009-Ossie
8AYWARD AND PAKAN ASSOCIATES
ENGINEEi=lS
Ai=lCHITECTS SURVEYORS
CHANGE
ORDER
AlA DOCUMENT C707
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER
PROJECT: Wappinger Town Hall
(name, address) Middlebush Road
CHANCe: ORDER NUMBER: 9
TO (Contractor) .
IEugene Ossie, Inc.
P.O. Box 876
Highland, NY 12528
I ARCHITECT'S PROJECT NO: 6508
CONTRACT FOR: General Construction
L
~ CONTRACT DATE: 8 November 1984
You are directed to make the following changes in this Contract:
At the access drive to the Facility, per the Dutchess County
Departm~nt of Public Works, as follows:
1. Remove concrete curbing and replace
2. Patch asphalt paving as necessary
3. Sawcut existing roadway for paving joint
4. Improve shoulder to west with 8" Item 4 and
stone dust base for 110', including rock
removal as required.
i.
The original Contract Sum was . . . . . . .
Net change by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (~ere1t!ed) (t::l1"l'citan~ by this Change Order.
The new Contract Sum including this Change Order will be . . . . . . . . .
The Contract Time will be ~~ed-) (~erea-red) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is
Hayward and Pakan Associates
ARCHITECT
321 Main Mall
Address
~eepSie, NY 12601
By-===~E~~
Eugene Ossie,
CONTRACTOR
P.O. Box 876
Address
Highland, NY
12528
Inc.
DATE ZZ APE t;?(;
321 MAIN MALL
BY ~f1~
DATE . 'f /;;./ / rt.
POUGHKEEPSIE. N.Y. 12601
S 784,217.00
S 70,264.00
S 854,481.00
. S 3,960.00
. S 858,441.00
(---- ) Days.
Town of Wappinger
OWNEK
P.O. Box 324
Address
Wappingers Falls, NY 12590
BY
DATE
914-454-9440
. HAYWARD AND PAKAN ASSOCIATES
1:NGIN1:::i=<S
ARCHIT=C7S SURVEYORS
CHANGE
ORDER
AlA DOCUMENT C707
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER
PROJECT: Wappinger Town Hall
(name, address) Middlebush Road
CHANCE ORDER NUMBER: 9
TO (Contractor) .
I
Eugene Ossie, Inc.
P.O. Box 876
Highland, NY 12528
I ARCHITECT'S PROJECT NO: 6508
CONTRACT FOR: General Construction
L
~ CONTRACT DATE: 8 November 1984
You are directed to make the following changes in this Contract:
At the access drive to the Facility, per the Dutchess County
Departm~nt of Public Works, as follows:
1. Remove concrete curbing and replace
2. Patch asphalt paving as necessary
3. Sawcut existing roadway for paving joint
4. Improve shoulder to west with 8" Item 4 and
stone dust base for 110', including rock
removal as required.
i
The original Contract Sum was . . . . . . .
Net cf1ange by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (d-e~) (~rrg-edt by this Change Order.
The new Contract Sum inducing this Change Order will be . . . . . . . . .
The Contract Time will be ftrt-crea-3ed1 (d-eerened) (unchanged) by
The Date or Completion as of the date of this Change Order therefore is
Hayward and Pakan Associates
ARCHITECT
321 Main Mall
Address
~eepSie. NY 12601
BY ~E~~
Eugene Ossie, Inc.
CONTRACTOR
P.O. Box 876
Aadress
Highland, NY 12528
DATE '2Z Ape !7c,
321 MAIN MALL
BY~~
DATE . 7'/;l.~/r'
POUGHKEEPSIE. N.Y. 12601
S 784,217.00
S 70,264.00
S 854,481.00
. S 3,960.00
. S 858,441.00
(---- ) Days.
Town of Wappinger
OWNER
P.O. Box 324
Aacress
Wappingers Falls, NY 12590
BY
DATE
914-454-94.40
HA'lWARD AND PAKAN ASSOCIATES
c:NGINE::c:1S
ARCHITEC7S SURVEYORS
CHANGE
ORDER
AlA DOCUMENT C701
OWNER 0
ARCHITECT 0
CONTRACTOR 0
FIELD 0
OTHER
PROJECT: Wappinger Town Hall
(name, address) Middlebush Road
CHANGe ORDER NUMBER: 9
TO (Contrac:or) .
l . I
Eugene Oss~e, nc.
P.O. Box>876
Highland, NY 12528
"I ARCHITECT'S PROJECT NO: 6508
CONTRACT FOR: General Construction
L
~ CONTRACT DATE: 8 November 1984
You are direc:ed to make the following changes in this Contract:
At the access drive to the Facility, per the Dutchess County
Departm~nt of Public Works, as follows:
1. Remove concrete curbing and replace
2. Patch asphalt paving as necessary
3. Sawcut existing roadway for paving joint
4. Improve shoulder to west with 8" Item 4 and
stone dust base for 110', including rock
removal as required.
i
The original Contract Sum was . . . . . . .
Net change by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (de~) (~l'l~ by this Change Order.
The new Contract Sum induding this Change Order will be . . . . . . . . .
The Contract Time will be ~=edl (de~red) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is
S 784,217.00
S 70,264.00
S 854,481.00
. S 3,960.00
. S 858,441.00
( ----
Days.
Hayward and Pakan Associates
ARCHITECT
321 Main Mall
Address
poughkeepsie, NY 12601
BY &..J!- E.e.~ BY ~ ~
DATE "ZZ APe. ~'-' DATE . i /;J..~/r'
321 MAIN MALL POUGHKE=PSIE. N.Y. 12601
Eugene Ossie, Inc.
CONTRACTOR
P.O. Box 876
Town of Wappinger
OWNE?.
P.O. Box 324
AocreS5
Wappingers Falls, NY 12590
AooresS
Highland, NY 12528
BY
DATE
914-454-9440