Loading...
2009-3492009-349 Resolution Authorizing Change Order No. 1 for Highway Services Garage HVAC Project At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on November 9, 2009. The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Christopher J. Colsey William H. Beale Vincent F. Bettina Maureen McCarthy Joseph P. Paoloni The following Resolution was introduced by Councilman Bettina and seconded by Councilman Beale. WHEREAS, the Engineers to the Town, Morris Associates Engineering Consultants, PLLC, have approved Change Order No. 1 to the Contract for Highway Services Garage HVAC Project as per letter dated October 29, 2009. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves Change Order No. 1 in the amount of Three Thousand, Two Hundred Eight Dollars and 50/100 ($3,208.50), dated October 27, 2009, for Highway Services Garage HVAC Project Contract between the Town of Wappinger and Airflow Air Conditioning, Refrigeration & Heating, Inc., resulting in a new Contract sum in the amount of Two Hundred Forty -Three Thousand, Eight Hundred Fifty -Eight Dollars and 50/100 ($243,858.50), for the reasons and associated costs set forth in the letter dated October 29, 2009, from Morris Associates Engineering Consultants, PLLC, a copy of which is affixed hereto. The foregoing was put to a vote which resulted as follows: CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE MAUREEN McCARTHY, COUNCILWOMAN Voting: ABSENT JOSEPH P. PAOLONI, COUNCILMAN Voting: ABSENT Dated: Wappingers Falls, New York 11/9/2009 The Resolution is hereby duly declared adopted. --?11-IN C. MASTERSON, TOWN CLERK MORRIS ASSOCIATES ENGINEERING CONSULTANTS, PLLC 9 Elks Lane, Poughkeepsie, New York 12601 Tel: (845) 454-3411 Fax: (845) 473-1962 ❑ 389 Fairview Avenue, Hudson, New York 12534 Tet: (518) 828-2300 Fax: (518).828-3963 E -Mail: monisassociates@aol.com October 29, 2009 Town of Wappinger Town Board Town Hall 20 Middlebush Road Wappingers Falls, NY 12590 Attn: Hon. Christopher Colsey, Supervisor RE: Highway Services Garage HVAC Project Addition of Fire Door Change Order #1 Dear Mr. Colsey and Town Board Members: Enclosed please find a copy of Change Order #1. The purpose of this change order is to install an additional fire door between the Highway Superintendents office and the garage area. Presently a non fire rated door exists and was scheduled to be removed and closed up using concrete masonry units. The Highway Superintendent has requested this doorway remain, necessitating the change order to install a 3 -hour fire rated door. We requested the contractor, Airflow Air Conditioning, Refrigeration & Heating, Inc. to provide the cost to provide and install the door for an additional $3,208.50. This amount includes a credit for the concrete masonry units that will not be installed. Therefore, the new contract total will be $243,858.50 ($240,650.00 + $3,208.50 = $243,858.50). Please place this on the agenda for the November 9, 2009 Town Board Meeting for approval .of Change Order #'1. Please call me at (914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this matter prior to the meeting. Very truly yours, ASSOCIATES ng Consultants, Robert J. Gray, Engineer to the RJG/met Enc. Cc Albert Roberts, Town Attorney John Masterson, Town Clerk Oct 27 09 10:35a AIRFLOW CHANGE ORDER PROJECT: Town of Wappinger Highway Garage HVAC Improvements,Firewa 20 Middlebush Rd Wappingers Falls, NY 12590 TO: Airflow Air Conditioning. Refrigeration & Heati PO Box 941 Highland, NY t2528 The Contract is changed as follows: 8457955742 p•3 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ CHANGE ORDER* 1 CHANGE ORDER DATE: 10/27f2009 PROJECT #s: 09-005 DATE OF CONTRACT: 09/21f2009 FOR: Change Order related to firewall construction In Graham Fosters office: > Furnish and install new 3 hour rated door between office area and service garage. > Similar door as one provided between office reception and file room. > Similar direction of swing as existing non -conforming door. > Install new 3 hour fire rated door in place of c.m.u. block infill. > Gross change order cost for material and labor including freight = $ 3,200.00 > Applied credit for c.m.u. block infill labor = $ -200.00 > Applied credit c.m_u. block infill material = $ -210.00 > Net change order cost for material and labor = $ 2,790.00 > 150/6 allowable override percentage - on site cost only = 418.50 > lump sum change order = $ 3,208.50 DATE Highland, NY 12528 !3Y (Signature) John A. Durkin, President (Typed 1Yame) DATE 1027!2009 Wappingers Falls, NY 12590 BY (Signaft") DATE Quantum Software Solutions, Inc. Document $240,650.00 The original Contract Sum was The net change by previously authorized Change Orders is $0.00 The Contract Sum prior to this Change Order was $240,650.00 The Contract Sum will be increased by this Change Order in the amount of $3,2013.50 The new Contract Sum including this Change Order will be $243,858.50 0 days. The Contract Time will be unchanged. The date of Substantial Completion as of this Change Order therefore is Unchanged Not valid until signed by all parties below. Morris Associates Airflow Air Conditioning, Refrigeration 8 Heati Town of Wappinger ARCHITECT CONTRACTOR OWNER 9 Elks Lane PO Box 90 20 Middlebush Rd nnnRFSS ADDRESS ADDRESS DATE Highland, NY 12528 !3Y (Signature) John A. Durkin, President (Typed 1Yame) DATE 1027!2009 Wappingers Falls, NY 12590 BY (Signaft") DATE Quantum Software Solutions, Inc. Document