Loading...
017 , ~ /I Y' . ~{,;VV PAGGI & MARTIN Consulting Engineers & Land Surveyors 01' oya 54-56 Main Street Poughkeepsie, New York 1260] 914-47 1-7898 December 21, 1995 RECEIVED DEe 2 7 100; StJPERVISOR'S OFFICE TOWN OF WAPPINGER Town Supervisor Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Reference: Constance O. Smith D'Albro/Widmer Road Dear Supervisor Smith: As a result of the office meeting of December 21, 1995 with Mr. John D'Albro and Mr. Val D'Albro, the following items were discussed and were agreed to be part of the potential right-of-way agreement between the D'Albros and the Town of Wappinger. The purpose of the right-of-way agreement would be to allow the Town to acquire the necessary property to perform the Widmer Road reconstruction as previously detailed. The items brought up by the D' Albros, and agreed to by the Town are as follows: 1. The runoff from the improved roadway will be channeled to the existing catch basins on both the north and south side of Widmer Road. 2. The erosion or the finished slope will be kept to a minimum. It will be lessened by maintaining a 1:3 side slope and immediat~ly stabilizing the freshly excavated earth with seeding. 3. The roses that exist along the front of the property will be transplanted along the new right-of-way. This will be done prior to any construction by a reputable nursery men and will be included as part of the construction work. Joseph E. Paggi,Jr., P.E. Ernst Martin, Jr., P.E., L.S. ro.. ~~ printed on recycled paper y- . Constance O. Smith RE: D'Albro/Widmer - 2 - December 21, 1995 4. The topsoil that will be used for the restoration work on the 0' Albro property will be clean and hand raked so that it will be mowable by the 0' Albro's in the future. 5. Although the presence of rock is unavoidable, we will try to avoid blasting. If not, all blasting operations will follow standard procedures, includin~ using seismographs and having the blastef'sinsurance company take a pre-blast inventory of the D'Albro's property (house). 6. The grade of the shoulder in the fill section for the 0' Albro house will have a grade no greater than 1 :3. The possibility of slope easement to maintain this grade might be necessary. 7. New apron for the existing D'Albro driveway will be built approximately 20' off the edge of the new pavement. 8. The two front properties pins will be staked by the Engineer to the Town by using metal rebars. 9. The Town will provide an appraisal of the land to be given to the Town for the 0' Albro's use. If there are any questions or concerns, please do not hesitate to contact this office. Very truly yours, ~cct~(J;W Joseph E. Paggi, Jr., P.E. JEP:law cc: Albert P. Roberts, Esq. John D'Albro, 59 Widmer Road Charles R. Del Bene, Jr., P.E.