006 PAGGI & MARTIN Consulting Engineers & Land Surveyors ~~~ oorb 54-56 Main Street Poughkeepsie , New York 1260 1 9 14-47 1-7898 May 9, 1995 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Constance O. Smith Wappinger Sewer Improvement Area No.1 New Collector Line Dear Supervisor Smith & Board Members: Reference: RECEIVED MAY 1 1 1~q1 ~ERVISOR'S OFFICE TOWN OF WAPPINGER In March of 1992, I drafted a report to the Town Board listing areas within the Wappinger Sewer Improvement Area No.1 which never had a collector line constructed to be able to serve their properties. I stated in that report that the parcels would be able to receive treatment service once the Tri-Municipal Expansion is complete. Therefore, the necessity for the construction of the collector line would become increasingly more important. As you know, the completion of the Tri-Municipal Expansion is approximately 14 (fourteen) months off, and therefore, I think the subject should be raised again. I have enclosed a copy of the March 30, 1992 report for your review, and will make myself available to discuss it at any subsequent workshop. Very truly yours, ~(yr~ Joseph E. paggi, Jr., P.E. JEP:law Enclosure cc: Albert P. Roberts, Esq. JosephE. Paggi,Jr., P.E. Ernst Martin, Jr., P.E., 1..5. RECEIVED MAY 1 7 1995 ELAINE SNOWDEN TOWN CLeRK @ prmted on recycled paper PAGGI & MARTIN Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New York 1260 I 914-471-7898 March 30, 1992 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Wappinger Sewer Improvement Area No. 1 New Collector Lines Dear Board Members: As you recall at the January 27, 1992, Town Board' meeting, we were instructed to research Mr. Hank Cuatt's request as to when he would receive sanitary sewer service to his property on Old Hopewell Road. As you know, this is one of the parcels in the original Wappinger Sewer Improvement Area No.1 that never had a collection system constructed In front of it. At that point in time, I made a request to Mr. Thomas Logan, Town Assessor, to provide to us a list of all properties that fell into that category so that we could write a comprehensive report. This would allow the Town Board to review all the necessary work at one time. As you know, once the Tri-Municipal Expansion is complete in December of 1995, these people will be able to tie-in to the system, as the treatment capacity would then exist. Mr. Logan furnished me with a list of the property owners on February 11, 1992. I have enclosed a copy of that list for your review. As you can see, there are numbers in parenthesis located to the right of each property, I will refer to these properties by that number elsewhere in this letter. Parcel Nos. 1, 2, 3, 4, and 5 are residential and commercial parcels located on the north side of Myers Corners Road, just west of Roberts Lane. They were included in the original boundaries of the Wappinger Sewer Improvement Area No.1, but never had access to a sewer collection line. Joseph E. Paggi,Jr., P.E. Ern51l\hrtin, Jr., r.E., L.S. March 30, 1992 Page Two Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Wappinger Sewer Improvement Area No.1 New Collector Lines After the Tri-Municipal expansion is complete and the treatment capacity exists, they will be able to tie directly into the prop.osed trunk line that will be constructed along the north side of Myers Corners Road. That line will be designed to such an elevation to allow them to tie directly into it. Construction of this line will be complete prior to the plant expansion. Therefore, when the expansion is complete they will be able to receive immediate service. . Parcel Nos. 6 and 7 will be able to tie directly into the existing collection line on Cedar Hill Road. To the best of my knowledge, Parcel No.6 is already hooked in. This should be verified by the Sewer Billing Department. Either way, when the treatment capacity exists they will be able to receive service without any additional work. Parcel Nos. 8, 9 and 18 are existing residential parcel that exist on the south side of Hopewell Road. They were included in the original boundaries of Wappinger Sewer Improvement Area No.1, however, do not have a collection line built in front of them. There is presently a collection line that is located just west of the Eck Road/Hopewell Road intersection. This main would need to be extended in a westerly direction approximately 500 feet to serve these three (3) parcels. Obviously, there would be a capital cost associated with this work. It is estimated that construction cost could be in the neighborhood of $50,000.00. However, it could only be accurately calculated based on an in-depth engineering study. If the Board wishes, we could start and prepare this study to provide the Board with a more precise number. March 30, 1992 Page Three Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Wappinger Se~~r Improvement Area No.1 New Collector Lines Parcel No. 10 is a large parcel located on the west side of Cedar Hill Road. This parcel, when developed, could tie directly into the existing collection line on Cedar Hill Road. This could be done when the treatment capacity exists in December 1995, and would be done by the Developer of the parcel. . . Parcel Nos. 11, 20, and 21 are residential properties located on the south side of Hopewell Road, ,'ust east of Kendall Drive. To provide a collection line for these three 3) parcels would necessitate extending an existing collection line southerly on Kendall Drive, approximately 400 feet to the intersection of Hopewell Road. There the collection line would need to cross Hopewell Road and proceed easterly approximately 400 feet. Obviously, there would be a construction cost associated with this work. The construction cost Is estimated to be In the neighborhood of $95,000. Only after an in-depth engineering study could a more precise number be given to the Board. If the Board so desires, we could prepare a study and provide you with that number. The above parcels (Nos. 11, 20 and 21) could tie Into the Kendall Farms system assuming that they tie-in as Individual lots only. There is an existing pump station In Kendall Farm which lifts the sewage up to the existln~ trunk line on Spook Hill Road. On the surface, it would appear that thiS pump station has the capacity for three (3) individual homes. If either Parcel Nos. 11, 20 or 21 were further developed, it would need to be determined whether or not the existing pump station has the capacity to handle that development. It would appear that the potential for a large development of these three (3) parcel Is not of that great. Again, on the surface It would appear that this pump station could handle some minor increase flow. Obviously, this would need to be looked at in an in-depth engine~rlng report. March 30, 1992 Page Four Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 . Reference: Wappinger Sewer Improvement Area No. 1 New Collector' Lines Parcel Nos. 12, 13, 14, 15, 16 and 17 are parcels located on the north side of Myers Corners Road, near the intersection of Kent Road. Parcel No. 12 could have its own lateral constructed in a southerly directio.n across Myers Corners Road to the existing collector line. This could be done for approximately $10,000.00. Again, I would like the opportunity to do an in-depth study betore giving the Board a precise number. However, tor budgetary purposes I think the above would suffice. Parcel Nos. 13 through 17 are occupied residential parcels located off a private right-ot-way ,'ust east of Kent Road on the north side .of Myers Corners Road. A co lector line will need to be installed across Myers Corners Road in a northerly direction, and the appropriate trunk line would need to be constructed up the private right-of-way to be able to serve these parcels. An easement would need to be obtained trom the owners of the right-ot-way prior to this. The approximate construction value of this work is $65,000.00. Please use this number tor budgetary purposes only. A more precise number could be submitted to the Board after completing and in-depth study of the area. Parcel No. 19 could tie directly into the existing and/or proposed collection lines that exist or will exist on the northerly end ot Cedar Hill Road. These lines exist now or will be built during the construction ot the Rockingham Force Main Project. These lines will be ready prior to the treatment plant expansion, and theretore, no capital work will need to be done to serve thIS parcel. March 30, 1992 Page Five Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Wappinger Sewer Improvement Area No. 1 New Collector Lines . As you can see from the above, there are four (4) individual construction projects that would need to be done to allow these parcels to hook into a collection line when the treatment capacity exists for the Wappinger Sewer Improvement Area No.1. The remainder of the parcels either have a line in front of them, or will have availability to a line with the work proposed under the transmission portion of the project. The estimated construction value of the four (4) separate projects listed above is $220,000.00. A more detailed estimate could be provided to the Board upon an engineering study. This detailed estimate will not only ioclude the construction costs, but also the necessary engineering, surveying and legal costs that will be attributed to doing this work. The purpose of preparing this preliminary report at this point in time is to give the Board enough information to make the appropriate decision, so that when the treatment capacity exists these residents will have a collector line in front of them and give them the ability to utilize the municipal system. I would recommend that the Board schedule a special Workshop for this item to discuss it. I would be more than happy to answer any questions that the Board has at that point in time. March 30, 1992 Page Six Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Wappinger Sewer Improvement Area No. 1 New Collector .Lines If there are any comments, please do not hesitate to contact me. ~r~, ~!)/~ Joseph E. Paggi, Jr., P.E. JEP:law Enclosure cc: Albert P. Roberts, Esq. w/enclosure Elaine Snowden, Town Clerk w/enclosure Mike Tremper, Camo Pollution Control w/enclosure Tom Logan, Town Assessor w/enclosure TOWN OF WAPPINGER 20 MIDDLE BUSH ROAD P.O. BOX 324 WAPPINGERS FALLS. NY 12590-0324 ~=~ i.-.. '~.3.;~.~~) l\;<~~.~ \~~~.-' "",,:,"::,":"'~j ~ C ".-. .., /":),,.A.. ~~~ THOMAS E. LOGAN ASSESSOR (914) 297.8275 February 11, 1992 Town Board Town of Wappinger With regard to the attached letter, please be advised that the parcels listed below would appear from our records, which were developed by Camo and the Town Engineer, to be within Central Wappinger Sewer Improvement but do not have access to connecter lines: 6157-02-858982 - Stach (1) 6157-02-884982 - Merritt (2 ) 6157-02-899988 - R.B. Hettinger ( 3 ) 6157-02-911995 - Pace ( 4 ) 6158-04-894014 - Adams ( 5 ) 6256-01-372935 - Ma r1na (6 ) 6256-01-405947 - Marma (7) 6257-03-030434 White (8 ) 6257-03-058429 - Zbacnik (9 ) 6257-03-247036 - Cedar Hill Development (10) 6257-03-360357 - Cuatt (11 ) 6258-01-205193 - Buckley (12 ) 6258-03-236217 - Fitzpatrick (13) 6258-03-23/249 - Canter (14) 6258-03-240275 - Tobias (15 ) 6258-03-264246 - RogaIl (16 ) 6258-03-277279 - Pizzagalli (17) 6257-03-044432 - Wetterrotl. . (18) 6257-03-322367 - Maiolo (19) 6257-03-387375 - Pearson (20) 6257-03-389365 - Conklin (21) Very truly yours ~i~essor cc: Jay Paggi, Town Engineer' Albert P. Roberts, Town Attorney