PROJECT: aJ4Pr'/AJ6EJe ToWI>.J I-IAI..l.-
(name, address) HIJ:X:>'-EBUS!-J. ROAP
WAPPIIJGER.S FAU.S N. ~
TO (Contractor) ·
Ie. B. S,eAJ,u 8 SoU ,IDC..
3'2Q M~c$iE.J:.. ROAo
PD. Box 3?>9 tD
L.!ouGJ.lJ:..eEr>Slc. I/J.y' I'Z (po3
CHANGE ORDER NUMBER:
.. .~
.,. :
I ARCHITECT'S PROJECT NO: (P'?D6
CONTRACT FOR: J-/VAG L-JoR.x:..
.J CONTRACT DATE: S AhvEMseJe Iref
You are directed to make the following changes in this Contract:
ADO: PROlhoG AAJD I~S1Al.,l.,G/bIrlT (f:>) Fl/cG- D/JIvIPeRS Pee
ca. STeAlN JJAJo c;oA.J, JDC. PR.O~5A(' of FeB 25) Iq~r;)
A71AGJ.JGO.
'Ool....
;.
Tl\e original Contract Sum was . . . . . . . . . . . . . . . . . ., . S Z q G,. 4- ~O. DO
Net change by previous Change Orders . . . . . . . . . . . . . . .. . S 0.00
The Contract Sum prior to this Change Order was. . . . . . . . . . . ., . s 'Zq~,4-(PO.OO
The Contract Sum will be (increased) (Sli~ru3r:el) (IlIRC;'8I'1gull by this Change Order. . S J I 353.00
The new Contract Sum including this Change Order will be . . . . . . . .. . S Z '17. ~I 3 .00
The Contract Time will be (iFlEruud) (dli~rli.iUlid) (unchanged) by ( - ) Days.
The Date of ComplellOn as of the dale of this Change Order therefore is 8 AJOIle.H~Ete. J~~S
.
.,
ARCH mCT J-IA"'~::::> 4- t='.t:.KAAJ AssCG. CONTRACTOr.B. STeA IN ; ~ ,1JJC .
Address 32/ HA-fA..J MALL. Aaaress 321 MA,.,;)Q.IESTE.R. eo.
_~!ECP~eC,.IJ/ PCVGJI~9<: ,JJ. y. IZU>3
BY / ~. _~.- BY Rc"r t;:-j/ BY
DATE "'2t:> itIA.A./ 15 DATEr!' I q-j
~ I
321 MAIN MALL POUGHKEEPSIE, N.Y. 12601
OWN ER70wAJ DF U)APPfJoJ 6&R.
Address H Il..l. 51. - Po. Box ~ 24
W~t'INIP6R5 ;=Ac..u.N.y. 12690
DATE
914-454-9440
.- ..-. ..
~
'$1;- "B~_.: STR'AlN: & "SON';' IN.C.. .....
329 Manchester Ad. (At. 55). P.O. Box 3396, Poughkeepsie. N.Y. 12603
MECHANICAL CONTRACTORS
PLUMBING - HEATING - PIPING - VENTILATING
AIR CONDITIONING - SHEET METi\L WORK
Hayward and Pakan Associates
321 Main Mall
Poughkeepsie, New York 12601
Februazy 25, 19 85
Rt=:CL:eVEn
Hzyo.'lard and Pak::n ".s~:cdes
En Zi r. ~rs-Arch: t:c ts - S u rVC:i:rs
RE: P:t''Ol::osal Fequest No.1 Da.ted 2/8/85
Wappingers Town Hall
HVAC Contract
FES 2 8 1985
Gentlercen :
We are sul:rni. tting our quotes for the above referena~d proposal request
as. follows:
Item No. 1 - Relocate firmed tube radiation and piping - No O1arge
Item No. 2 - Provide and install eight (8) fire danpers per plans
and specs - $1,353.00
If I can be of any further assistance, please feel free to call rre at
my office at 914-454-0600.
Very truly yours,
C.B. Strain and Son, Inc.
r<o-r
Inger D. Taft
Project Manager
cc:file
RDI': 1sv
. ,
HAYWARD AND
PAKAN ASSOCIATt==>
....
ENGINEERS
ARCHITECTS
SURVEYORS
PROPOSAL
REQUEST
AlA DOCUMENT Gi09
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
o
~
~
o
OWNER:
Wappinger Town Hall
Middlebush Road
Wappingers Falls, NY
Town of Wappinger
PROPOSAL REQUEST NO: 1
PROJECT:
(name, address)
DATE:
Feburary 8, 1985
TO: (Contractor)
I
C.B. Strain & Son, Inc.
329 Manchester Road
poughkeepsie, New York 12603
I
ARCHITECT'S PROJECT NO: 6508
CONTRACT FOR:
HVAC
L
-1 CONTRACT DATED: 11/08/84
Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modiiio-
tions to the Contract Documents deSCribed herein. .
THIS IS NOT A CHANCE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
DeSCriPtion: (W..n.n d"~"Pllon 01 the World
I
1. Relocate fin tube radiation and piping as shown on Drawing M-2 to accommodate
~~e relocation of assembly door.
2. provide eight (8) Fire Dampers in ductwork that penetrate gypsum board fire
stop. See Drawing M-l for location. Fire Dampers shall be as specified in
specification Section 15050 HVAC, and shall be installed in accordance with
SMAC:A standards.
Attachments: IlllI ....,h.d dOC\Jmon" ItUI ,yppo.. dne..".."nl
Drawing M-2 - 9/11/84 (February 8, 1985)
Drawing M-l
6/11/84 (February 8, 1985)
------------/
321 M.';IN M.';LL
POUGHKE:=?SIE. NY 12601
914-454-9440
..IM'