Loading...
2004-132RESOLUTION NO. 2004-132 RESOLUTION AUTHORIZING CHANGE ORDER NO. 2 OR 99-2R CONTRACT NO. 7: CLEARWELL AND PUMP INSTALLATION At the regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on the 22nd of March, 2004, at 7:30 P.M. The meeting was called to order by Joseph Ruggiero, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor - Councilmember- ABSENT: Joseph Ruggiero Robert L. Valdati Vincent F. Bettina Joseph P. Paoloni Maureen McCarthy The following Resolution was introduced by Mr. Paoloni Ms. McCarthy and seconded by WHEREAS, the Engineers to the Town, Paggi, Martin & Del Bene have approved Completion Change Order No. 2 for Wappinger Water Improvement Area- 1999-2R-7:Clearwell and Pump Installation as per a letter dated February 26, 2004, a copy of which is attached hereto. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth ate incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves completion change order No. 2 to Wappinger Water Improvement Area -1999-2R, Contract No. 7: Clearwell and Pump Installation between the Town and Weltech Construction Corporation at no additional cost for the reasons set forth in the letter dated February 26, 2004 from Joseph E. Stankavage of Paggi, Martin & DelBene to the Town Board. The foregoing was put to a vote which resulted as follows: JOSEPH RUGGIERO, Supervisor Voting ROBERT L. VALDATI, Councilmember Voting VINCENT F. BETTINA, Councilmember Voting JOSEPH P. PAOLONI, Councilmember Voting MAUREEN MCCARTHY, Councilmember Voting Dated: Wappingers Falls, New York March 22, 2004 Aye AyP Aye Aye Aye The Resolution is hereby duly declared adopted. 03/18/2004 12:4`J b454(lbybt) f AUU1 MPKI1N UtLbtNt hAUt Ui PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land Surveyors 56 Main Strect Poughkecpsie, New York 12601 845-471-7898 845-471-0905 (FAXQ February 26, 2004 Town of Wappiunger F.O. Box 324 Wappingers Falls, New York 12590 Reference: Proposed Wappinger Water Improvement 99-2(R) Contract 99-2(R)7: Clearwell & Pump Installation Change Order No.2 Dear Supervisor Ruggiero & Board Members: Enclosed please find Change Order No.2 for the above referenced project. This change order is to allow the Contractor to substitute a wood frame roof truss for the steel truss originally specified. The Contractor has also proposed to construct a painted finished ceiling through the entire building for the same price as the original steel truss. We had originally proposed an exposed steel scissor truss for the roof to provide extra headroom inside the new building. After the Contractor proposed to use wood trusses, we looked again at the original designassumptions and determined that the extra headroom was not an absolute necessity. At the time we also discussed this change with CAMO Pollution Control. They were in agreement that the finished ceiling would be an improvement to the original plans. Enclosed with the change order is a copy of a letter describing the proposed substitution from the Contractor, Waltech Construction Corporation. Along with the letter, we have enclosed price •quotes fr6m1he Truss Manufacturers. We believe that this change will simplify construction and result in an improved finished product overall, We would please ask that this iten be placed ,on the March 22, 2004 Town Board meeting agenda for your7eview aid approval. If you•slould have any'qu65tiohs or concerns, please do not hesitate to contact this office. Very truly youra;:;' oseph E. Stankavage JES:pr enclosure: ccr TMAMBo rd; File Gloria Mofte; Tdwn 'Clerk Albert P. Roberts, Esq. Michael Tiemper Eric Fellenzer: Joeeph E. Paggi Jr., P.E.. .. E•rnn Martin, Jr., P.E., L.S. - Charley: R. Drl;Bene, Jr., P.E. r-Hl70l IYIHK 11N LtL.=Nt CF NGE ORDER NO. 2 DATE: ENGINEER'S PROTECT NO.: 1999-2(R)-7 PROJECT: PROPOSED WAPPINGER WATER IMPROVEMENT 1999-2CR) CONTRACT 99-2(R)-7: Clearwell and pump Iwtaiktion Construct wood truss roof and full interior sheetrock NATURE OF CHANGICS: ceiling instead of proposed ' exposed steel truss roof. Letter from Waltech Construction Corp- dated 2/16/04 ENCLOSUM: des crib ing proposed subatitutiHn with price quotes for trusses. ADJUSTMENT OF CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: PRIOR CHANGE ORDER TMS CHANGE ORDER (+,-): REVISED CONTRACT AMOUNT: ADMTMM OF CONTRACT TIME: S 768,992.00 + 6,870.00 S S mm 775,862.00 CONTRACT T24B PRIOR TO THIS CHANGE ORDER 120 Days (DAYS OR DAT13 NEW (INCREASE)(DEOMASE) RESULTING FROM TEES CHANGE ORDER None (DAYS) CURRENT CONTRACT TINM INCLTIDING TRIS CHANGE ORDER 120 Days (DAYS OR DATE) OTBER CONTRACTS AMCTIW: S'UBNfr= BY: DATE (Engineer's Si.goatum) APPROVED BY: DATE (Owner's Sigman=) ACCEPTED BY, DATE (Contractor's Signature) DISTRI}3'LTTION: OWNER [ ) CONTRACTOR [ ) ENGINEER [ l kIFS.D REPP S=A= [ I Post -It® Fax Note 7671 paw TO Fro Co Dept. Phone #Co. Phone h IIAUt el 03/18/2004 12:36 8454710905 PAGGI MARTIN DELBENE PAGE 02 !'tiV !U U'c mvil l l JU Aw rrni.iuvu iron «v, Uni ild Lttf t, Li 7 COn5tr"t. diff Cowmbon February 16, 2004 Mr. Charles Del Bene Paggi, Martin & Del Bene 56 Main Street Poughkeepsie, NY 12601 Subj: Town of Wappinger Clearwell and Pump Installation Wood JIUM Dear Charlie: In accordance with your letter of February 9, 2004, below is our estimate for providing conventional trusses and a sheetrock ceiling in lieu of the specified steel trusses. Delete steel trusm ($10,695.00) Pressure treated wood trusses 3,721.05 Dbl- PT 2x12 sill 1,000.00 Sheetrock, taping, spackling, paint 1231SF @ $3 3,693.00 Framing, &.finishing ceiling @ roof scuttles 4 @ $580 232Q QL1 Total $39.03 As we had previously offered, we will provide the ceiling at no additional cost to the owner. If you have any questions, please contact us. Very truly yours, Donald T. Walton �PGSA(lent 503 Route 17M a Middletown, Now York 10940 • (845) 343-1580 • Fax (845) 343-21.41 03/18/2884 12: 3b I34b4 /"14905 10=19�Y003 II:08 FROM-RELIA81.6 TR O INC Reliable Truss & Components Inc. ZW WELBY RD. ?4EW beDI OM MA. 90&,494-j877 F'HUCal MAK 11N Dtl-61=Nt "AUt Uel 1$0887l1it4 � T-883 P. tag/00? K-1?0 5011-99.1-ituzo t070p7� (FOX) 5011-0t"7k4 LIGHT GAUGE STEM, TRUss Quorr, Proposal i#3081161S Atin: Estimuing DepanrAert Project_ Towrn of Wappinber Pump Dutchess County, NY YES NO Date: October 8, 2003 P ice: enlpt Sales Tax, - Total: PrtE2 1,gItides The ,� —1 -- Connections (] Truss co Truss Gannucfionx 0 Truss to 8carintco,nncctim Bracing [a Web Lateral araoing ® ❑ SOTMm Chord Lateral Bruchig ❑ Bj Diaphragm and/or Top Chord aracilig ❑ Tempo(ary omcitig Xtnstalliflon [] (� lnst+elludolt (if yes Ste pAgc N/A) 3alCsTPC PlAns Dated; 07/23/03 Specs Dated; Loading: 3S-10-00.10 Deflation: L/240 S10,G9�_OIPi 510,�3;OU Spacing: 24" 0c.: -• u.. lanwlc vl ii -?ping rnglu P. up mQTal rruaseg, home minornpairs may nmod to be ma4e in the field by ihQ COl►tl'f{CH/L � r~� Ruycr Ia rcuponslb)e for Wiloading tfums- Tao huunt of unlondind time per rlvck 1.1111 101[led, oycrrinw In b1104 at $60 her hour, Purc1iw Tcrrnc SO'A doom, nat COD. "Prlcn v211d for 34 Dny.s --._ ..,... row. I Aiwa Pd ac 1 of 1 Trusses ($I Q Rnnf.Truises Q �l Flaerrn,sses a Valley Stu Connections (] Truss co Truss Gannucfionx 0 Truss to 8carintco,nncctim Bracing [a Web Lateral araoing ® ❑ SOTMm Chord Lateral Bruchig ❑ Bj Diaphragm and/or Top Chord aracilig ❑ Tempo(ary omcitig Xtnstalliflon [] (� lnst+elludolt (if yes Ste pAgc N/A) 3alCsTPC PlAns Dated; 07/23/03 Specs Dated; Loading: 3S-10-00.10 Deflation: L/240 S10,G9�_OIPi 510,�3;OU Spacing: 24" 0c.: -• u.. lanwlc vl ii -?ping rnglu P. up mQTal rruaseg, home minornpairs may nmod to be ma4e in the field by ihQ COl►tl'f{CH/L � r~� Ruycr Ia rcuponslb)e for Wiloading tfums- Tao huunt of unlondind time per rlvck 1.1111 101[led, oycrrinw In b1104 at $60 her hour, Purc1iw Tcrrnc SO'A doom, nat COD. "Prlcn v211d for 34 Dny.s --._ ..,... row. I Aiwa Pd ac 1 of 1 rj...)/ Lot --r)U,4 1L. JD 0 4 Zw) L4 I V V rl Z) rHVUl lllHR I L11i tale) �isrls0 Aml Ism us-lWl CUSTCMG ADORES& Rod & MOVY'Duesel DWAelburs )told PlIONE! -5w S(hqmdady, Ky, 11-x6 IDATrc j wrAm oj�-w 4AMPURSOW Es 090D FOA III VAY� .,Y2/0 —/ SPACING MOM LCOT •Amw Lerl MaK7 LgW" 7'.CD.M. ckw aWr nary! rix 46 ".771 AQ0FING! COX & SHINGLES 13 FURLIN3 A me SLATE M TILE 'iWNG AFT01-0 NOI.- O,H, OUT; KUMS 0 SQUARE WALL SIM tiA 2xe 2ga OTHER mponenit lis o. Date: FwMewod Shop I)rvtw)N)iy, Yos Nr, V of a buyer Ic 11 to 1.) m5ponsIblIlly of a Wyer to oonfirm Wl ituu quantiOrts and (irmono lons on this form, Blgnlmg thts form vonolllijlu an rxr.6i hie oomponorm as listed. Byllo 60/10 Id HUMES ON xvi 0100V SN3011DO YA1136 Ltd tO,'tl NOW ME