Loading...
Thomas Connors ~ # . W', August 10, 1990 Supervisor Connie Smith Town of Wappingers Town Hall P.O. Box 324 Wappingers Falls, N.Y. 12590 ," i L "~'::-:l p'~.:-. '.. ~(:)).\< , i . Ii ... ,~.-." Pill 1 7. 90 Re: Sewer backup at 13 Pippin Lane , " '" '~...l ,...;.",..1 Dear Mrs.Smith: Please excuse the delay in getting these bills to you, but because of business commitments I have been out of town for the past few weeks. The first set of bills are for the damages to the basement caused by the June 2nd sewage backup (refer to Camo letter dated June 8th). Enclosed are bills for the plumber, the sanitizing work needed for the basement as well as a list of the items which were ruined by the sewage overflowing the sink. The sewer water splashed onto 3 cases of Coke and 2 cases of Caronna beer which were located near this area along with ruining 2 Nintendo tapes located in a box on the cellar floor. The worker for the sanitizing service recommended that the soda and beer not be used as sewage would remain on the bottles unless they were boiled for a period of time. The soda was purchased-for $6.00 per case, totaling $18 and the beer was $24.00 per case, totaling $48.00. The two Nintendo tapes ruined were: "Bases Loaded" purchased for $35 and "Tetris" purchased for $50.00. While Dare Fitzpatrick was inspecting the damage, he agreed with our plumber, Jim Beyer, that we definitely could not live like this since the second sewer backup occurred so quickly after the first and ~i~bQ~~ 2D~ ~2rDiDg to the pumping station area, due to the fact that the blockage is .somewhere in the middle of Russet Lane and didn't reach the station to set off the alarm. Mr. Fitzpatrick informed us that Camo Pollution was trying to work out an arrangement with the Town of Wappingers whereby Camo would come in with one of the town sewer trucks and flush out the pipes on either a monthly or bi-monthly basis. However, since this plan was still in the "talking stages" at the time and Mr. Fitzpatrick could not even guess as to when this would be initiated, there was no way we felt , - . . we could wait due to the fact that the backup was now occurring so frequently and without warning. On June 6, 1990, Jim Beyer Plumbing raised the sewer pipe leading from the house to the main approximately three (3) feet and installed a gate valve in the cellar for further protection and security for whenever we are away for extended periods of time. The bills we are enclosing are for the main work associated with the town blockage and do not include the substantial amount of money and time it has taken for landscaping, seeding, watering, etc., along with the cancellation of our summer plans due to the expense we have had to absorb because of the town's sewage backup problem. We request that the Town of Wappingers pay the enclosed costs, since as stated earlier, this is a recurring town problem on Russet Lane as confirmed by both Mr.Beyer and Mr. Fitzpatrick on both occasions. If you have any questions in reference to the above, please feel free to contact us at any time. ~~:/e~ Thomas .con~~ ~nors ~ JIM BEYER PLUMBING & HEATING & Pump Service Box 101 Rte. 2 Clove Valley Rd. LaGRANGEVILLE. NEW YORK 12540 Phone 724-5265 PREVIOUS ~ BALANCE , ,..,/, '" ~u NT'{p.~;~XN]~~N'ANCEGO. . /. WMF'iNCLRS rnlS, NEIIV YORK 12590 ..:,/ (914) 297-1633 // ,. r ~NVOfCE 1 I UST MER'S R N, I ! +. ~ <.... NAME ..u.................h....... ......................., ADDRESS ..........UC:.Qt:/.A/.9.I.{.U.~.... 13 I, 1--" ./ mm(uu?'/;''/'?!'''.,':'.: u.m.~~u<?u'Y.~:muum.m tJ/'l,,) ;), f:J / / .S .' I'/- v. QTY. DESCRIPTION PRICE AMOUNT uu.m..ummuu~!i'~/u~futl.' u.u/;{'}(j:<~/fL . ~. I I .... t:....::.:/. ~..r:~~~..'~~!.:. .:.<~~~..(?..~.:'m~:t~.~ I .+m I #' muuf'~ .-.-:/ c': C u AI r J.J/'-} i '''' ~~ I (. .mf.lu':'.~;~!'..l". I UUmu umu. m.mmm'l J. I :s' m.E :'./~/~.(.~, I .........0.~..... ..m..... b il r (:~:~...~~..~.~.:..~=:!.~.~.l.....~... ~~.~...;:~,.....(.~~~...::::.E..~;/~~'': / ....................................,............... ................................................................... ........................................ ,,'1.) V~1 .: oj /-';--1 u..u..J.!,;,:... ..0 uu.mu.Lumm.....umu (t ..~.~~.~..~..:~..........{~~(!.f..~~~..~:~.... I hhU.WhU'j I .whwI ......f::. ~.;:/.~::'!..:~~~~ .':..!:.~.~.:.~7...J~~~ I Uh..muu.h.... u'h...u...mwmlhmhh I I ..mwl I .h!hUUh..hU.U.U... 15o..II:!.d HUUWhHUt:~1 J "// / ( , .mw/:i.:'.]l.J:-:::.h:(,.f.'!!..l_.;/I~i../.h u'''hf'.;./tuu :u'f ................................. .....~~.C_.:</........~ :.:~..<~.I.......::~~r~..:.I.:;.....~:~:~. .f-' i,' ,I I,':i ,~~./'" ~..... . RECEIVED BY I H.HUhH,,, . u..muu... uu.uj TAX I :1' y \, TOTAL /t.O, 4081 All claims and returned goods MUST be accompanied by this bill, CJnank C}bu // ;/ >/ ~//./ .r/ /' /#ft'(BEYER PLUMBING & HEATING .. & Pump Service Box 101 Rte. 2 Clove Valley Rd. LaGRANGEVILLE. NEW YORK 12540 Phone 724-5265 ~ seiP€.rz. q-- e.... o . 10 Order PItONE IOU fREE I + 8OIJ.22~J30 i I ! ~ j 1 I I 1 I 1 1 ..1 ! I j \ I \ 1 I I I \ . I I 1 j i \ ~ ; ..-~_...... . - \ '\........ R.F.B. TRUCKING Land Clearing & Drainage ~ New Septics & Repair A.D. 2 BOX 506 PAWLING, NY 12564 (914) 855-5610 To 'l'homaa & Judi th Connors Dote June 6 19 90 Address 13 Pi~t>in Lane HapDingers l-'alls, N.Y. 12590 Deliver to VIA I TERMS I REQUISITION NO. I DATE WANTED QUANTITY DESCRIPTION UNIT PRICE AMOUNT Backfill & T..Iabor for Sewer line ditch & backfillin~ ;620 00 PURCHASE ORDER NUMBER MUST APPEAR ON INVOICE, ACKNOWLEDGEMENT, CORRESPONDENCE, BILLS OF LADING, TOTAL .~620 00 PACKING SLIPS, CASES OR BUNDLES. o 0 0 0 51 By POLLUTION CONTROL, INC. Operation of Water and Wastewater Treatment Systems "Complete Analytical Testing Capabilities/NEW YORK ST A TE APPROVED LABORATORY" 367 VIOLET AVENUE POUGHKEEPSIE, N.Y. 12601 (914) 473-9200 FAX 914-473-1962 March 20, 1990 Constance Smith Town of Wappinger Town Hall P.O. Box 324 Wappingers Falls, NY 12590 Re: Sewer back-up at Conners Residence, 13 Pippin Lane Dear Supervisor Smith, On Saturday, March 17, 1990, Camo Pollution Control personnel received a call from the New Hackensack Fire Dept. of a sewer back-up at the Conners residence, 13 Pippin Lane. Camo personnel responded to the call and alleviated the overflow into the residence. The blockage in the main was then cleared with the Town of Wappinger Highway Department Vactor truck. Proper flow through of the main was then assured. Prior to the arrival of Camo Pollution Control personnel on the scene, sewage had backed up into the house causing damages to the basement. If you have any questions on this matter you may contact our office at 473-9200. Sincerely, Camo Pollution Control, Inc. D~~~ Vice President Maintenance Division DF:cmf cc: Conners - Pippin Lane Wappingers Falls, N.Y. 12590 rvm 2 2. 90 r". - ..<..> '......101 v ""~__"""