039 PAGGI & :MARTIN Consulting Engineers & Land Surveyors 03Q f~:;) 0' 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) Ji f'i~ ".,./, . r " '/""D . ,... I? . ..... ~r ; ~~1. 0 199) )0 ,~ '0' . "'~ r'1 4 W-.'4J€ ....,,,1( It May 16,1997 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith Reference: Reconstruction of Myers Corners Road Dear Supervisor Smith & l30ard Members: On Tuesday, May 13, 1997, I met with representatives of Dutchess County Department of Public Works regarding the reconstruction of Myers Corner Road to Route 9 east to Henry Drive. In attendance at the meeting were John Tekben, Planning/Design Engineer, and Ed Whaler, Assistant Civil Engineer I. In general, it was discussed that the County was in the final steps of design and land acquisition for the project. There were in the middle of condemnation procedures for three (3) of the parcels for which right-of- ways are necessary to be taken. The condemnation proceedings are being handled out of County, and therefore, the timing of the proceeding is not easily defined. Due to the SHIPS funding for the project, it is necessary that certain capital improvement be made this year including clearing, grubbing, etc. It is, therefore, the Department's feeling that they will be out to bid by mid September with some work able to be done this fall. The majority of the excavation and paving work, however, will be done during calendar year 1998. As you recall, t had drafted a letter on March 20, 1996 to the Dutchess County Department of Public Works regarding certain concerns we had with respect to the newly installed transmission line for the Wappinger Sewer Transmission/Treatment Improvement. I discussed these items with the County at this point and advise them of the following: 1. It was my original contention that we will need easements granted to the Town of Wappinger to maintain the existing sewer line between Sta. 21 + 90 and 23 + 00 along the existing roadway. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. @ pllnred on ,ecycled pape' Constance O. Smith Town Board Re: Myers Corners Road - 2 - May 16,1997 We were assured by the County that if this land is abandoned to the adjacent property owners the necessary easements will be deeded to the Town at that time. I was informed that the land will not be abandoned immediately upon construction, but some years thereafter. 2. We originally had a concern regarding the realignment of the road as it placed a certain number of the newly constructed I'!lanholes in the travelled way. The County acknowledged that, and understood that we need to get to these manholes to make necessary repairs, perform the necessary maintenance, and possibly make required excavations. I explained that this line was newly constructed to highest standards, and therefore, hoped that the necessity of any excavation would be years off. 3. We had voiced our concerns about getting to some of the manholes that are now in the travelled way to perform routine maintenance such as flushing, etc. They acknowledged the fact that we need to get to these manholes, and recommended that the Town and/or system operators apply for a maintenance agreement with the County if we don't already have one. This is an annual permit that should be obtained from the County to allow us to perform our normal maintenance. 4. !t is obvious from the profiles that a certain number (4) of the existing manholes will need to be raised to be consistent with the new profile of the roadway. The methodology by which these manholes are raised will need to be in a form that will lend itself to efficient access in the future. We will survey the four manholes to determine if there is a flat slab or cone section on it. I will transfer this information as soon as it becomes available to Mr. Whaler of the Dutchess County Department of Public Works. If there is an existing cone section on the manhole, it will need to be removed to allow full and easy access to the depth that the manhole is being raised. Constance O. Smith Town Board Re: Myers Corners Road - 3 - May 16,1997 We also asked that the raising of the manholes that is greater than l' be done with precast concrete risers in lieu of bricks, blocks, etc. Any final adjustments that are necessary to bring the manhole castings to grade can be done with brick and should be mortared both on the inside and outside. Of extreme importance, is to preclude the entering of any extraneous flows in the form of inflow entering the top of the manhole. If there are any questions regarding the above, please do not hesitate to contact this office. Please note that I will be sending the information on the above manholes to Mr. Whaler as soon as we have it, and I will advise the Board when we do so. Very truly yours, 6J~ ~~1iJ Joseph E. Paggi, Jr., P.E. JEP:law cc: Hon. June Visconti, Councilperson Hon. Vincent Bettina, Councilperson Hon. Joseph Ruggerio, Councilperson Hon. Robert Valdati, Councilperson Albert P. Roberts, Esq. Michael Tremper John Tekben Ed Whaler Elaine Snowden