October 28, 1996
Town Board
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Constance o. Smith, Supervisor
Reference: Fleetwood Water District
Water Supply Alternative
Dear Supervisor Smith & Board Members:
As per your request, our office has performed an analysis
of various alternatives of supplying the Fleetwood Water
District with a stable water supply. This analysis was
performed due to the continued deterioration of the
existing Fleetwood wells and the necessity to truck water
on a daily basis during periOds of warmer weather.
The intent of the analysis was to provide the framework
for the Town Board to make a decision as to which
direction to pursue. The numbers and costs listed in
this report are a result of desktop analysis and are
within the accepted range of accuracies.
Please note that all benefit unit calculations are based
on the parameters stated in the appropriate section, and
will be subject to verification by the Assessor's office.
The six (6) alternatives that we will discuss in this
report are listed below.
ALTERNATIVE NO.1 (Fishkill):
This first alternative proposed is a connection to the
Village of Fishkill Water Distribution System located on
Osborne Hill Road.
Joseph E. Paggi,Jr., P.E.
Ernst Martin, Jr., P.E., L.S.