Loading...
036 t ()30 PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land SUT'Deyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) August 28, 1998 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith, Supervisor Reference: Hussain Pump Station Dear Supervisor Smith & Board Members: I am in receipt of a letter from Tanveer Hussain regarding the Bell-Air pump station. As you are well aware, we are going to present the final Map, Plan and Report for Phase 3A to the Town Board at the September 14th, 1998 meeting. The execution of Phase 3A of the Wappinger TransmissionlTreatment Improvement Area will allow for the abandonment of the Bell-Air pump station. If all goes well, I would advise that the project should take three (3) years to complete. However, if there are any issues that need to be resolved during the public hearing process, application to the Comptroller's office, and/or the design, that time period will necessarily be extended. I would recommend that this information be transmitted to Mr. Hussain. With respect to the second paragraph in which Mr. Hussain questions the maintenance of the area, I would recommend that you send a copy of this letter to Mike Tremper for his input. If there are any questions or comments, please do not hesitate to contact this office. ve/j. .r... Iy yours, /) / // P ?~(Jl); .~~. / ~seph E. Paggi, Jr., P.E. RECEIVED JEP:law Enclosure: Hussain Letter cc: Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Albert P. Roberts, Esq. Michael Tremper SEP - 1 1998 ELAINE SNOWDEN TOWN CLeRK Joseph E. PaW, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Belle. Jr.. P.E. .- I .' T anveer Hussain 18 Bell-Air Lane Wappinger Falls, NY 12590 914-298-0746 RECEivIli '6 26 ,~~ To, Constance O. Smith Supervisor -- Town Of Wappinger 20 Middlebush Road, P.O. Box 324 Wappinger Falls, NY 12590-0324 , ~,1,~GI & MARTI~~ Dear Supervisor, I am writing this letter to find out the status of the sewer ejector station located in my front yard. In your letter, dated June 30, 1993, to me stated that hopefully your Tri- munincipal Project will be completed by December 1996 that will result in the removal of this pump. Again in a lett~ulated April 7, 1996, by Joseph E. Paggi I was told that phase 3A will finish towards the^Ol' 1998 (see attached letters). Now that we are nearing the end of 1998, I would like to know at what stage this plan is and when should I expect the removal of this pump. In the same letter, you ensured that the surrounding area will be kept neat, trimmed and in a presentable appearance. This did not happen, The trees have grown taller blocking the front view from my living room window and their roots are eating the grass around them, hence affecting my grass. Until the pump is removed I would like Town Of Wappinger to do something around the pump station to make it look neater, smaller, presentable, and whatever can be done to reduce the sound coming out of it. As a heart patient, it is very important for me to have undisturbed sleep and peace. I hope to hear from you soon in this regard. Thanks. Sincerely, --/. II r ( /YV1/l{ (J;lt.t-t,{,.v-" / /! ~/'l / . '-671- '-I' '7' K [~ . ' . PAGGI & MARTIN Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New Yark 12601 9 14-47 1- 7898 April 7, 1996 Mr. Tanveer Hussain 18 Bell Air Lane Wappingers Falls, New York 12590 Reference: Sewer Ejector Station Dear Mr. Hussain: At the March 25, 1996 Town Board meeting, I was instructed to draft a letter to you in response to your letter to the Town regarding the above referenced sewer ejector station. In this letter three questions are posed to the Town, and I will answer them separately below: A. The Town's plan regarding removing and dismantling this pump station are as follows. Once Phase 3A is completed, the pump station can be removed. Best guess estimate for completion for Phase 3A is 1 % to 2 % years. B. The operators of the Town sewer system, Camo Pollution Control, have made numerous efforts to keep the area surrounding the pump station neat and trim. If there is a specific request in this area, please make it to the Town. However, please note that efforts are being made to keep the area in a presentable appearance. C. As the Board indicated at their meeting, they can not compensate you because the Town has every right to be there by virtue of the easement. If there are any questions regarding the above, please do not hesitate to contact my office. Very truly yours, -7J~~ ~:h E. Paggi, Jr., P. JEP:law cc: Constance O. Smith Albert P. Roberts, Esq. Michael Tremper Joseph E. Paggi,Jr., P.E. Ernsl Martin, Jr., P.E., L.S. @ prmted on recycled paper . ~ TOWN OF WAPPINGER June 30, 1993 SUPERVISOR'S OFFICE 20 MIDDLE BUSH ROAD P.O. BOX 324 WAPPINGERS FALLS. NY 12590..Q324 CONSTANCE O. SMITH SUPERVISOR TELEPHONE: (914) 297-2744 FAX: (914) 297-4558 Mr. Tanveer Hussain 18 Bell Air Lane Wappingers Falls, New York 12590 Dear Mr. Hussain: The Town has recently received your letter regarding the pump station in your front yard. You should know that the Town and the Town Board are fully aware of the problems associated with this pump station and its installation elevation. Based on your correspondence over the years, the Town has worked hard for both a short term solution and long term solution to this pump station. The short term solution was to install a holding tank at a lower elevation than your home so that when the pump station failed or there were operational problems the flow would enter this holding tank as opposed to having the potential to backflow into your downstairs facilities. The Town Engineer and the Town Operator together drew up plans and recommended this, however at the time the Dutchess County Health Department would not approve it. The long term solution is the removal of the pump station and flow the sewage to grade to Myers Corners Road. This plan is incorporated into Phase 3-A of the Tri-Municipal Project. This proj ect, we hope, will be completed at a date no later than December, 1996. We appreciate your concern on this matter, but hope that you can see that the Town of Wappinger has been working for you in an attempt to resolve this problem for you. If you have further questions on this matter, please call CAMO Pollution Control at 229-6855 or the Town Hall at 297-2744. Sincerely,; ,} I L C7i~~C't:. t:-, /( ~~ Constance o. ~ Supervisor COS:dlh cc: Jay Paggi, Town Engineer