007
..
n
\ \..9 !
?; YPAGGI & MARTIN
J Consulting Engineers & Land SUnJeyors
54- 5 6 Main Street
Poughkeepsie, New York 12601
9 1 4-+ 7 1 - 7 8 9 8
007
RECEIVF:l
October 18, 1991
OCT 2 2 1991
Building Inspector
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
ELAINE SNOWDEN
TOWN CLet1K
Attention:
Tim Classey
Leonard Parcel
Lookout Point
Reference:
Dear Tim:
As an outgrowth of the October 15, 1991, Town Board Workshop
meeting relative to the above subject parcel, please be advised of the
following:
1 . It would appear that the existing water booster station has
sufficient capacity to at least marginally support this one
parcel. Therefore, I would recommend that the Certificate of
Occupancy could be issued for this one parcel prior to the
completion of the proposed booster station. However, it
would be my opinion that no Building Permit and/or
Certificate of Occupancy for additional parcels be issued until
the new booster station is complete.
I would also recommend that Camo Pollution Control monitor
the existing booster station to make sure there is adequate
pressure at the Leonard residence.
2. With respect to the safety condition regarding the telephone
pole within the confines of existing pavement, I would
recommend that Mr. Gatanis adequately barricade the
telephone pole until it can be removed.
I would also recommend that certified documentation be sent
to the appropriate utility company by both the Developer and
the Town to try and speed up removal of this pole.
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
..
October 18, 1991
Page TwO
Building Inspector
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Tim Classey
Reference: Leonard Parcel
Lookout Point
3. I would further recommend another sit down meeting with
Mr. Gatanis and his people to try and Qet a realistic schedule
for completion of this work. The existmg work that has
been done is eroding as time goes on, and the situation is
just getting worse and not better. I do not want to put the
Town in position of being behind the eight ball again, and
therefore, I would recommend doing whatever necessary to
insure that Mr. Gatanis completes this work in a timely
manner.
With the above in mind and the temporary safety measures taken
around the telephone pole, I would think it appropriate to issue the
Certificate of Occupancy for the Leonard residence.
If there are any questions or comments, please do not hesitate to
contact me.
Very truly yours. /2." 17 ;
,0f~~~ c 7 ~cJ€)
'-.-"','
Joseph E. Paggi, Jr., P.E.
JEP:law ,,- I I
cc: Town Board c...c.. I 0 J~ '1)
Graham Foster
Albert P. Roberts
Mike Tremper
PS: Please disregard previous correspondence dated October 16, 1991.
A typographical error was made on Mr. Gatanis's name and it
appeared !Is Mr. Catanis.
~
'"
..
"
PAGGI & MARTIN
Consulting Engineers & Land Surveyors
54-56 Main Street
Poughkeepsie, New York 12601
9 1 4-47 1- 7 898
October 16, 1991
b
RECE~VED
OCT 2 1 1991
ELAINE SNOWDEN
TOWN CLERK
Building Inspector
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention:
Tim Classey
Leonard Parcel
Lookout Point
Reference:
Dear Tim:
As an outgrowth of the October 15, 1991, Town Board Workshop
meeting relative to the above subject parcel, please be advised of the
following:
1 . It would appear that the existing water booster station has
sufficient capacity to at least marginally support this one
parcel. Therefore, I would recommend that the Certificate of
Occupancy could be issued for this one parcel prior to the
completion of the proposed booster station. However, it
would be my opinion that no Building Permit and/or
Certificate of Occupancy for additional parcels be issued until
the new booster station is complete.
I would also recommend that Camo Pollution Control monitor
the existing booster station to make sure there is adequate
pressure at the Leonard residence.
2. With respect to the safety condition regarding the telephone
pole within the confines of existing pavement, I would
recommend that Mr. Catanis adequately barricade the
telephone pole until it can be removed.
I would also recommend that certified documentation be sent
to the appropriate utility company by both the Developer and
the Town to try and speed up removal of this pole.
Joseph E. Paggi,Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
;
.'
October 16, 1991
Page Two
Building Inspector
Town of Wappinger
P.O. Box 324
Wappingers Falls, New York 12590
Attention: Tim Classey
Reference: Leonard Parcel
Lookout Point
3. I would further recommend another sit down meeting with
Mr. Catanis and his people to try and Qet a realistic schedule
for completion of this work. The existing work that has
been done is eroding as time goes on, and the situation is
just getting worse and not better. I do not want to put the
Town in position of being behind the eight ball again, and
therefore, I would recommend doing whatever necessary to
insure that Mr. Catanis completes this work in a timely
manner.
With the above in mind and the temporary safety measures taken
around the telephone pole, I would think it appropriate to issue the
Certificate of Occupancy for the Leonard residence.
If there are any questions or comments, please do not hesitate to
contact me.
Very truly yours,
dCQ~ ~,jh/rJ2
Joseph E. Paggi, Jr., P.E.
JEP:law
cc: Town Board
Graham Foster
Albert P. Roberts
Mike Tremper
c-c 1/ Pxl 101.).1 f Cf'(