Loading...
041 0~CY PAGGI & .MARTIN Consulting Engineers & Land Surveyors oC/1 ....'"""" 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) ~@$JPt ASCSIII. "41' 2 'S D S~/~ 2 1991 1"ow: 8JiO~ CI.~1( 'O~Ji May 20, 1997 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith Reference: Sherwood- Heights/Road Bond Dear Supervisor Smith & Board Members: At the request of Svi Segal, we have calculated the amount of the road bond for the last two remaining sections of the Sherwood Heights Subdivision. The first section is the completion of the Sherwood Heights roadway from Lot No. 20 to Peel Lane. All the work shown below is calculated based on information from File Map No. 6611. In the first section, it is Mr. Segal's intention to build the base and binder course to obtain building permits, and bond the remainder of the work. As you know, the underground utilities (ie: sanitary sewer, water main, and storm sewer construction) were constructed years ago. The remaining items of work that need to be bonded would be the top course of pavement, curbs, backfilling the curbs, associated landscaping work, street trees, highway monuments, and appropriate signage. The construction value of this work adjusted to May 1997 construction values and increased for two years inflation at 3% is $71,300.00. It has been the practice of the Zoning Administrator's office to add 20% to the construction value to cover necessary administrative charges. This will bring the total amount of the bond to $85,560.00. The inspection fee for this amount of work is $2,560.00. The second part of the road bond calculated is for the completion of Albert Lane, as shown on File Map No. 6611. We have calculated the total construction value including all necessary items for the road construction and utility construction. These items are clearing and grubbing, rough grading, sanitary sewer, watermain construction, sanitary sewer lateral construction, water service construction, storm sewer construction, roadway foundation, roadway pavement, curbs, backfilling and landscaping, street trees, signage and monuments. Joseph E. Paggi, Jr., P.E. Ernst Martin,Jr., P.E., 1.5. @ p"nted on ft!cycled paper .. Constance O. Smith Town Board RE: Sherwood Heights - 2 - May 20, 1997 The total construction value of the work above adjusted to May 1997 construction cost and increased for two years inflation is $571,700.00. It has been the practice of the Zoning Administrator's office to add 20% for necessary administrative cost, which would equal $686,040.00. The inspection fee for this portion of the project would be $28,580.00. For the construction of Albert Lane, the Developer would have the option of paying inspection fees and compieting a portion of the work up to and including the binder course of the pavement without bonding it. At that point in time, a bond reduction could be sought and a new amount calculated for the remaining work. By copy of this letter, I am asking Mr. Segal if that might be his intention and/or request. If there are any questions or comments, please do not hesitate to contact this office. Very truly yours, g~p::~ JEP:law Enclosure cc: Hon. June Visconti, Council person w/enclosure Hon. Vincent Bettina, Councilperson w/enclosure Hon. Joseph Ruggiero, Councilperson w/enclosure Hon. Robert Valdati, Councilperson w/enclosure Aibert P. Roberts, Esq. w/enclosure Graham Foster w/enclosure Elaine Snowden w/enclosure Don Close w/enclosure Svi Segal w/enclosure . SHERWOOD HEIGHTS BOND CALCULATION SECTION I - LOT NO. 20 TO PEEL LANE ITEM QUANTITY UNIT COST TOTAL COST TOP COURSE 440 TON $ 65.00jTON $ 28,600.00 CURB 2,500 L.F $ 5.00jLF $ 12,500.00 MONUMENT 8 EACH $ 200.00jEA $ 1,600.00 BACKFILL 1,020 C.Y. $ 5.00jCY $ 5,100.00 STREET TREES 20 EACH $ 150.00jEA $ 3,000.00 TOPSOILjSEEDING 0.63 ACRE $ 8,000.00jAC $ 5,050.00 SIGNAGE 2 EACH $ 200.00jEA $ 400.00 SUBTOTAL $ 56,250.00 SUBTOTAL WjENR ADJUSTMENT $ 67,215.00 SUBTOTAL Wj3% INFLATION (2 ) YEARS $ 71,708.00 TOTAL WITH 20% ADMINISTRATIVE FEES $ 85,560.00 INSPECTION FEES $ 2,560.00 FILE MAP NO. 6611 ENR ISSUE - 05/05/97 = 5837.16 ,; ITEM CLEARINGjGRUBBING ROUGH GRADE SEWER-SANITARY OpVC PIPE o MANHOLES WATER SHERWOOD HEIGHTS BOND CALCULATION SECTION II - ALBERT LANE QUANTITY 2.12 ACRES UNIT COST $ 6,000.00jAC. $ 5.00jCY 3,200 C.Y. 1,600 L.F 8 EA. $ 50.00jLF $ 2,000.00jEA CDUCTILE IRON PIPE 1,900 L.F. o HYDRANTS 3 EACH SEWER LATERAL 500 L.F. WATER SERVICE 19 EACH STORM SEWER $ 5C.00jLF $ 2,000.00jEA $ 25.00jLF $ 1,000.00jAC o PIPE o CATCHBASINS FOUNDATION BINDER COURSE TOP COURSE BERM MONUMENTS BACKFILL TOPSOILjSEEDING STREET TREES SIGNAGE 1,650 L.F. 19 EACH $ $ $ $ $ $ $ $ $ 8,000.00jAC $ $ 24.00jLF 800.00jEA 22.00jCY 1,781 C.Y. 900 TON 550 TON 65.00jTON 65.00jTON 3,750 L.F. 5.00jLF 12 EACH 200.00jEA 1,507 C.Y. A ACRE 5.00jCY 38 EACH 2 EACH 150.00jEA 200.00jEA GROSS SUBTOTAL *NOT SUBJECT TO ENR ADJUSTMENT NET SUBTOTAL NET SUBTOTAL WITH ENR ADJUSTMENT *NOT SUBJECT TO ENR ADJUSTMENT GROSS SUBTOTAL WjENR ADJUSTMENT GROSS SUBTOTAL Wj3% INFLATION (2) YEARS TOTAL WITH 20% ADMINISTRATIVE FEES INSPECTION FEES FILE MAP NO. 6611 ENR ISSUE - 05j05j97 = 5,837.16 *NOT SUBJECT TO ENR ADJUSTMENT TOTAL COST $ 12,741.00 $ 16,000.00 $ 80,000.00* $ 16,000.00* $ 95,000.00* $ 6,000.00* $ 12,500.00* $ 19,000.00* $ $ $ $ $ $ $ $ $ $ $ $ -$ $ $ +~ 39,600.00 15,200.00 39,182.00 58,500.00 35,750.00 18,750.00 2,400.00 7,500.00 8,000.00 5,700.00 400.00 488,232.00 228.500.00 259,732.00 310,360.00 288.500.00 538,860.00 $ 571,700.00 $ 686,040.00 $ 20,580.00