Loading...
2009-2872009-287 Resolution Awarding Bid for Certain Repairs to the Town of Wappinger Highway Garage At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on September 14, 2009. The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor - Christopher J. Colsey Councilmembers - William H. Beale (arrived at 7:05 PM) Vincent F. Bettina Maureen McCarthy (departed 10:13PM) Joseph P. Paoloni ABSENT: The following Resolution was introduced by Councilwoman McCarthy and seconded by Councilman Bettina. WHEREAS, by Resolution adopted on the 13t" day of July, 2009, the Town Board adopted a Resolution authorizing the issuance of $400,000.00 Bonds to pay for the reconstruction of the Town Highway Garage Complex; and WHEREAS, bids and specifications were prepared by Robert J. Gray of Morris Associates, Engineer to the Town, for the work required for the reconstruction of the Town Highway Garage Complex; and WHEREAS, bids were duly solicited for the work to be done in connection with the reconstruction of the Town Highway Garage Complex; and WHEREAS, the following bids were received: Company Total Airflow, Air Conditioning, Refrigeration and Heating, Inc. $240,650.00 Idema General Contractors $251,240.00 Key Interior Acoustical, LLC $275,000.00 S&O Construction Services, Inc. $424,446.00 WHEREAS, by letter dated September 8, 2009, from Robert J. Gray, of Morris Associates, Engineers to the Town, it has been determined that the lowest responsible bidder is Airflow Air Conditioning, Refrigeration and Heating, Inc., with a bid in the amount of $240,650.00. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town of Wappinger hereby awards the bid for the reconstruction of the Highway Garage Complex to Airflow Air Conditioning, Refrigeration and Heating, Inc., in the amount of $240,650.00. 3. In accordance with the authorized bid specifications, the Town Board hereby authorizes the Supervisor to execute the contract documents as prepared by Morris Associates, including the Notice of Award and Notice to Proceed and forward a copy to Airflow Air Conditioning, Refrigeration and Heating, Inc., after the Attorney to the Town has confirmed that Airflow Air Conditioning, Refrigeration and Heating, Inc., has duly executed the contract documents, has supplied the necessary Performance Bond, Payment Bond and provided insurance certificates all as otherwise required by the bid specifications. The foregoing was put to a vote which resulted as follows: CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE MAUREEN McCARTHY, COUNCILWOMAN Voting: AYE JOSEPH P. PAOLONI, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 9/14/2009 The Resolution is hereby duly declared adopted. J C. MASTERSON, TOWN CLERK MORRIS ASSOCIATES J/VMENGINEERING CONSULTANTS, PLLC 199 Elks Lane, Poughkeepsie, New'York' 12601 Tei, (845)454-3411 Fbx: (845) 473-1962 . ❑ 187 Church Street, Poughkeepsie, New York 12601 Tel, (845) 471-7900 Fax: (845) 471-7901 ❑ 389 Fairview Avenue, Hudson, New York 12534 Tel: (518) 828-2300 Fax: (518).828-3963 E -Mall: moMsassociates®aol.com September 8, 2009 Town of Wappinger 20 Middlebush Road Wappingers Falls, NY 12590 Attn: Christopher Colsey Town of Wappinger Supervisor RE: Highway Services Garage HVAC, Firewall Construction and Electric Remediation. Project Contract No. 09-005 Dear Supervisor Colsey and Town Board; On August 17, 2009, the Town of Wappinger received four. (4) bid proposals for the above referenced project; the breakdown of these bids is as follows: CONTRACTOR HVAC HVAC FIRE WALL ELEC. TOTAL GARG #1 GARG #2 Airflow $85,465.00 $89,265.00 $44,700.00 $21,220.00 $240,650.00 Idema General $86,916_00 _ $81,378.00_ $46,496.00 Contractors _ _$36,450_00. _$251.240.00 ... Key Interior $82,000.00$102 ,000.00 $68,000.00 $23,000.00 $275,000.00 Acoustical, LLC S & 0 $142,652.00 $83,609.00 $177,500.00 $20,685.00 $424,446.00 Construction Services, Inc. This office has completed our. review of the bid proposals for the above referenced project. The apparent low bidder is Airflow Air Conditioning, Refrigeration & Heating Inc. of Highland,. NY, with a total bid of $240,650.00. Morris Associates has worked with Airflow Air Conditioning, Refrigeration & Heating, .Inc. on numerous projects and has found their work to be acceptable and it is our opinion that Airflow Air Conditioning, Refrigeration & Heating, Inc. is qualified to perform the proposed work required for this project. All portions- of the bid prepared by .r Supervisor Cossey and Town Board September 8, 2009 Town of Wappinger Page 2 Airflow Air Conditioning, Refrigeration & Heating, Inc. appear to have .been correctly executed. Based oh'the above, this' office' -recommends award of the noted contract bid - to Airflow Air Conditioning, Refrigeration & Heating, Inc. If you should have any questions regarding the above, please contact me at 454- 3411 ext. 30. Very truly yours, MORRIS ASSOCIATES Robert J. ray, PE Engineer to the Town RJG\cb Cc: Albert P. Roberts, Esq, (via email) Airflow Air Conditioning, Refrigeration & Heating, Inc. (via e-mail) John Masterson, Town Clerk, (via email) EAdocumentsU Wappingerla 2008\208157- Highway SpecificationsAward recomendation 9-1-09.doc