Loading...
033 PAGGI & MARTIN Consulting Engineers & Land Surveyors o 6 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) April 30, 1997 ~~ C/'.. ~ 'J'V~. . "41' 0 ,~". ~A1 (> V 'b.~1t~ ~9,.> ~1- Q'1\t, r O"~~"q~ Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith, Supervisor Proposed Combined Wappinger Water Improvement Proposed Wappinger Sewer Transmission/Treatment- Phase 3A Reference: Dear Supervisor Smith & Board Members: At the April 17, 1997 Town Board Workshop Meeting regarding the above referenced projects, our office was given various tasks to perform. The purpose of these tasks is to provide the Board and support staff with sufficient data in order to make a prudent decision concerning the format and makeup of each proposed Improvement listed above. Listed below is a summary of each task, it's purpose and content. PROPOSED CONSOLIDATED WAPPINGER WATER DISTRICT TASK I (Ad Valoruml: Draft the framework for a District that will consolidate eight (8) existing water Improvements/Districts by special act of the New York State Legislature (Central Wappinger Water Improvement, North Wappinger \/Vater Improvement, Fleetwood Water District, Wappinger Park Water District, Oakwood Water District, Ardmore Hills Water Improvement Area, Myers Corners II Water District, Cranberry Hills Water Improvement). This consolidated District will also extend water service to surrounding areas previously not served (Route 9 corridor, etc.) as well as significantly upgrade service to areas presently served. It is proposed that the consolidated district will assume all existing debt from the existing Improvements/Districts. The newly consolidated district will also construct all the necessary facilities as outlined in the Proposed Combined Wappinger Water District Report. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., 1.S. @ punted on ,ecycled pape, Constance O. Smith - 2 _ Town Board Re: Phase 3A/Combined Wappinger Water April 30, 1997 The cost of the consolidation and the District will be spread over the entire benefitted area only, and will have it's debt retired on an ad valorum basis for each parcel. TASK II (Benefit Basis): Task" is a special Legislation District with essentially the same framework as Task I, however, the cost will be proportioned on a benefit unit basis. The benefit formula we will use for this task is the current formula presently in use by the Town. TASK III (Part Town, Part Benefit): The purpose of this task is to form a district essentially the same as Task I. The costs will, however, be apportioned on a part-town, part-benefited area basis. We will make a matrix in which the part-town (Town outside the Village) pays for 1 0% -50% of the cost in 1 0% increments. TASK IV: Task IV will form a District with the same framework as Task III above, however, the existing debt will not be consolidated. TASK V: Task V will form a District that will be similar to Task I, however, there would be no consolidation of existing debt. Constance O. Smith - 3 _ Town Board Re: Phase 3A/Combined Wappinger Water April 30, 1997 SEWER: After considerable discussion regarding the proposed framework of Phase 3A of the Wappinger Sewer Transmission/Treatment Improvement, it has been decided to revise the scope of the project to areas of severe need, areas that have voiced their desire to be included within the Improvement, and areas adjacent to the existing transmission line that was constructed under Phase I and II. We will prepare a map which will attempt to identify the above areas. In preparing this map, we will consult with Daniel O'Connor of the Dutchess County Health Department, Michael Tremper of Camo Pollution Control, and our correspondences and telephone message from the last few years regarding the necessity of sewage facilities for the Phase 3A area. We will also come up with a flow that can be expected to be generated from this proposed down-sized area. At that point in time, and after the Town Board has agreed to these areas, a request can be made of the Tri- Municipal Sewer Commission regarding the necessary expansion of their facilities for this down-sized flow. We are in the process of preparing the above work and we will be prepared to make a presentation on May 7, 1997 at the Town Hall, Town of Wappinger at 6:30 PM. If there are any questions, comments, or concerns regarding the above, please do not hesitate to contact me at the office. Very truly yours, cY,.Jf'{2 Joseph E. Paggi, Jr., JEP:law cc: Hon. June Visconti, Councilperson Hon. Vincent Bettina, Councilperson Hon. Joseph Ruggiero, Councilperson Hon. Robert Valdati, Councilperson Albert P. Roberts, Esq. Antonia Lucia, Esq. Michael Tremper Thomas Rothman, Esq., Wilkie, Farr & Gallagher Elaine Snowden