Loading...
043 OL/3 PAGGI. MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) RECEIVED September 10, 1998 SEP 1 4 1998 ELAINE SNOWDEN TOWN CLERK Planning Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Evergreen Estates - Section II Dear Board Members: I am in receipt of a transmittal letter dated September 1 at, 1998 from Michael Gillespie from Day, Oswald & Gillespie regarding the above referenced project. In this transmittal letter, Mr. Gillespie states that he has transmitted to our office a copy of the subdivision map last dated August 15th, 1998, and copies of deed descri ptions. I have reviewed the same, and report the following: 1. The Road Descriotion dated AUQust 1 srh, 1998: I have reviewed the description and find that it corresponds to the metes and bounds as shown on the subdivision map. I would question, however, that the description goes straight through the cul-de-sac and not around it. The cul-de-sac is described as temporary in nature. I would recommend that the description deeded to the Town go around the cul-de-sac, and a note be placed on the subdivision map that, if and when, the road is extended that the land will be abandoned to the adjacent property owners. By copy of this letter, I am asking AI Roberts what his opinion is. 2. Snow Easement No. 1 dated AUQust 1 srh, 1998: I have reviewed this easement and find that it is consistent with the metes and bounds as shown on the proposed subdivision map. There are, however, two references to temporary turn-around. I believe the word "temporary" should be stricken. 3. DrainaQe Easement No.2 dated AUQust 1srh, 1998: I have checked the metes and bounds description and find it consistent with the proposed subdivision map. However, there are two references to temporary turn- around. I believe this should be stricken. 4. GradinQ Easement No. 3 dated AUQust 1 srh, 1998: I have reviewed this description and find it consistent with the proposed subdivision map, except the word "temporary" should be stricken. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Dcl13ene. .Ir.. P.E. Planning Board RE: Evergreen Estates/Phase II - 2 - September 10, 1998 5. Snow Easement No.4 dated Auaust 1EY", 1998: I have reviewed the same and find that there are two references to "temporary" that need to be stricken. However, the description corresponds to the proposed subdivision map. 6. Drainaae Easement No.5 dated Auaust 1~, 1998: I have reviewed the same and find that there is a discrepancy between the map and the description in the length of the curve noted as 27.53'. Review of the map shows that it is drafted at 27.63'. Other than that it is consistent with the proposed subdivision map. 7. Drainaae Easement No. 6 dated Auaust 15'h, 1998: I have reviewed the same and find it consistent with the proposed subdivision map. 8. Drainaae Easement No. 7 drafted Auaust 15'h, 1998: I have reviewed the same and find it consistent with the proposed subdivision map. By copy of this letter, I am notifying the surveyor of our findings, and asking him to make the necessary revisions. I am also asking AI Roberts to render an opinion on whether or not the description should go around or through the cul-de-sac. If there are any questions or comments, please do not hesitate to contact this office. Very truly your~ a rtJ~c_, 4ifl) 'JOseph E. Paggi, Jr., P.E. JEP:law cc: Hon. Constance O. Smith, Supervisor Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Graham Foster Albert P. Roberts, Esq. Daniel Wery, AICP Michael Gillespie, P.E.