P AGGI & MARTIN
Consulting Engineers & Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
9 1 4-47 1- 78 9 8
.'''''...
:~ :;:..
...... \-'
>.-...
January 17, 1995
. I. ~ {i .,'
", i (i ' ,
:~,f,::;_:,-'~
'. ;"~:'~~I~,'iE~i:
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention:
Constance O. Smith
Reference:
Road Realignment Project
Wheelerhill Road
Dear Supervisor Smith:
Upon completion of our preliminary realignment and geometric
modifications, we would like to submit our proposal and subsequent
construction costs for the above referenced project.
Due to the steep grade of the existing road starting at the entrance to
Greystone, an extensive excavation will be required to insure that the
proposed vertical realignment conforms with AASHTO and Town
Specifications. A problem associated with the extensive cut is the
existence of rock. By visual inspection of this area and the steepness of
the existing road, we can safely say that blasting will be required on this
project. The blasting will not only generate concern by the residents,
but will increase the construction cost of the project.
We have looked into reducing the amount of excavation required by
adjusting the proposed modifications. However, the resulting geometric
alignment would not comply with design standards.
Another modification included in our proposal is the widening of the
roadway pavement. The existing pavement width varies throughout the
project area from 12 to 18 feet. We have proposed a pavement width
of 22 feet, but this could be reduced to 20 feet if need be. By widening
the roadway, the existing stone walls on both sides of the road will have
to be relocated. In additions, grading outside of the road right-of-way
will have to be performed, requiring temporary grading easements.
Joseph E, Paggi, Jr., P,E,
Ernst Martin, Jr" p,E" LS,
@ primed on recycled paper
Constance O. Smith
Re: Wheelerhill
- 2 -
January 17, 1995
One last item of concern is drainage. There is an existing storm line on
the east side of the road from Greystone to the high point of the road.
At this time we are not sure of the condition of the storm line because
an inspection could not be completed without a machine to lift the
grates off the basins. However, the pipe looks to be concrete, and
therefore, should be in working condition.
We have included modification to the existing storm line along with
extending the system with new basins and ADSN-12 (plastic) pipe. We
have enclosed a cost estimate for the proposed work for your review
and comment.
In closing, the work required to brin~ the road into compliance with
design standards and specifications IS extensive. Due to the extent of
the work, many residents will have concerns, and we feel that a public
information meeting should be arranged if the Town decides to proceed
with the realignment.
/"! ,',1 /: ~ ..-'!'
At this time, we would ask to be placed on the re~ 13, 1995
Workshop Agenda for purpose of presenting our proposal to the Town
and to schedule a public meeting, if so required.
Thank you for your time and consideration in this matter.
If you have any questions or concerns, please do not hesitate to contact
this office.
Very truly yours,
~/lu~~.
Charles R. Del Bene, Jr., P.E.
CRD:law
Enclosure
ENGINEER'S CONSTRUCTION COST ESTIMATE
WHEELERHILL ROAD REALIGNMENT
EXCAVATION:
Total Cut = 4,200 CY
· Mass Rock Excavation:
Sta 11+00 to 14+00
3,000 CY @ $28/CY
· Earth Excavation:
1,200 CY @ $14/CY .
ROAD CONSTRUCTION:
Sta 10+00 to Sta 21+00 - 1,100 L.F. @ 22 Ft. Wide
· Item 4 (12") 1,100 x 22 x 1 = 900 CY
900 CY @ $30/CY (In Place) . . . . .
· Asphalt (3" Binder 2" 2'op)
1,100 x 22 = 24,200 Ft /9 = 2,700 SY @ $12.50/SY
DRAINAGE:
· 750 L.F. 15" ADSN-12 @ $27.00/LF
· 5 Precast Concrete Catch Basins @ $1800/EA
STONE WALL RESTORATION:
(Assume 3 Ft. Height, 1.5 Ft. Width)
· Sta. 10+00 to 21+00 East Side => 1,100 LF
Sta. 10+00 to 19+50 West Side => 950 LF
= 2,100 LF
2,100 LF x 3 Ft. (Ht) x 1.5 Ft. (Width) = 9,500 Ft3
Assume Machine, Operator, 2 Laborers
360 C.Y. @ $55.00 . . . . . . . . . . . . . .
LANDSCAPE RESTORATION:
(Topsoil, Seed, Mulch)
Sta. 10+00 to 21+00 - From Plan Approx. 6000 SY
· 3,000 (Topsoil, Seed, Mulch) @ $4.50/SY . . .
· 3,000 (Seed, Mulch) @ $1.75/SY . . . . . . . .
TRAFFIC CONTROL:
Approximately 3%
· Close Road, Signs, Flag Person . . .
+ 10% Contingency +
= $ 84,000.00
= $ 16,800.00
= $ 27,000.00
= $ 34,000.00
= $ 20,250.00
= $ 9,000.00
= $ 20,000.00
= $ 13,500.00
= $ 5,250.00
= S 7.500.00
$237,300.00
23.730.00
TOTAL ESTIMATED PROJECT COST = $261,030.00
PAGGI & MARTIN
54-56 Main Street
POUGHKEEPSIE, NEW YORK 12601
(914) 471.7898
JOB Wrk.L~JZ../~~
,
CALCULATED BY &0
~~u
SHEET NO.
OF
DATE
//jo/9~
, ,
CHECKED BY
DATE
SCALE
tJ 'j)a~,.JEL..L.} .(J,e,<9IG,-' '2./3 [,J~'F-.a.EJ1....J!Iu..?D.
Ht7I!';~I$)..4E~/c~ - ,,2 'IS. &)rt~~LE.tUI,l.LeD,..
912.E-Y'PPt-J.E" ../~'!s E J .:z",!~.j~ k0:}~,:~.<~,-r~~.fj A/.)1..
.. ... 4w.1Ldfl4<1l)E.I,(EY.
f CK,gaJd/hJ)l!lltE,./ -
2:?:5... ... 4)1-!'+t:~If.E/Iu...ej).
............___._.___.__.___..,...........,.-....__..___........_. ._._n_'_._________...___.__,..,."..
t 5Cril-vAtZ.TZ- 6-~i,)t1ICtlAE.L-.cl_t=.L'?.4Be:n..t:..
~..4Jtlt:t:Ue.JJll.I.-j?Q... .
~~7 . . .
~""".
"H'
fo~eA./) ~lqH~~D - 3p7C4)~H-I~f=;o.
&;/JU?L.) 'P,4/.14.'* ...) ~AT?~'~HE~H'U-I2D.
JiJrlJ/-~; €:!)l4AfC--O<f .ttue.I6"~:,3 3.'-I...h/~-x.d1""- 4.
./AJflj:)PJ.y~~. Fr=rLL6) tl!.K'
64/SLe((?Lo-r$), ~~r~J::pe..Q71-IY-' $t.j~f.A)HB3 t;JLlfJlJ- KD.
k 5u/'j?JrJ,.. g-a[,.jJ ....J. ..~.. t::L?"TH - 3 2t.$"" 4)J.!~~t..i-: ..120.
A/a. 0J .......'.:..7r~II.. ..7:; (L r 0<.- .,. i
.-- .-.,' 'I. ,: I ,I I
~ 8~u_1r, ~e.ie,- """-I:
B~/~l.EhHH:!JlAEL .~ r;it;J4, - ...~?'ijlV~I!J?kg/),
~ EAoui!-).....!?o.~~....
/0 . CD IOh;a.V 'Or.
'B ;;.a ~OY', >>Vl,).$-I) .?
~llll-ll110111~2IJ5.1~11_1....__01471.,.OolIf_'lllflllEl__
JOB
GLJ/IULLlL ~LL ,e,4.D
Z
CI?.D
1/~o/9S-
, ,
PAGGI & MARTIN
54-56 Main Street
POUGHKEEPSIE, NEW YORK 12601
(914) 471.7898
:5~?P)?&t/L
SHEET NO.
OF
CALCULATED BY
DATE
CHECKED BY
DATE
.1J1i~'!:-.eJlu... ~~
. Jv'A'zc76'&~;ldY
-.alll4-11S1of1_1"1~/_1.t&.__01411.1.,*_1UU.R& '0_
PAGGI & MARTIN
Consulting Engineers & land Surveyors
54.56 Main Street
POUGHKEEPSIE, NEW YORK 12601
[L[EUU[~:CR1 @[f uOO~~~[Kjj]Ouu~[L
(914) 471-7898
DATE
JOB NO.
9'7"'-~CJ!3 60 .
,oil
.2 I/JS-
ATTENTION
2/e8~/6
RE ~#~i.L- ~~t)
......
TO ./ ~&U,../ .~--=:(~..q",~~~
WE ARE SENDING YOU ~tached 0 Under separate cover via
the following items:
>
o Shop drawings
o Prints
o Plans
o Samples
::J Specifications
o Copy of letter
o Change order
~ ,4pOeESSe:.s
/
/~jt- r1~5
~t~
COPIES
DATE
NO.
DESCRIPTION
THESE ARE TRANSMITTED as checked below:
o For approval
o Approved as submitted
:::J Resubmit
copies for approval
>
~r your use
~ requested
o Approved as noted
o Submit
copies for distribution
o Returned for corrections
r::::J Return
corrected prints
o For review and comment 0
o FOR BIDS DUE
19 - :::J PRINTS RETURNED AFTER LOAN TO US
REMARKS
COpy TO
PIlOOUCT2lI {.-LIftC..~._Ol.11. ToOldorPHOfE10lJ.flIEH__
,,~_ _ ~... ,.'" ._~:~~~ ,e'~.