Dare Fitzpatrick, 9 Pippin Lane
POLLUTION CONTROL, INC.
Operation of Water and Wastewater Treatment Systems
"Complete Analytical Testing Capabilities/NEW YORK STATE APPROVED LABORATORY"
367 VIOLET AVENUE
POUGHKEEPSIE, N.Y. 12601
(914) 473.9200
FAX 914.473.1962
March 20, 1990
Town of Wappinger
Town Hall
P.O. Box 324
Wappingers Falls, N.Y. 12590
Re: Sewer back-up at Marsala
Residence, 9 Pippin Lane
Dear Supervisor Smith:
On Saturday, March 17, 1990, Camo Pollution Control, personnel received a
call from the New Hackensack Fire Dept. of a sewer back-up at the Conners
residence at 13 Pippin Lane.
Camo personnel responded to the call and alleviated the overflow. At this
time, Mr. Marsala from 9 Pippin Lane, came over to one of Camo Pollution
Control personnel and told him that he was also having sewage backing up into
his house. The blockage in the main was then cleared with the Town of Wappinger
Highway Department Vactor truck. Proper flow through of the main was then
assured.
Upon investigation of the Marsala residence, it appeared that the
basement had been severely damaged by sewage.
If you have any questions on this matter, you may contact our office at
473 -9200.
Sincerely,
Camo Pollution Control, Inc.
~~~.
Dare Fitzpatrick
Vice President
Maintenance Department
DF:cmf
cc: Marsala - 9 Pippin Lane
Wappingers Falls, N.Y. 12590
fv1IJR 2 2. 90
i._...~ ~~~~" ,; '- ."____"'"