009-Ossie 8AYWARD AND PAKAN ASSOCIATES ENGINEEi=lS Ai=lCHITECTS SURVEYORS CHANGE ORDER AlA DOCUMENT C707 OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER PROJECT: Wappinger Town Hall (name, address) Middlebush Road CHANCe: ORDER NUMBER: 9 TO (Contractor) . IEugene Ossie, Inc. P.O. Box 876 Highland, NY 12528 I ARCHITECT'S PROJECT NO: 6508 CONTRACT FOR: General Construction L ~ CONTRACT DATE: 8 November 1984 You are directed to make the following changes in this Contract: At the access drive to the Facility, per the Dutchess County Departm~nt of Public Works, as follows: 1. Remove concrete curbing and replace 2. Patch asphalt paving as necessary 3. Sawcut existing roadway for paving joint 4. Improve shoulder to west with 8" Item 4 and stone dust base for 110', including rock removal as required. i. The original Contract Sum was . . . . . . . Net change by previous Change Orders . . . . The Contract Sum prior to this Change Order was. The Contract Sum will be (increased) (~ere1t!ed) (t::l1"l'citan~ by this Change Order. The new Contract Sum including this Change Order will be . . . . . . . . . The Contract Time will be ~~ed-) (~erea-red) (unchanged) by The Date of Completion as of the date of this Change Order therefore is Hayward and Pakan Associates ARCHITECT 321 Main Mall Address ~eepSie, NY 12601 By-===~E~~ Eugene Ossie, CONTRACTOR P.O. Box 876 Address Highland, NY 12528 Inc. DATE ZZ APE t;?(; 321 MAIN MALL BY ~f1~ DATE . 'f /;;./ / rt. POUGHKEEPSIE. N.Y. 12601 S 784,217.00 S 70,264.00 S 854,481.00 . S 3,960.00 . S 858,441.00 (---- ) Days. Town of Wappinger OWNEK P.O. Box 324 Address Wappingers Falls, NY 12590 BY DATE 914-454-9440 . HAYWARD AND PAKAN ASSOCIATES 1:NGIN1:::i=<S ARCHIT=C7S SURVEYORS CHANGE ORDER AlA DOCUMENT C707 OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER PROJECT: Wappinger Town Hall (name, address) Middlebush Road CHANCE ORDER NUMBER: 9 TO (Contractor) . I Eugene Ossie, Inc. P.O. Box 876 Highland, NY 12528 I ARCHITECT'S PROJECT NO: 6508 CONTRACT FOR: General Construction L ~ CONTRACT DATE: 8 November 1984 You are directed to make the following changes in this Contract: At the access drive to the Facility, per the Dutchess County Departm~nt of Public Works, as follows: 1. Remove concrete curbing and replace 2. Patch asphalt paving as necessary 3. Sawcut existing roadway for paving joint 4. Improve shoulder to west with 8" Item 4 and stone dust base for 110', including rock removal as required. i The original Contract Sum was . . . . . . . Net cf1ange by previous Change Orders . . . . The Contract Sum prior to this Change Order was. The Contract Sum will be (increased) (d-e~) (~rrg-edt by this Change Order. The new Contract Sum inducing this Change Order will be . . . . . . . . . The Contract Time will be ftrt-crea-3ed1 (d-eerened) (unchanged) by The Date or Completion as of the date of this Change Order therefore is Hayward and Pakan Associates ARCHITECT 321 Main Mall Address ~eepSie. NY 12601 BY ~E~~ Eugene Ossie, Inc. CONTRACTOR P.O. Box 876 Aadress Highland, NY 12528 DATE '2Z Ape !7c, 321 MAIN MALL BY~~ DATE . 7'/;l.~/r' POUGHKEEPSIE. N.Y. 12601 S 784,217.00 S 70,264.00 S 854,481.00 . S 3,960.00 . S 858,441.00 (---- ) Days. Town of Wappinger OWNER P.O. Box 324 Aacress Wappingers Falls, NY 12590 BY DATE 914-454-94.40 HA'lWARD AND PAKAN ASSOCIATES c:NGINE::c:1S ARCHITEC7S SURVEYORS CHANGE ORDER AlA DOCUMENT C701 OWNER 0 ARCHITECT 0 CONTRACTOR 0 FIELD 0 OTHER PROJECT: Wappinger Town Hall (name, address) Middlebush Road CHANGe ORDER NUMBER: 9 TO (Contrac:or) . l . I Eugene Oss~e, nc. P.O. Box>876 Highland, NY 12528 "I ARCHITECT'S PROJECT NO: 6508 CONTRACT FOR: General Construction L ~ CONTRACT DATE: 8 November 1984 You are direc:ed to make the following changes in this Contract: At the access drive to the Facility, per the Dutchess County Departm~nt of Public Works, as follows: 1. Remove concrete curbing and replace 2. Patch asphalt paving as necessary 3. Sawcut existing roadway for paving joint 4. Improve shoulder to west with 8" Item 4 and stone dust base for 110', including rock removal as required. i The original Contract Sum was . . . . . . . Net change by previous Change Orders . . . . The Contract Sum prior to this Change Order was. The Contract Sum will be (increased) (de~) (~l'l~ by this Change Order. The new Contract Sum induding this Change Order will be . . . . . . . . . The Contract Time will be ~=edl (de~red) (unchanged) by The Date of Completion as of the date of this Change Order therefore is S 784,217.00 S 70,264.00 S 854,481.00 . S 3,960.00 . S 858,441.00 ( ---- Days. Hayward and Pakan Associates ARCHITECT 321 Main Mall Address poughkeepsie, NY 12601 BY &..J!- E.e.~ BY ~ ~ DATE "ZZ APe. ~'-' DATE . i /;J..~/r' 321 MAIN MALL POUGHKE=PSIE. N.Y. 12601 Eugene Ossie, Inc. CONTRACTOR P.O. Box 876 Town of Wappinger OWNE?. P.O. Box 324 AocreS5 Wappingers Falls, NY 12590 AooresS Highland, NY 12528 BY DATE 914-454-9440