Loading...
042 PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors OLJ2- 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) September 9, 1998 Fi12Cf:1I1 S~ I2D cp 1 f ~l.4!tv 1998 row% SNOWD CI.€'ltk '12/11 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Cosntance O. Smith Reference: Village of Fishkill/Fleetwood Water District Interconnection Dear Supervisor Smith & Board Members: A meeting was held on September 9th, 1998 regarding the above referenced interconnection. In attendance were Jim Politi, Mike Takacs, Mike Tremper and myself. Discussed were the following items: 1. UPDA TE ON THE PUMP STA TION: · The Village of Fishkill pump station update was given by Mike Takacs. It was reported that the pump station would arrive onsite on Wednesday, September 30th, 1998. Clearing for the project should start September 10th, 1998. Mike Takacs has been advised by Sun Up Enterprises, that the permit from the Dutchess County Department of Public Works is in hand. When the pump station arrives, the concrete slab that the pump station will rest on will have been installed. All the necessary plumbing, up to and leaving the pump station will have been completed as will the new electric service. Mr. Takacs reported that the air release valve will also be installed by September 30th, 1998. · The final connections will be made immediately thereafter, which will take approximately one (1) week, with final testing to be complete within one (1) week after that. Therefore, the pump station will be online by October 15t\ 1998 baring unforeseen circumstances. 2. PIPE CONSTRUCTION: · I reported that there had been 2,498' of pipe installed, up to and including, September 8th, 1998. There is approximately 100:t' left to make the tie- in, and 225' near the meter pit, which is left out. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. DelBene. .Ir.. n:. . Hon. Constance O. Smith Town Board Re: Village of Fishkill/Fleet Water - 2 - September 9, 1998 . On September 10th and 11 th, the meter pit and pressure reducing valve pit will be installed by Nenni Equipment. The pipeline should be completed by September 15th, 1998, with testing to begin immediately. It is anticipated that the pipe will be put in service some time the week of September 21"t, 1998. . Jim Politi advised that the shut-down of the existing Village of Fishkill system near Continental Drive will be done on Thursday, September 10th, 1998, starting at 8:30 a.m., and all appropriate letter have been handed out. . The possibility of supplying the Fleetwood Water District with Fishkill water prior to the pump station being completed will be handled between Camo Pollution Control and Jim Politi. The next meeting was not scheduled. It was recommended that the following meeting should be setup sometime during the testing of the pump station, which should take place the second week in October. I would ask that Mike Takacs and Jim Politi call this office as to when they feel an appropriate date would be, and I will set the meeting up. If there are any other questions or comments, please do not hesitate to contact me. ;;:zer ruly Yours~. ~ 0, /t~ & "\. ~.~C. ~ Joseph E. Paggi, Jr., P.E. JEP:law cc: Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Albert P. Roberts, Esq. Hon. Mayor Carter Jack Railing, P.E. Michael Takacs Michael Tremper Jim Politi Greg Supple, Esq.