2005-122RESOLUTION NO. 2005-10_1e7_
RESOLUTION AUTHORIZING PROPOSAL FOR REPAIRS TO THE
FURNACE AND WATER TANK AT CARNWATH FARMS
At a regular meeting of the Town Board of the Town of Wappinger, Dutchess
County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New
York, on the 29`x' day of August, 2005, at 7:30 P.M.
The meeting was called to order by Joseph Ruggiero, Supervisor, and upon roll
being called, the following were present:
PRESENT: Supervisor -
Councilmember-
ABSENT:
Joseph Ruggiero
Robert L. Valdati
Vincent F. Bettina
Joseph P. Paoloni
Maureen McCarthy
The following Resolution was introduced by Ms. McCarthy and seconded
by Mr. Valdati
WHEREAS, Recreation Commission Member Joseph Ennesser has received a
proposal from Bottini Fuel for the installation of a new boiler at the administration
building at Carnwath Farms, and
WHEREAS, Bottini Fuel has provided an estimate of Five Thousand, Two
Hundred -Fifty an 00/100 Dollars ($5,250.00) for the project.
NOW, THEREFORE, BE IT RESOLVED,
1. The recitations above set forth are incorporated in this Resolution as if
fully set forth and adopted herein.
2. The Town Board if the Town of Wappinger hereby authorizes Bottini Fuel
to replace the boiler in the Administration Building at Carnwath Farms for a price not to
exceed Five Thousand, Two Hundred -Fifty an 00/100 Dollars $5,250.00.
3. The Town Supervisor is hereby authorized to sign the appropriate
agreements with Botinni Fuel for said project.
The foregoing was put to a vote which resulted as follows:
JOSEPH RUGGIERO, Supervisor Voting
ROBERT L. VALDATI, Councilmember
VINCENT F. BETTINA, Councilmember
JOSEPH P. PAOLONI, Councilmember
MAUREEN MCCARTHY, Councilmember
Dated: Wappingers Falls, New York
August 29, 2005
Voting
Voting
Voting
Voting
Ave
Aye
Aye
Aye
Aye
The Resolution is hereby duly declared adopted.
AC. MASTERSON, TOWN CLERK
CHAIRMAN
RALPH HOLT
TOWN OF WAPPINGER
RECREATION COMMITTEE
20 MIDDLEBUSH ROAD
WAPPINGERS FALLS, NY 12590-0324
(845)297-0720
Mr. Joseph Ruggiero Supervisor August 12, 2005
Town of Wappinger
20 Middlebush Rd.
Wappinger Falls, N.Y. 12590
Dear Mr. Ruggiero;
Enclosed you will find a quotation from Bottini Fuel
Co. for the installation of a new hot water furnace and
partner hot water tank at the commissions request to
move forward in preparing the Carnwath administration
building for immediate occupation by the recreation staff
and the future caretakers quarters. The review of the
existing unit proved to be well beyond repair and needs to
be totally replaced with an upgrade and a more efficient unit.
The new unit will provide for separate heating zones for
each floor for independent control by users. It is our request
to get your approval at this time to move forward to make
this happen immediately.
SUPERVISOR
JOSEPH RUGGIERO
TOWN COUNCIL
VINCENT BETTINA
MAUREEN McCARTHY
JOSEPH P. PAOLONI
ROBERT L. VALDATI
cc: R. J. Holt Rec. Chairman
INSTALLATION PROPOSAL
SALES EXECUTIVE: HARRY BUTLER
TOWN OF WAPPINGER DATE: August 11, 2005
20 MIDDLEBUSH RD BOX 324 PHONE# 845-297-9451
WAPPINGER FALLS, NY 12590 ACCOUNT# 63735
RE: WHEELER HILL RD-GREYSTONE/ADMINISTRATOR BUILDING
BOTTINI FUEL PROPOSES TO INSTALL THE FOLLOWING:
1, REMOVE
2. INSTALL
3. INSTALL
#PP -40.
4. INSTALL
5. INSTALL
6. INSTALL
7. INSTALL
8. INSTALL
9. INSTALL
EXISTING WEIL MCCLEAN BOILER.
ONE PEERLESS WBV-04-WPC CAST IRON BOILER.
ONE PEERLESS PARTNER INDIRECT FIRED HOT WATER HEATER
4 NEW HONEYWELL ZONE VALVES.
NEW SMOKE PIPES.
A NEW #30 EXPANSION TANK.
NEW FB38TU WATER FEEDER.
ONE BACK FLOW PREVENTOR.
ONE LOW WATER CUT OFF.
ALL NECESSARY MATERIALS AND LABOR FOR COMPLETION OF INSTALLATION.
PAGE 1
MECENC
AUG 1 2 200 c
By�
2785 W. Main Street, P.O. Box 1640, Wappingers Falls, NY 12590-8640
WWW.BO7TINIFUEL.COM
WASHINGT-5000 E
WAPP,INGERS FALLS
J TTINI
97-5000
845 297-5580
( )
FAX (845) 497-5029
X(845
1-800-836-3835 (FUEL)
FUEL
FAX (845) 297-5465
Serving The Community Since 1951
PORT JERVIS
(845)856-7831
RED HOOK
PA (570) 296-6814
(845) 876-3835 (FUEL)
1-800-492-3835 (FUEL)
FAX (845) 876-5454
FAX (845) 856-2281
INSTALLATION PROPOSAL
SALES EXECUTIVE: HARRY BUTLER
TOWN OF WAPPINGER DATE: August 11, 2005
20 MIDDLEBUSH RD BOX 324 PHONE# 845-297-9451
WAPPINGER FALLS, NY 12590 ACCOUNT# 63735
RE: WHEELER HILL RD-GREYSTONE/ADMINISTRATOR BUILDING
BOTTINI FUEL PROPOSES TO INSTALL THE FOLLOWING:
1, REMOVE
2. INSTALL
3. INSTALL
#PP -40.
4. INSTALL
5. INSTALL
6. INSTALL
7. INSTALL
8. INSTALL
9. INSTALL
EXISTING WEIL MCCLEAN BOILER.
ONE PEERLESS WBV-04-WPC CAST IRON BOILER.
ONE PEERLESS PARTNER INDIRECT FIRED HOT WATER HEATER
4 NEW HONEYWELL ZONE VALVES.
NEW SMOKE PIPES.
A NEW #30 EXPANSION TANK.
NEW FB38TU WATER FEEDER.
ONE BACK FLOW PREVENTOR.
ONE LOW WATER CUT OFF.
ALL NECESSARY MATERIALS AND LABOR FOR COMPLETION OF INSTALLATION.
PAGE 1
MECENC
AUG 1 2 200 c
By�
2785 W. Main Street, P.O. Box 1640, Wappingers Falls, NY 12590-8640
WWW.BO7TINIFUEL.COM
WAPPINGERS FALLS
(845) 297-5580
1-800-836-3835 (FUEL)
FAX (845) 297-5465
RED HOOK
(845) 876-3835 (FUEL)
FAX (845) 876-5454
8 TTINI
FUEL
Serving The Community Since 1951
WASHINGTONVILLE
(845) 497-5000
FAX (845) 497-5029
PORT JERVIS
(845)856-7831
PA (570) 296-6814
1-800-492-3835 (FUEL)
FAX (845) 856-2281
SALES EXECUTIVE:HARRY BUTLER ACCOUNT46375/T2WN OF WAPPINGER
THE INSTALLED PRICE FOR THE AFORE MENTIONED WORK WOULD BE:
$5,250.00
THE INSTALLED PRICE INCLUDES ALL NECESSARY PARTS AND LABOR.
PAYMENT: PAYMENT IN FULL UPON COMPLETION.
THIS INSTALLATION COMES COMLETE WITH A FULL ONE (1) YEAR WARRANTY
ON BOTH PARTS AND LABOR.
U ARE
NOTE: THE WARRANTYCOVERAGE
BOTTI�NIEIS FUELVONIDHEROAUTOMATVIDED OHASING
IC DELIVERY
YOUR FUEL OIL
PROGRAM."
IF YOU ARE NOT ON THE "AUTOMATIC OIL DELIVERY PROGRAM" WITH
BTINI FUEL THERE
IS WILLABENBILLABLEYEAR
ATMANUFACTURER'S
LABORRPATES RANTY ON
PARTS ONLY. LABOR
THIS PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED WITHIN
THIRTY (30) DAYS FROM THE DATE ON THIS PROPOSAL.
THIS PROPOSAL IS CONTINGENT ON BOTTINI CREDIT DEPT. APPROVAL.
***DEFERRED PAYMENT OPTION IS VOID UPON SALE OF HOME OR UPON
TERMINATION OF ACCOUNT***
PROPOSAL SUBMITTED BY: %'
DATE: VD�
ACCEPTANCE OF PROPOSAL:
THE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY
AND ARE HEREBYMENTEWILD BEOMADEARE
ASUOUOTLINED OON PAGEDO H2 WORK AS
SPECIFIED. P
DATE:
SIGNATURE: T,
P�7��
j� E
PAGE 2 AUG 1 2 200
BY4==:---
2785 W. Main Street, P.O. Box 1640, Wappingers Pails, NY 12590-8640
WWW.BOTTINIPUEL.COM