PAGGI & MARTIN
Consulting Engineers & Land Surveyors
g!J~
54- 56 Main Street
Poughkeepsie, New York 12601
9 1 4-4- 7 1- 7 8 9 8
September 17, 1996
r~ '. -
ti i-., ~,! ~:r
I.o~\:/--.;,;,II
~"~f If 1"--1 ,
'*~W'
C' "'..
..):-~ It .~
~JFi~';rj:: -I~:" )~i~i
1(':'<<' ~ "-"'100;..,;:''''''-
"-': ..\, (-"'::";'':'/,.,:-,.' I ~~C
'-I . "'~.."'j-,,;,:i:'.j'EP
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Reference:
Constance O. Smith
Atlas Well Field
Attention:
Dear Supervisor Smith:
As discussed at the September 9, 1996 Town Board Workshop meeting
regarding the Atlas Well Field, enclosed please find a proposal from
Leggette, Brashears & Graham, Inc. regarding Test Well Drilling
Program and Production Well Drilling.
I have also enclosed two (2) copies of the "Quick Start Contract" for the
Board's review and signature if desired.
The proposal breaks down the work into three (3) specific areas:
o Phase I - Test Well Drilling Program
o Phase II - Production Well Drilling
o Phase III - Well Redevelopment
It is our recommendation that the Phase 1 - Test Well Drilling Program
be started at the present time to determine the most advantageous
locations to drill the water supply wells at the Atlas Well Field. At that
point in time, the Production Well Drilling (Phase II) process could begin.
The Town might want to consider authorizing the design of the
production well at the present time along with the additional work
necessary for the preparation of bid documents for the well.
I think getting one (1) well constructed 'and in production would give us
some very good data on how the well fields will perform while stressing
it with the properly designed and maintained facility. .
Joseph E. Paggi,Jr., P.E,
Ernst Martin, Jr., P.E., L.S.
@ printed on recycled paper