 TOTAL REPAIR COST $ 47,028.74 Joseph E. Paggi, Jr., P.E. Ernst ~Iartin. Jr.. P.E., L.S. Charles R. Del Bene. Jr.. P.E. Constance O. Smith . 2. Town Board RE: All Angels Hill Road-Sewer Line Rehab August 5, 1998 From the above numbers, I extracted the cost to repair and unplug the two (2) sewer laterals on All Angels Hill Road. These costs are as follows: TABLE MB" COMPANY SEWER LATERAL COST ONLY CAMO POLLUTION CONTROL $ 3,260.82 BEN CICCONE, INC $ 5,428.82 PAGGI, MARTIN & DEL BENE $ 800.00 CORBIN EXCA VTING $ 665.00 TOWN OF WAPPINGER $ 178.00 TOTAL REPAIR COST $ 10,332.64 I then looked at the value of the overtime that was necessary for the point repair, and in all likelihood would not have had to been realized if the repair was done with prior knowledge. The cost of the overtime is as follows: TABLE MC" COMPANY OVERTIME COSTS ONLY CAMO POLLUTION CONTROL $ 2,003.50 BEN CICCONE, INC $ 3,892.81 TOTAL COST PREMIUM TIME $ 5,896.31 . Constance O. Smith - 3 - T own Board RE: All Angels Hill Road-Sewer Line Rehab August 5, 1998 Please note that this does not include the straight pay that would have had to been realized for these hours and is only reflective of the premium charges. Therefore, the total cost for the point repair that would have had to been made by the Town is . . . $47,028.74 (Total Cost) . - 10,350.64 (Sewer Lateral Repair Cost) . - 5.896.31 (Premium Cost) $30,799.79 NET COST FOR POINT REPAIR If the cost of the sewer lateral repair and the premium time ($16, 228.95) is deducted from New Hope's contract ($37,544.00), the total amount due to New Hope is $21,315.05. That number added to the $47,028.74 already paid by the Town equals a total construction cost of $68,343.79. This is under the cost to remove and replace the pipe of $95,000.00 listed in the Engineer's Map, Plan and Report dated March 1997. With that in mind, I would recommend that a settlement be offered to New Hope reflecting the above figures. If there are any questions or comments, please do not hesitate to contact this office. Very truly yours. ~ ~~~r~ --, -":"'--Joseph E. Paggi, Jr., P. _ JEP:law cc: Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Ira pergament, Esq. Albert P. Roberts, Esq. Michael Tremper