005-Ossie
,-:.']W,":_ ..._'>~,~_-"'"j.1r\Il.-_""
HAYWARD AND PAKAN ASSOCIATES
.---
ENGiNEERS ARCHITECTS SURVEYORS
CHANGE
ORDER
AlA DOCUMENT C701
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER
PROJECT: Wappinger Town Hall
(name, address) Middlebush Road
CHANG~ ORDER NUMBER: 5
TO (Contractor) .
I
Eugene Ossie, Inc.
P.O. Box 876
Highland, NY 12528
I ARCHITECT'S PROJECT NO: 6508
CONTRACT FOR: General Construction
L
.-J CONTRACT DATE: November 8, 1985
You are directed to make the following changes in this Contract:
Per proposal request #8, dated October 4, 1985, and signed by Eugene Ossie, Inc.
October,IS, 1985: Provide modifications to Proposed Access Way/Entry off Middlebush
Road
~;
The original Contract Sum was . . . . ~ . .
Net change by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order.
The new Contract Sum inciuding this Change Order will be . . . . . . . . .
The Contract Time will be (increased) (decreased) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is
S 784,217.00
S 49,213.00
S 833,430.00
. S 14,238.00
S 847,668.00
(
o ) Days.
Address
Address
Highland. NY
12528
Town of Wappinger
oW~~ll Street, P.O. Box 324
Adoress
Wappin~ers Falls, NY 12590
~AWARn ANn PAKAN AsSn~TATES
ARCHITECT
121 MAin Hall
Eugene Ossie, Inc.
CONTRACTOR
P.O. Box 876
::'~~ce~'_-
--
BY
BY
DATE 12 DeG 2.?G
321 MAIN MALL
DATE
DATE
POUGHKEEPSIE. N.Y. 12601
914-454-9440
'/
A\ ;i~AY'wARD AND PAKAN
\ \/~: ENGINEERS ARCHITECTS
~~
'\
,
October 21, 1985
ASSOCIATES
SURVEYORS
.-.. . ... l '
\''1 ~ ,'-~., .
.~ ~~ J ~~~ wi
;:1 ~~ t.~.\:: ':, ~ -, .
.~C';/, \",' ;"., "
HAROLD HAYWARD, P E
WALTER S PAK,~N P E
DOr.ALD G TOMLIN'" F' E
WII.FRED A ROHDE FE
ROGER A MASTRI L S
JOHN V KANE III H A AlA
PE TER R CA~jTLi""'E P t
Mr. Franc is J. Ver:3acc..~, ~~upervi sor
Tot.vr. or happinser-Tc)t.."TI Hall
Mill Street, P.O. Box 324
Wappingers Fal:s, NY 12590
CC T
., 1 19t~:.:i
.-
CHAHLE5 E L1SCLHv' I. A
'.AICl'--AEL N so,'!<'~ ~)E
Re: Acce:;s ROL.d Change O~:~der
Town Hall F aci li. t:'
Dear Mr. Versace,
At tached is a copy 0 f the Gener,~l Contract::>r' s (Eugene 0:::; s ie,
Inc.) proposal, to perform the wo~k as des:rib~d in Pr::>posal
Request No.8, for the amount of S14,238.0o. As you know,
this work was requested b:l the tu~:chess County Department of
I)ublic Works as a part of the Acc(~ss Permi:: pr:)cesf:,.
We have reviewad the cost and our estimate indicates that the
proposal is reasonable for the work entailed. On that basis,
we recommend that the proposal be accepted. Due to ti::le
considera~ions, I will expidite the Change Order and should
have that for you this week. reach to execute as soon as
apf roved by the TCvlTI.
If there are any questions, please call.
Very truly yours,
HA~NARD AND PAKAN ASSOCIATES
{J~ ~ eu:.~
Charles E. Liscum
Architect
CEL/lec
Enclosure
cc: 6508
321 MAIN MALL
POUGHKEEPSIE. N.Y. 12601
914-454-9440
-'f("" ...~> f ".~- -..~.. 9--~~=,.:-,~~~~:;;,.;~'~!:~~:;~t_Z1,.
ARCHITECTS
SURVEYORS
ri~v~1 V L.:;U
Hay.v::rd and P:;:,:m hs:;::iates~' .
En g; ne!! is-Arc ~:!~ cts- SUt\"?'ltlo"S
.'
~HAYWARD
It'"
~
E~GINEERS
AND PAKAN
ASSOCIATES
..
, ;
PROPOSAL
REQUEST
AlA DOCUMENT Gi09
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHB
OCT 1 5 1985
P:~O;EC.I: Wap?inger Town Hall.
(nam'!, aldres~) Middlebush Road
Wappingers Falls. NY
To',,!, of WappinE,er
PROPOSAL REQL'EST NO: 8
OVI!Nn:
DATE: OctobE'r 4. 1585
TO: (Contractor~
Eugene Ossie. Inc.
P.O. Boy. 876
HighLmc, NY 12528
I ARCHITECT'S PRO):CT NO: 65(!8
CONT'ZACT FOR: Geo,:!r.11 Construction
L
.e.J CO~J7RACT DATED: l'ove:nbEr 8. 198'.
f'leJSe;ubrrlt .in j'ernlz.~d quotation for changes n th~ (Jntra::r Sum and/,)r Time ,ncd!nl,,1 to propo\,~d modlfica-
Iwns Ie the Contra,ct Documents descnbed h.!rein.
THIS 15 NeT A CHANGE OR8ER NOR A DIR::CTION TO PROCE:D WITH THE WORK DESCRIBED HEF:EIN.
Descrrplon: (Writt." de1cnptlon 0' t"_ Worlll As indicated 011 the attached drawing:
1. Remove trees noted, flush cut. stump and grind 6" below shoulder grade.
2. Cut existing earth embankment to shoulJer grade.
3. Install reinforced concrete curb as shown and per detail 3/S-6.
4. Thicken pavement at apron as shown on section 2/1 and seal eXisting/new
,..- pavement joint.
S. Inst:111 a stop sign. NYSJOT type R2A. 24"x24". as shown on plan.
.'
Attachments: (Un .1l.ctI.d documents lh.l support description)
Drawing 1 of 1. Proposed Access-Way, dated 1/11/85 and revised 8/6/85.
Town of Wappinger
Add Amount:
JL~~
Signed
$ 14,238.00
cc:
t&--1~ ~
~""""'*-<a-,....
10/15/85
Date
.' .
"
.
321 MAIN MALL
POUGHKEEPSIE, N.Y. 12601
914-454-9440
..: ~~
.. .
,......~ ,~...i"_1T-"f";....- iii ,-'_'7-:'.~--;,":;