Loading...
Reese Park Restroom Installation 01/20/2005 13:53 8454710905 PAGGI MARTIN DELBENE PAGE 01 PAGGI, MARTIN & DEL BENE ILP Consulting Engineer's & Land Surveyors 56 Main Street Poug~~sie, New York 12601 845-471-7898 845-471-0905 (FAX) January 20,2005 Town Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Hon. Joseph Ruggiero, Supervisor Reference: Proposed Reese Park Restroom Installation Contract No. 2004;.03 (103) Bid Recommendation Dear Supervisor Ruggiero & Board Members: On Tuesday January 18th 2005, bids were received and opened for Contract No. 20Q4..03 (103) by Deputy Town Clerk, Sandy Kisakowslci. The results were as follows: . Daniel A. Budd Excavating and Contracting . Colonial Buildings Excavation . H.B. Wiltse Excavating, Inc. . Marquise Constrction Corp. . T.D.T, Inc. $40,000.00 $41,750.00 $45,662.00 $54,215.00 $72,598.00 We have reviewed the above bids and find them to be numerically correct and in order. We have checked the references for Daniel A. Budd Excavating and Contracting, Inc. and find them to be acceptable. We believe that the bids submitted, though higher than the initial estimates, reflect current market conditions. We do not feel. re-bidding the work would provide any substantial reduction in prices bid since the lowest three .bids were relatively close in price. Therefore, if the town has the money available, we recommend this contract be awarded to Daniel A. Budd Excavating and Contracting, Inc. in the amount of $40,000.00. We further recommend this he done at the Town Board meeting scheduled for Monday, January 24th 2005, in order to expedite the start of work. JOBeph E. Paggi. Jr., P.E. Ernst Martin, JL. P.E., L.S. elurles R Del Bem;]r., ;F.E. REESE PARK RESTROOM INSTALLATION CONTRACT No. 2004-03(103) BID OPENING JANUARY 18TH, 2005/11:00 A.M. NO. CONTRACTOR BID AMOUNT NCC BID BONDI SIGNED CERT. CHECK I (JiJ 1 H.B. Wiltse Excavating, Inc. $ j / 907 Dutchess Turnpike if~{/tl Poughkeepsie, NY 12603 2 Ben Ciccone $ 151 Daley Road Poughkeepsie, NY 12603 William Manfredi Construction 3 Corp. $ P.O. Box 3383 Poughkeepsie, NY 12603 I o'!.- / 4 Colonial Builders $ If!; 76tJ ~ 816 Route 52, Suite 2 Fishkill, New York 12524 ( c.;x/ -- / 5 Marquise Construction $ j'if ;. /j- - J The Duke Building, Suite 9 I Thornwood, NY 10594 / tit / f- ! 6 TDT, Inc. $ 1; 51? 10 Dunwoodie Street Scarsdale, New York 10583 / / Daniel Bud Excavating & ti:;. / vi 7 Contracting $ t-/ ~ tj CO . 2 Hibernia Road Salt Point, NY 12578-2104 /: 8 L. Simon Corporation $ 35 Portman Road / 0 '7 (r New Rochelle, NY 10801 9 $ 10 $ 11 $ - 12/B2/2eB4 15:15 845471 B9B5 PAGGI MARTIN DELBENE PAGE Bl PAGGI,MARTIN &.DELBENELLP Consfllfing Engin"rs fJf Land Su.,.."tYflrs 56 Main Street PoughRepUc:, New York 12601 845-471-7898 845-471-0905 (FAX) December 1, 2004 J7.4 FAX. JU1L: Town Board Town of Wappinaer P.O. Box 324 Wappingen: Falls, New York 12590 Attention: Hon. Joseph Ruggiero, Supervisor Reference: Proposed Reese Park Restroom Installation Contract No. 2004..03(103) Dear Supervisor Rqggiero & Board JXlQm.bers: The design of the ProposQd Reese Park Restroom Installation, Contract No. 2004-03(103) is complete. Weare advertising for bids in the Southern Dutcheu News and PouslJkeep&ie Journal newspapers on Wednesday, December 8"\ 2004 and will have an award recommendation to the Town Board Members and the Town Clerk's office in advance of the January 241b, 200S meeting of the Town Board. Our activity schedule for the above referenced Contract is as follows; . Advenisement for Bids. . . . . . . . . . . . . . . December 8t1l, 2004 . Plans Available. . . . . . . . . . . . . . . . . . . . .. December 9*. 2004 . Bid Opening . . . . .. .. . .. . . .. . .. .. . ... January .ttl\ 2005 @ 11 ;00 A.M. /<i At this time, we request to be placed on the Agenda for the January 24111, 2005 Town Board tnceting. We would also like to reserve the large meeting room at Town Hall for the Bid Opening at the date and time above. We would also invite you to attend the bid openi.ni as your schedule permits. Please do not hesitate to oontaot our office if you or the Town Board members have any questions regarding this contract. Verr truly yours, .~~ Junior Design Engineer JES:law cc: Town Board: File Hon. Gloria Morse Hon. Graham Foster AlbertP. Roberts, Esq. Michael Tremper Joseph Ennesser, Town Recreation ]...oph E. Po Jt., P.E. Emit MmIn, Jr.. P.:t.. L.S. CbltlClIl Del. Bcnc,]t., 1'.E. - -- --~---- or')/, J-s, A ~ ~'/j' 1 r t_JA I) , l, \~ ! t ,~v rL~ (\./ ,- ! r~' - J / ( , yA c) ~l it ) t. 7) -_.~~ ~ I~) ~~~ . C .P-1'1.Jh.. tt -r }j(J: '" 0 ~ ~ - '-'.3 (/ tJ 3~) // Hu. p! -I~ #; co~~ f6~.. ~(~ p- 5-:A ~ 2 --J~ IVY /:L5~<-( ,), i _ tu'/4' - FAY N'.'/ tJ~ C~~k.1.1 [4. 707 :c9~~ YO LJ "1'.'~ '/ /; 1 1:<{,~3 ;) iJ~~L c~,tMf' H_"" iJ.(). 4rf- ~.3'8"3 -4- '# y!JP-<-<.~1 hi /~t.U . , NY. lilt!) , hl'VCft~~~Lr.'~~ { ~:'.= -~ (\~I'~A j',-:-.-Ld'j .J.< ~v.tc~ ') T-121,'"t--t--'1 t,.;,,-!..ort.:-r;( j"/ '( I t.: ,5'"1 4- 'f5/f-cJ3~~ "15:1- 'l~7() ~5;2.. - ~ ? f'L) ~S;2 - 6 9?lJ IJh)- R5~t) /Ibl~ t!35B ~n/b - 7/7~- ~.tJ:L 3- ILL ( ( L IhhLt- ~/f-) 7;.3 - ?38'3 r/JT ~. / . /0 ,{)~ ~ ~, 01 IDS?3 c ., C. /J, IJ;~ ~~ c~/L~7... -I- I;;~ At. t - SSoC' (/ 'j . # C~~ ../ p ...f N~~ ')"~ 0 -f~ Plt:4 - S 7r1.2.. cM.I- ~~ hi 1J57?- ~/Cf l t ':"," .. '. ADDENDA BULLETIN 1. Addenda may be published pertaining to this project. 2. Please complete this form to expedite prompt delivery of Addenda to you and mail immediatel y. 3. Do not use a Post Office Box Address, as telegram addenda cannot be delivered. 4. It is not necessary to complete this form unless you are a plans and specifications purchaser or exanuner. 5. Mail this completed form to: Town of Wappinger Attention: Town Clerk P.O. Box 324 Wappingers Falls, New York 12590 PROJECT: Contract 2004-03(103): Restroom Installation Addenda Bulletin Town of Wappinger Dutchess County, New York YOUR FIRM NAME: I I) r ) N (J~ YOUR STREET ADDRESS: Jo J) OAI it/JODIE 5CrtfLs T)A1-.t: ~)- AI Y ID6SJ YOUR CITY, STATE, ZIP CODE: YOUR PHONE No.: cJ i~. - 1;{ 3 ~/ j~' 3 FAX No.: 11;.J - 7:z 3 13 <[ 0 No. OF SETS OF PLANS AND SPECIFICATIONS PURCHASED: / PLEASE CHECK ONE: j PRIME CONTRACTOR SUBCONTRACTOR $ AD-I PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors 56 Main Street Poughkeepsie, New York 12601 845-471-7898 845-471-0905 (FAX) VIA FAX & CERTIFIED MAIL: December 30,2004 Reference: Reese Park Restroom Installation Town of Wappinger Dutchess County, New York Dear Contractor: Enclosed please find Addendum No.1 dated December 30th, 2004 for the above referenced project. Please acknowledge receipt of this addendum with this office by fax at (845) 471-0905. Total number of pages in this Addendum is 6 pages including this cover letter. A hard copy shall follow in the mail with return receipt requested. This Addendum contains responses to questions received from Contractors, as well as an additional bid Item in the Bid Proposal. This information is being circulated for your information, and it shall become part of the Contract Documents. Should you have any questions or comments, please do not hesitate to contact this office. Ven' truly yours, ~4/!lJf~~ CRD:law Enclosure Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene, Jr., EE. REESE PARK RESTROOM INSTALLATION ADDENDUM No.1 (12/30/04) TO THE PLANS AND SPECIFICATIONS DATED: DECEMBER 2004 1. The proposed access and sidewalk for the restroom is to be constructed of subbase, binder course and top course asphalt as specified in Item 2.01. 2. In the Bid Proposal, Page BP-5, the estimated quantity for Item 3.01 should be 15 cubic yards. Please replace Page BP-5 with the attached BP-5R. 3. On the revised Bid Proposal, Sheet BP-5R, Item 4.01 Rock excavation has been added. This Item has been included in the Contract in the event rock is encountered during the excavation for the restroom vault. All rock excavation will be performed by approved mechanical means. No blastin!! will be allowed. Measurement and payment for rock excavation will be based on cubic yards removed within the payment limits as defined under Item 4.01. Any rock removed outside of the payment limits will not be considered for payment. 4. Detail specifications for Item 4.01 Rock Excavation (pages 4.01-1 to 4.01-3) are attached and shall become part of the Contract Specifications. Please be advised that your acknowledgement of Addenda must be filled out on Page BP-l of the Bid Proposal. ITEM EST. UNIT DESCRIPTION WITH UNIT PRICE UNIT TOTAL NO. QTY WRITTEN IN WORDS PRICE PRICE 1.01 1 EA. PRECAST CONCRETE RESTROOM DOLLARS & CENTS $ lEA $ PER EACH 2.01 L.S. L.S. SITE CLEARING, GRADING, AND RESTORA nON DOLLARS & CENTS $ ILS $ PER LUMP SUM 3.01 15 c.Y. FOUNDA nON STONE (AOBE) DOLLARS & CENTS $ ICY $ PER CUBIC YARD 4.01 35 C.Y. ROCK EXCA V A nON DOLLARS & CENTS $ ICY $ PER CUBIC YARD BIDDER'S INITIALS BP - 5 (R) ITEM 4.01 ROCK EXCAVATION: 4.01.1 GENERAL DESCRIPTION Rock excavation shall consist of the removal of all materials necessary for the installation of the proposed precast vault and restroom not covered under Item 1.01 (Precast Concrete Restroom). Excavation, dewatering and satisfactory disposal of all surplus or unsuitable material necessary for the construction of the work in the locations and to the dimensions as shown on the Contract Drawings or as directed by the Engineer, shall be in accordance with these Specifications. The payment limit for rock excavation shall not exceed one (I ') foot clear around the outside walls, of the vault including nine (9") inches below the bottom of the vault as shown on the Contract Drawings. NO BLASTING WILL BE PERMITTED ON TIDS PROJECT. All rock in all areas shall be removed by approved mechanical means. 4.01.2 MATERIALS: Not Applicable. 4.01.3 CONSTRUCTION MEmODS: Rock excavation shall comprise of solid rock in the original bed or well-defined ledges, which can only be removed by continuous blasting and/or continuous drilling or use of jackhammers, and shall include all boulders or detached pieces of rock one-half cubic yard or more in size. Rock which can be removed using excavation equipment alone, will not be considered as rock excavation. Concrete paving, or other types of permanent paving, sidewalks, walks, curb and gutters, will not be considered as rock excavation. Frozen material will not be considered as rock excavation. In the event that rock is encountered, the Engineer will take cross sections of the rock uncovered. The Contractor shall not proceed with the excavation of the material claimed as rock until this material has been cross- sectioned and classified by the Engineer. The classification of material as "rock excavation" will be determined by the Engineer. Failure on the part of the Contractor to uncover such material, notify the Engineer and allow ample time for cross-sectioning the undisturbed surface of such material, will forfeit the Contractor's right-of-claim to any classification other than that allowed by the Engineer for the areas of the work in which such deposits occur. 4.01 - I ITEM 4.01 ROCK EXCAVATION (Cont.): A project meeting relative to the method, manner and procedure of approved mechanical means shall be held at the site with the Engineer, the Contractor, and representatives of all interested agencies, prior to the commencement of operations. If in the course of any excavation, damage or the potential thereof is occasioned to any utility facility used in transmission or distribution of gas, electricity, water, steam, telephone or telegraph, whether by direct contact, undermining of soil or other support thereof, or otherwise, the person having direction or control of such work shall promptly take all reasonable measures necessary to protect individuals and the public from loss or the potential thereof, and shall immediately notify the person, corporation or municipality owning or operating such utility of such damage or potential damage to its facilities. Neglect on the part of the person having direction or control of such works, responsible for any damage or potential damage to such facilities (a) to promptly take all reasonable measures or (b) to immediately notify the Owner or operator of the utility facility involved or damaged or potential damage to his facilities, occasioned by such person or under his direction or control, shall be a violation of this section and constitute a misdemeanor. Nothing herein contained shall preclude or prevent recovery of monetary damages by the Owner or operator of the utility facility involved or by any other person suffering damage from the disruption of utility services occasioned by excavation, blasting or other work in the vicinity thereof. The Contractor shall notify the Engineer after rock removal is completed. No structure, pipe or other material shall be placed in the excavated area until the Engineer has approved the depth of excavation and the character of the foundation material. The Contractor shall at all times keep the excavation free from water. The water shall be disposed of by the Contractor to the satisfaction of the Engineer and in accordance with the General Conditions and applicable laws and regulations. The Contractor shall provide all necessary pumps, dams, drains, ditches, flumes, well points and other means for excluding water and for preventing the above earthen slopes from sliding or caving. He shall satisfactorily remove all water which interferes with the work. The flow from all existing sewers, drains, utility lines and water courses met with shall be maintained and provided for by the Contractor without damage or nuisance to other parties. All connections shall be restored. 4.01 - 2 ITEM 4.01 ROCK EXCA VA TION (Cont.): Except where provided, no direct payment shall be made for the work of dewatering as specified above or herein, but compensation for such work and all expenses incidental thereto shall be considered as having been included in the price stipulated for Item 1.01 (Precast Concrete Restroom). The site of the work will be cleaned of all rubbish and surplus or unsuitable materials and promptly restored to its original condition as backfilling proceeds and work progresses. Pavements adjacent to the site of the work shall be constantly swept so as to prevent scarring of the pavement by scattered stones. No separate payment shall be made for clean-up. 4.01.4 MEmOD OF MEASUREMENT: This work will be measured for payment by the actual number of cubic yards of rock removed by mechanical means within the payment lines as indicated on the Contract Drawings, or as directed by the Engineer. 4.01.5 BASIS OF PAYMENT: This work will be paid for at the Contract Unit Prices per cubic yard for "Rock Excavation" by mechanical means not to exceed one (1 ') foot clear around the outside walls of the vault, including nine (9") inches below the bottom of the vault as shown on the Contract Drawings. The price bid shall include the removal and disposal of all excavated rock, and all materials, equipment, tools, labor and work necessary for or incidental to the completion of the Item. No rock shall be considered for payment if the Contractor fails to notify the Engineer of its presence and allows ample time for the Engineer to cross section the rock. 4.0 I - 3