018 PAGGI & MARTIN Consulting Engineers & Land Surveyors -gj} 54-56 Main Street Poughkeepsie, New York 12601 9 1 4-47 I - 7 8 9 8 September 23, 1996 Town Board Town of wappinger P.o. Box 324 Wappingers Falls, New York 12590 Reference: Rockingham Drainage Improvements Dear Board Members: On September 23, 1996 bids for the above project were received. Bids were opened at 11:00 A.M. by Sandy Kosakowski, Deputy Town Clerk, and read aloud by Town Supervisor Constance o. Smith. Bid results are as follows: CONTRACTOR BID AMOUNT . . Cal Mart Construction $ 1,085,075.00 I Ramada contracting $ 1,088,955.00 Parsippany Construction $ 1,131,11.1.00 Alexandra Development $ 1,183,202.00 Ben ciccone, Inc. $ 1,252,857.00 Oilash contracting $ 1,299,060.00 Schultz Construction $ 1,363,859.00 Brennan Construction $ 1,392,409.00 Zeal, Inc. $ 1,572.997.00 BMJ Construction Co. $ 1,757,280.00 Sun Up Enterprises $ 1,996,800.00 J,*phE. Paui,Jr., P.E. Em. Martin, Jr., P.E., L.S: @ printed DnteC'fdH".,., Town Board RE: Rockingham - 2 - September 23, 1996 The apparent low bidder is Cal Mart Construction, Corp. in the amount of $1,085,075.00. We have checked the bid from Cal Mart, and find all appropriate forms signed and the bid to be mathematically correct. As you recall, the original estimate for this contract was $986,000.00 done by this firm in January 1996. During the design/development phase of the contract there were certain items added to the job that have necessarily increased the cost. If I use the units used by Cal Mart in their bid, the following items are additional to what was estimated last January. o 2,000 Yards of Rock Excavation - $50,000.00 o 5'-6' Ht. White pine - $2,400.00 o Stockade Fence - $18,200.00 o Drainage structure #8 - $ 6,000.00 This is summed up at $76,600.00. If the above amount is added to the original estimate'you come up with a $1,062,600.00. This amount is within 2.1% of the bid amount. We, therefore, recommend that the low bid of Cal Mart Construction Corp. be accepted in the amount of $1,085,075.00, and that the contract be executed subject to the filing of an acceptable Performance Bond and insurance documents. We further advise that the amount of rock estimated for the contract is 5,500 yards. As in my previous letter of August 29, 1996, the amount of rock that will be encountered is unknown at this point in time, and the amount that was placed in the contract was based on our local knowledge of the area. If the amount of rock excavated comes in over the amount estimated, then the total project cost will increase. Conversely, if the total amount of rock excavated comes in under the amount estimated, then the total project cost will decrease. This is an important item to keep in mind and have a contingency budgeted for. . Town Board RE: Rockingham - 3 - September 23, 1996 If there are any other questions or comments, please do not hesitate to contact this office. Very truly yours, /) flYJL F ~f~ Joseph E. paggi, Jr~L-P.E. JEP:law cc: Albert P. Roberts, Esq. Ann Buckley Graham Foster