062
at
~@
PAGGI. MARTIN & DEL BE~'E LLP
Consulting Engineers & Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
91-1-471-7898
91-1-471-0905 (FA..X)
RECE\VED
JUL 15 1998
'U\-'\:rt\j\~OR't) Of~\CE
~O'NN Or W APP\NGER
July 10, 1998
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance Q. Smith, Supervisor
Referenco: F!eetvvocd Water District Water Plant Abandonment
Dear Supervisor Smith & Board Members:
As per our request for proposals dated June 10th, 1998 (COpy enclosed!. we are in receipt
of proposals from Metzger Construction Corp. and Sun Up Enterprises, Inc. The results
are as follows:
. Metzger Construction Corp. . . . . . . . . . . . . $ 12,900.00
. Sun Up Enterprises, Inc. . . . . . . . . . . . . . . . $ 29,900.00
We have examined the proposals and find the proposal of Metzger Construction Corp. to
be in order, and therefore, recommend the project be awarded to their firm.
Please note that this cost is within the parameters outlined in the Map, Plan and Report
for the Fleetwood Water District connection to the Village of Fishkill Water System. It will
be paid out of those funds.
By copy of this letter, I am notifying Metzger Construction Corp. and Sun Up Enterprises,
Inc. of our recommendations.
If there are any further Questions or comments, please do nm: hesitate to contact this
office.
:;P::;P7r
Joseph E. Pagg;, Jr., P.E.@
JEP:law
cc: Hon. Vincent Bettina, Councilman
Hon. Joseph Paoloni, Councilman
Hon. Joseph Ruggiero. Councilman
Hon. Robert Valdati, Councilman
Elaine Snowden
Albert P. Roberts. ESQ.
Michael Tremper
Metzger Construction Corp.
Sun Up Enterprises, Inc.
Joseph E. Paggi, Jr., P.E. Ernst Manin, Jr.. P.E.. L.S.
Charles R. Del 13cnc. Jr.. P.E.
,",
-
..
PAGGI &.MARTIN
Consulting Engineers & Land Surueytm
54-56 Main Street
Poughkeepsie, New York U601
914-471-7898
914-471-0905 (FAX)
*** LETTER OF SOLICITATION ***
TO: Sun Up Enterprises, Inc.
Ben Ciccone, Inc.
RGH Construction
Metzger Construction
FROM: Joseph E. Paggi, Jr:, P.E.
DATE: June 10, 1998
RE: Fleetwood Water District
Town of Wappinger
The Town of Wappinger is seeking bids from qualified Contractors to perform:
WATER PLANT ABANDONMENT - FLEETWOOD WATER DISTRICT
The main components of said work are:
;, Excavation, removal and disposal of :
. Two (2) 25,000 gallon underground water storage tanks.
. One (1) 15,000 gallon underground water storage tank.
. One (1) 5,000 gallon hydropneumatic water storage tank.
;, All tanks are steel construction. All resulting excavations shall be backfilled
with well compacted, clean fill. All fill material shall be subject to prior
approval by the Engineer.
;, Demolition removal and disposal of one (1) 22 foot by 15-foot masonry block
building with all furnishings and appurtenances, including arranging for and
abandoning existing utilities (i.e. gas, electric).
;, Excavation, cutting and capping of existing 6" diameter asbestos cement pipe
(ACP) supply main. Cap shall be restrained by means of an approved concrete
thrust block. Backfill within 12" of any water main shall be with well
compacted sand or gravel. The remaining excavation shall be backfilled with
well compacted, clean fill.
;, Furnish and install one 6" hydrant complete with gate valve, blocking,
restraint, and all appurtenances. Hydrant shall be Mueller "Centurion" or
approved equal. Backfill shall be equal to water main backfill as outlined
above. (This item may already be complete at time of plant abandonment.
Therefore, this cost should be broke out separately).
}oIcph E.I'Igi,Jr., RE.
EmIt Martin,Jr., P.E.. L.S.
@pnmHontK'fdH-.-
...-
--
or
Sun Up Enterprise, Inc.
Ben Cicone, Inc.
RGH Construction, Inc.
Metzger Construction
RE: Fleetwood Water District
- 2 .
June 10, 1998
~ Abandonment of three (3) production, water wells including, but not limiting
to, cutting, filling with an approved inert material, and capping. All well
abandonment shall comply with the applicable codes of the Dutchess County
health Department. Contractor shall be responsible for securing a permit from
the Dutchess County Health Department prior to well abandonment
procedures.
~ Miscellaneous removal items including chain linking fencing, interior piping,
valves, drain lines, building contents, driveway material, etc.
~ All areas disturbed by construction operation shall be restored to original grade
by Contractor, including 4" of topsoil, and appropriate seeding and mulching
to provide an adequate stand of grass.
All bids shall be received at the offices of Paggi, Martin & Del Bene, LLP, 54-56
Main Street, Poughkeepsie, New York 12601, prior to 12:00 noon on June 291h,
1998.
Work will be done after completion of connection to Fishkill Water System, which
is anticipated being done the first week of November 1998.
Any questions or comments may be addressed to this office.
Thank you for your time and consideration in this matter.
JEP:law