Loading...
030 ()?JJ PAGGI, MARTIJ." & DEL BENE LLP Consulting Engineers & Land SUT'Oeyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FA-X) RECEIVED AUG 1 8 1998 E~~~ SNOWDEN CLE'AK August 17, 1998 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith Reference: Town Recycling Center Dear Supervisor Smith & Board Members: As authorized by the Board, we have prepared a preliminary sketch of the proposed Town Recycling Center to be build upon the newly acquired Dean property, and also prepared a project cost estimate. The basis for the estimate was a sketch given to us by Graham Foster. It is proposed to build an entryway off Old Route 9 wide enough for two lanes in, and build a circular drive to facilitate ingress and egress. There will be constructed a paved parking area on top of the dumpsters with the dumpsters sitting below. To meet the grade, a modular reinforced concrete retaining wall will be constructed. There will provide fourteen (14) or fifteen (15) bin (dumpster) slots to accommodate various forms of recycled material. The backside of the dumpster areas will be paved to allow them to be brought in and out by the carting company through the existing Town Highway Garage site. There will be constructed onsite adequate drainage, signage, and landscaping facilities to make the site work in a environmentally sound manner, and look aesthetically pleasing. The site will also be surrounded with a 6' high PVC coated chain-link fence to insure proper security. There is not lighting planned for this site as it is anticipated it will be used solely during daytime hours. The estimated construction cost for the project is approximately $450,000.00. Design and inspection fees are estimated to be in the neighborhood of $50,000.00, with the total project cost estimated to be $500,000.00. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene. Jr., P.E. ~ Constance O. Smith Town Board RE: Recycling Center - 2 - August 17, 1998 It is anticipated that this work could be designed this winter and let out to bid early next Spring. It would hopefully be available for use to Town residents in late Spring, if not by the Summer months. If it is the Board's intent to pursue this project, please let our office know as soon as possibie so that design may start. If there are any questions regarding the above, please do not hesitate to contact this office. ve/0UIY Y:ro~) 6~<-C.! ':" ~ Joseph E. Paggi, Jr., . . JEP:law cc: Hon. Vincent Bettina, Councilman Hon. Joseph Ruggiero, Councilman Hon. Joseph Paoloni, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Albert P. Roberts, Esq. Graham Foster