Loading...
045 DL/5 PAGGI. MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) September 15, 1998 New York State Department of Environmental Conservation Division of Environmental Permits - Region 3 21 South Putt Comers Road New Paltz, New York 12561-1696 R12CC!VED S 1;(.) f . . 1 '9 E:!"_'j. . ~ r ... VtVi\, CLf.J~ ~ Reference: Culvert Replacement DeGarmo Hills Road Town of Wappinger, Dutchess County Dear Madam/Sir: Enclosed please find the following documents submitted for the purpose of obtaining a stream bank disturbance permit for the above referenced project: 1. Form 95-19-3 (6/97)-q, Joint Application for Permit 2. Short Environmental Assessment Form (4 copies) 3. Site Location Map, Hopewell Junction Quadrangle ( 4 Copies) 4. Project Plan (4 Copies) 5. Photographs (1 set color) 6. Exhibit "N' (4 Copies). The past history of the existing 36" diameter RCP culverts, has shown that the culverts are undersized and cause water to back-up and flood surrounding properties. The drainage area tributary to these culverts is approximately 400 acres. During heavy rainfall, the headwater elevation at the culvert inlets rises to such an extent that the properties on both sides of DeGarmo Hills Road become inundated with floodwater (See Exhibit "A"). Also, DeGarmo Hills Road becomes flooded causing a dangerous situation for motorists. The Town of Wappinger has applied and will receive funding for the culvert replacement from the New York State Department of Transportation Multi-Modal Program. The proposed improvements consist of twin 4' x 8' precast concrete box culverts, precast headwalls and rip-rap aprons. The construction for this project will start with the placement of erosion and siltation control, consisting of silt fence and! or haybales, downstream of the outlet. An earth dam will be constructed upstream of the inlet to allow for bypass pumping around the project area. The pump discharge will be located just downstream of the project area, where haybales and silt fence will be set to create a sediment trap prior to the downstream channel. Ernst Martin. Jr.. P.E.. L.S. Charles R. DelBene. Jr.. P.E. Joseph E. Pa!W. Jr.. P.E. " II> N.Y.S.D.E.C. - 2 - RE: DeGarmo Hills Road/Culvert Replacement September 15, 1998 Once these items are in place, the existing headwalls and culvert will be removed. The outlet headwall will be installed and then the box culvert sections will be placed. Lastly, the inlet headwall will be installed. Medium stone fill will be placed at the inlet and outlet as shown on the plans. All disturbed areas will be seeded and mulched. The earth dam will then be removed , with the erosion and siltation control being removed once the stream flow is clear and the area stable. Final paving and replacement of the guide rail should complete the project. The total amount of excavation and fill for the headwalls and rip-rap aprons will.be approximately 50 c.y. and 15 C.y., respectively Thank you for your assistance and cooperation in this matter. Respectively submitted, ~/~~. Charles R. Del Bene, Jr., P.E. CRD:1aw cc: Hon. Constance O. Smith, Supervisor Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Vincent Bettina, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden Graham Foster